Permit (152) CITY OF TIGARD
,,,;,,�.; DEVELOPMENT SERVICES PERM I T # BULDIING PERMIT
L 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639.4171 - BUP97 -0427
\( DATE ISSUED: 09/30/97
` II PARCEL: 2S115BA -00101
SITE ADDRESS...: 16200 SW PACIFIC HWY #S
SUBDIVISION • ZONING:C —G
BLOCK • LOT • JURISDICTION:TIG
REISSUE: 4i; FLOOR AREAS EXTERIOR WALL CONSTRUCTION —
CLASS OF WORK.: ALT \ ( FIRST • 0 sf N: S: E: W:
TYPE OF USE...:COM SECOND...: 0 sf PROTECT OPENINGS?
TYPE OF CONST.:3N ...: 56242 sf N: S: E: W:
OCCUPANCY GRP.:M TOTAL : 56242 sf ROOF CONST: FIRE RET ?:
OCCUPANCY LOAD: 0 BASEMENT.: 0 sf AREA SEP. RATED:
STOR.: 0 HT: 0 ft GARAGE...: 0 sf OCCU SEP. RATED:
BSMT ?: MEZZ ?: REQ) SETBACKS REQUIRED
FLOOR LOAD • 0 psf LEFT: 0 ft RGHT: 0 ft FIR SPKL: SMOK DET..:
DWELLING UNITS: 0 FRNT: 0 ft REAR: 0 ft FIR ALRM: HNDICP ACC:
BEDRMS: 0 BATHS: 0 IMP SURFACE: 0 PRO CORR: PARKING: 0
VALUE. $ : ' .. , 0
Remarks : lemolition .f office /mezzanine. Add demising wall to create 2 tenant
spaces & separate u 1 1 ies.
Owner: FEES
CAPITAL /BIT HOLDINGS TWELVE IN type amount by date recpt
C/O FORUM PROPERTIES PRMT $ 558.00 DRA 09/08/97 97- 299010
8705 SW NIMBUS 5PCT $ 27.90 DRA 09/08/97 97- 299010
BEAVERTON OR 97005 PLCK $ 362.70 DRA 09/08/97 97- 299010
Phone #: 626 -2277 FIRE $ 223.20 DRA 09/08/97 97- 299010
Contractor:
SCHWAGER DAVIS INC
500 PHELAN AVE
SAN JOSE CA 95112
Phone #: 408 - 294 -5224 $ 1171.80 TOTAL
Reg #..: 107560
REQUIRED INSPECTIONS
This permit is issued subject to the regulations contained in the Framing Insp
Tigard Municipal Code, State of Ore. Specialty Codes and all other Gyp Board Insp
applicable laws. All work will be done in accordance with
approved plans. This permit will expire if work is -not started
within 180 days of issuance, or if work is suspended for more
than 180 days. ATTENTION: Oregon law requires you to follow the
rules adopted by the Oregon Utility Notification Center. Those
rules are set forth in OAR 952-0014010 through OAR 952-00101987.
You many obtain a copy of these rules or direct questions to OUNC
by calling (503)246 -1987.
Permittee Signature:
C.C1k. I ssued B y: R1 1 — 1
+++++++++++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ++
Call 639 -4175 by 6:00 p.m. for an inspection needed the next business day
+++++++++++++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + + ++ + + + + + + + + + + + + + + ++
p 09/05 11:06 1997 FROM: 503 684 7297 TO: 5032281285 PAGE: 3
09/05/97 10:38 x'503 684 7297 CITY OF TIGARD 4003/006
CITY OF TIGARD OTC Commercial Building Permit - Redd ay o' '
13125 SW HALL BLVD. Tenant Improvement D Redd °� �'
TIGARD, OR 97223 „ [� r Date m P.E.
(503) 639 -4171 /I U'` I to '— ��
yu. qd Permit* - C_3 - _ '
Print or Type ` tea swR
Incomplete or illegible applications will not be accepted caw
Job T" G i 9R Oa�s4 A/?f
Address Street Adara�s
/ 0 e'� 9 8ulldingt+lew BuildBuilding .200 Sid I i ,_
Bldg `Cnyiamte zip Building
_ 1 7/64�4O 9 7244::-.. Data
P ie C40 / / z / 6 lAWItGJ CIU/6; pr GQ�vO Existing Building or Property:
e10 fdi2rirr�`) SANp9Wv5 Fe- ( 'F Gcale S r. . - -
/�IjjEl 890 ' Proposed Use of Building or Property:
P ,jefrtanv q.7oo5 626,-z277
Name - /h ably/J /4JE 61;tiG
I/Ac4icir . L L e J *6 Wage tL� > , .
Occupant eMaling Address Butte �n No. Of Stories:
�Of1 / 7 " l77c2t&rJc.,
City/State Ziv Phone ' 19¢ f ' F Sq. Ft Of Project .ii
Name �l/F'Z Occupancy Class( )
Contractor Malmo Adder Salta =AM/ . ' ' '
cit Phone
,52,8 5'X
- type(s) of Construction f
f --
(Prior to Issuance Oregon Cont. Cont. Board Liu.* Exp. Date Vilill this project have a Fire Suppression m?
a copy of all Yes No
licenses are Oregon Cont. Cont. Boast Lim* Exp. Date 6:ea/WC 0
expired in COT Business Tex or Metro a dap. pate Project Valuation $ ASV, 000
C.O.T.data base)
Name Americans with Disabilities Act (ADA)
Architect Grayp Irk 40,7 Zit, Valuation X25% = $ 27.570 . 0 Participation
Mailing Address suite Complete Accessibility Form
06 f0 Skiidae zfi•
[Plans zp Prone Required: TWO (2) SETS
i'n 972a/ -oa.3 y , U4-95G0
1
Engineer Nam ` M'
l /J/ei y ,4 c. 1 • • I heres aolotowted that I have read this
�/ application, that the information
mailing - ' sum given is correct that I am the owner or authorised agent of the owner. and
5¢2 SC Zak A that plans submitted are hi compliance with Oregon State t.awa.
City/Siam chi 7� _ 65,4394 Sire of Owner /Agent Date
Indicate type of work New 0 Addnlon 0 pemalleen . cam" 7 . 71 - 27
Accessory Structure 0 Fou Motion Only 0 Altermdon . Contact Person Name piton
Repair O Other 0 Joan flonj 2-' (7
Description of work
40€010'0,41.0C,9 /ix -u4Oie . 4,Q/q/d o f FOR OFFICE USE ONLY
a�/7 cnrf� 2.1' ✓ij paces � rsyara , . X51 Ra -Q Olol I. .nd um ' X .
orA//f»cs. Alai Ti /Ct P"Tr, J . .
Parks: Estimated 0 of Employees 4/
Now Site Work Permit Appllndon meet precede or accompany Betiding
Permit Appliction
I :tCOMMAPP.DOC (DST) 10!96
•
09/05 11:07 1997 FROM: 503 684 7297 TO: 5032281285 PAGE: 8
4• 09/05/97 10:39 X508 684 7297 CITY OF TIGARD
CITY OF TIGARD
Date Recd:
OTC COMMERCIAL TENANT IMPROVEMENT Recd By:
APPLICATION/PLANS SUBMITTAL REQUIREMENTS
Applicants: Please complete
1. APPLICANT NAME: .6/10 � �if/Z / E PHPN -
7764,2.0 TdwNE J 'J4rZ5
`_. PHONE #: �,'ZrJ 5:5
2. SITE ADDRESS: / SW iF /G f/Zd ` � FAX # ZZg-
1. A. SITE PLAN (Fully dimensional, drawn to scale) labeled with:
0 map & tax lot #, 0 project name, 0 site address 13 suite number
Q zoning, 0 applicant name, ❑ phone number.
B. North Arrow.
C. Scale (Any standard, architectural or engineering only).
D. Street Names.
2. TWO FULL SETS OF BUILDING PLANS (no red line revisions or tapeons).
■ a _S I r D = OW - . = I O - • i• r.
A. FLOOR PLAN(S)
B. WALL DETAIL
C. REFLECTIVE CEILING PLAN
D. SEISMIC BRACING DETAIL FOR SUSPENDED CEILING
E. SPECIFICATIONS & CALCULATIONS
F. ADA BARRIER REMOVAL WORKSHEET
G. DEPOSIT - BASED ON VALUATION OF PROJECT
1:SFAPP.DOC (DST) 4/97
•
•
SUBJECT: ACCESSI6ILfTY _
BARRIER REMOVAL IMPROVEMENT PLAN
•
REQUIREMENT: OREGON REVISED STATUTE (ORS) 40.241.
( Every project for renovation. alteration or modification to affected buildings and related fad shad be
made to insure that the path of travel to the altered area and the reatroon% telephones and druddng
fountains are readily accessible to individuals with disabilities. unws such alterations are disproportionate
to the overall alterations in terns of coat and scope
(2) Atteradons made to the path of travel to an altered area may be deemed dhpropwdonats to the overall
alteration when the east exceeds twenty -Ave per -cent (2376).
•
VALUAT1O144 of all renovation, alteration or modification being done
excluding painting, wallpapering. • ; _ [ $ /SO, 000
muttfolyz 25% Barrier removal requirement .25
BUDGET FOR BARRIER REMOVAL (2i S 3 .50 0 •
The dollar amount of the BUDGET established on line (2) in the computation above shall be spent
providing the accessible elements in the following order
1- An accessible route connecting the building to accessible pedestrian
walkways, and the public way. - S
(Including but not Gaited to curb ramps. detectable warnings.
matted crossirtgs, ramps handrails and landings(. •
matted
2. Not less than one accessible parking space. S
(Itesuding but not gritted to adjacent access aisle. signs and curb ramp
caner: ng with the accessible route).
3. Accessible entry or entries. S
(inching but not United ted to ramps. handrails. landings. —
door sill height. door width and door hardwarej.
•
4. An accessible interior route to the altered area. S •
•
Cmcluaing Out not rented to door -ways. maneuvering
clearances, door hardware and stairways].
5. • At least one accessible restrcom for each sex S
6. At !east one accessible telephone where public phones
are provided. S
7. When drinking fountains are required, fifty per -cent but
•
not less than one shall be accessible. S
8. ' Additional accessible elements such as storage, reach ranges,
alarms, etc.. S
TOTAL; shall equal line 2 of Value Computation S •
Worc4.doct DST)
6/30/99 Activities for Case #: BUP97 -00427
4:41:53 PM •
Assigned Hold Updated .
Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes
BUPC005 Application received 9/8/97 DRA RECD TLP 11/13/97 Done as an OTC, but contractor
not determined yet. Ready to
issue once contractor named
and they are current in
_ database.
BUPC008 Permit created 9/8/97 DRA PASS DRA 9/8/97
BUPC010 Check for prd. restrict. 9/8/97 DRA PASS DRA 9/8/97 •
- BUPCO24 Plans Approved by CPE • 9/8/97 JHF PASS DRA 9/8/97
BUPCO26 Approved Plans routed to DSTs 9/8/97 JHF PASS DRA 9/8/97
BUPC740 Framing Insp 10/1/97 TLP PASS • J'H 10/1/97 Demising wall ok, sheetrock
wall, 1 -side okay.
BUPC760 Gyp Board Insp 10/1/97 TLP PASS J *H 10/1/97 1 side okay, (demising wall)
BUPC802 Final Inspection • 11/13/97 TLP PASS TLP 11/13/97
BUPC100 (F) Issue permit 9/30/97 . B PASS DST 9/30/97
BUPC760 Gyp Board Insp 10/21/97 10/17/97 TLP PASS J* 11 10/21/97
BUPC740 Framing Insp 10/21/97 10/17/97 TLP PASS J *H 10/21/97
BUPC960 Case Finaled 11/13/97 TLP PASS TLP 11/13/97 .
•
•
Page 1 of 1