Loading...
Specifications (2) -?-cap- /t4E )- / - STRUCTURAL CALCULATIONS HVAC CURB DETAIL 13553 SW PACIFIC HIGHWAY TIGARD, OR 4'wr'3 G E ,5 ccD ?Ropes i 4�54,573 •P �C" 4 C" 41114, v. AOR.. ONti REY D. 03-02-2017 EXPIRES: 06/30/2018 JRM I RED PROJECT: SW PACIFIC HIGHWAY PROJECT#:422-002 4 JOB ADDRESS: TIGARD,OR CLIENT: 6107 SW MURRAY BLVD. SUITE 147 BEAVETEL: (RTOSDN, OREGON 3} 746-8812 97208 DATE: 03/02/17 PAGE: 1 FAX (503) 639-9592 www:erneriodesign.corn • 14 I/116 ur4 Crie' 64 IC at t0, l elsYet)p F Bf-.)51, o iff2 5 - .61 ( 3)14 /,, ' (a 4y 1qs.9 It- . •, - .3(0 6't3)( ))( , 141 12 Cox( I p PF 14;4, P_/ `4// ) 3s; 4 � LNila WIC PROJECT: PROJECT#:1122.077_,JOB ADDRESS: CLIENT: 8285 SW NIMBUS AVE SUITE 180 BEAVERTON, OREGON 97008 PATE: PAGE; TEL: (503) 746-8812 FAX (503) 639-9592 www.emerlodesign.com HVAC SYSTEM P.T. 4x CURB3/8" LAG BOLT @ 3/8" LAG BDLT P.T. 4x CURB MIN. DEPTH= 5 1/2" EACH CORNER EACH CORNER MIN. DEPTH= 5 1/2" L50 @ 24" O.C. ,' ,10 ' L50 ® 24" O.C. FA II i 91 4X6 DF FLAT BLKG. TOP CHORD OF 4X6 DF FLAT BLKG. ROOF TRUSS C HVAC CURB DETAIL N.T.S. . u Air System Sizing Summary for M Dispensary Project Name: Untitled 02/07/2017 Prepared by:Blairco 11:26AM i x €,. 1 Air System Information Air System Name• M Dispensary Number of zones. 1 Air System Type. Single Zone CAV Floor Area. +,4*, .___2,6579'' Pgft Location. Portland ,Oregon' ' Sizing Calculation Information Calculation Months. Jan to Dec Calculation method. Transf ,Function.Methgde Central Cooling Coil Sizing Data Total coil load. 8.2 Tons Load occurs at Oct 1400 Total coil load. 98.4 MBH OA DB/WB. 87.4/62.8 F Sensible coil load- 97.6 MBH Entering DB/WB- 73.7/58.3 F Coil airflow- 3757 CFM Leaving DB/WB• 49.7/48.2 F Sensible heat ratio- 0.992 Coil ADP. 47.0 F Area per unit load- 299.7 soft/Ton Bypass Factor 0.100 Load per unit area. 40.0 BTU/(hr-sqft) Resulting RH. 39 % Design supply temp• 50.0 F Central Heating Coil Sizing Data Max coil load. 30.0 MBH Load occurs at- Des Htg Coil airflow- 3757 CFM Ent DB/Lvg DB. 66.9/74.3 F Load per unit area- 12.2 BTU/(hr-sqft) Supply Fan Sizing Data Actual max airflow. 3757 CFM Fan motor BHP. D.55 BHP Standard airflow- 3752 CFM Fan motor kW 0.41 kW Actual max airflow per unit area- 1.53 CFM/sqft Fan static. 0.50 in wg Outdoor Ventilation Air Data Design airflow- 75 CFM Airflow per person. 15.00 CFM/person Airflow per unit floor area. 0.03 CFM/sgft Space Sizing Data Space Name. Maximum Design Time of Peak Maximum Space Space Cooling Airflow Load Heating Floor CFM/sgft Sensible CFM Load MBH Area MBH sqft M Dispensary 89.2 3757 Oct 1400 28.3 2457.0 1.53 Block Load 4.15 Page 1 of 4 • ` System Design Load Summary for M Dispensary Project Name: Untitled 02/07/2017 Prepared by: Blairco 11:26AM DESIGN COOLING DESIGN HEATING Oct 1400 Design Heating Day OADB/WB87.4F/62.8-F OADB/WB22F/18.4F Zone Loads based on TFM Details Sensible Latent BTU/hr Details Sensible Latent BTU/hr • BTU/hr BTU/hr Window and Skylight Solar Loads 399 sqft 28215 - 399 sqft - - Wall Transmission 1303 sqft 381 - 1303 sqft 2399 - Roof Transmission 2457 sqft 2004 - 2457 sqft 2826 - Window Transmission 399 sqft 1825 - 399 sqft 7342 - Skylight Transmission 0 sqft 0 - 0 sqft 0 - Door Loads 14 sqft 48 - 14 sqft 193 - Floor Transmission 2457 sqft 0 - 2457 sqft 3508 - Partitions/Ceilings 468 sqft 789 - 468 sqft 936 - Overhead Lighting 2457 W 7528 - 0 W 0 - Electric Equipment 0 W 0 - 0 W 0 - People 5 944 1025 0 0 0 Infiltration - 2841 -240 - 8513 1 Miscellaneous - 0 0 - 0 0 Safety Factor 100%/10% 44575 79 10% 2572 0 >>Total Zone Loads 89150 864 28288 ; 1 Thermostat and Pulldown Adjustment - 5943 0 - -625 0 Plenum Wall Load 0% 0 - 0 0 - Plenum Roof Load 0% 0 - 0 0 - Plenum Lighting Load 0% 0 - 0 0 - Ventilation Load 75 CFM 1123 -103 75 CFM 3707 0 Supply Fan Load 3757 CFM 1393 - 3757 CFM -1393 - Total System Loads 97609 760 -: 29977 1 Central Cooling Coil - 97609 766 - 0 0 Central Heating Coil - 0 - - 29977 - Total Coil Loads 97609 766 29977 0 Key: Positive values are;elg loads Positive values are htg loads Negative values are htg loads Negative values are cig loads Block Load 4.15 Page 2 of 4 Zone Design Load Summary for M Dispensary Project Name:Untitled 02/07/2017 Prepared by: Blairco 11:26AM - M Dispensary DESIGN COOLING DESIGN HEATING Oct 1400 Design Heating Day OA DB/WB 87.4 F 1 62.8 F OA DB/WB22F/18.4F Thermostat Setpoint 72.0 F Thermostat Setpoint 68.0 F Zone Loads based on TFM Details Sensible Latent Details Sensible Latent BTU/hr BTU/hr BTU/hr BTU/hr Window and Skylight Solar Loads 399 sqft 28215 - 399 sqft - - Wall Transmission 1303 sqft 381 - 1303 sqft 2399 - Roof Transmission 2457 sqft 2004 - 2457 sqft 2826 - Window Transmission 399 sqft 1825 - 399 sqft 7342 - Skylight Transmission 0 sqft 0 - 0 sqft 0 _ _- _ Door Loads 14 sqft, 48 - 14 sqft 193 - Floor Transmission 2457 sqft 0 - 2457 sqft 3508 - Partitions/Ceilings 468 sqft 789 - 468 sqft 936 - Overhead Lighting 2457 W 7528 - 0 W 0 - Electric Equipment 0 W 0 - 0 W 0 - People 5 944 1025 0 0 0 Infiltration - 2841 -240 - 8513 1 Miscellaneous - 0 0 - 0 0 Safety Factor 100%/ 10% 44575 79 10% 2572 0 Total Zone Loads - 89150 ' 864 - 28288 1 Block Load 4.15 Page 3 of 4 System PsychrometricsforM Dispensary . Project Name: Untitled 02/07/2017 r Prepared by: Blairco 11:26AM . 1 • Location: Portland, Oregon Altitude: 39.0 ft Data for: Oct DESIGN COOLING DAY, 1400 0.020 — 1. Outdoor Air !/ /" 2. Mixed Air ! / /�� — 3 Central Cooling foil outlet i — 4. Supply Fan Outlet /j _ 0.018 — 5. Room Air '` ' /' ii %/ 0.016 — /' �' — / — / 0.014 _ w / / ' = -o m ,f - — 0 , 012 o 2 — , . c 0.010 —. _ a 0.008 — a� — _ o- 0.006 — 0.004 _ 0.002 I I 1 1 I I I 1 1 1 1 II I I I I I I I I I I I 1 1 1 I 0.000 30 40 50 60 70 80 90 100 Temperature (F) Block Load 4.15 Page 4 of 4