Report (68) Bend Office (541)330-9155
Carlson Testing, Inc. Geotechnical Office (503)601-8250
Eugene Office (541)345-0289
Salem Office (503)589-1252
Tigard Office (503)684-3460
Special Inspection
FINAL SUMMARY LETTER
Date: August 31, 2017
Job#: T1607848
City of Tigard
RECEIVEJ)
13125 SW Hall Blvd
Tigard, OR 97223-8199 SEP 05 2017
Attn: Building Division CITY OF TIGARD
Re: Project Name: Pacific Highway Retail Building UT IVISION
Address: X3553 SW Pacific Hwzr—Tigard, OR
Permit#: BUP2016-00242
Per Chapter 17, Section 1704.1.2 of the International Building Code(IBC), we have performed special inspection of the
following item(s)per our inspection reports only:
Reinforced Concrete
All requested inspections and tests were performed and reported according to the requirements of project documents and
to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change
orders and applicable workmanship, provisions of the State Building Code and Standards, as well as the structural
engineer's design changes, approvals and verbal instructions.
Our construction inspection and testing services were provided and intended to help reduce the risk of construction
defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or
guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or
omissions in the contractors work may exist. It is the contractor's responsibility to perform their work in accordance with
the approved construction documents.
CTI has provided its professional services with the degree of care and skill currently exercised under similar
circumstances by members of its profession in the same locale. Statements made in our reports are based on technical
judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material
tested/inspected only.
CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means,
methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to
health, safety or welfare.
Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are
further questions regarding this matter please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTINC.
Project Manager
NS/jng
cc: M &T Land Holdings LLC—Tim Young
City of Tigard Building Division—Walter'Chip' Barnett TVOUNG@SUMMAREAMA COM
EMAILED
P:1Projects\General\2016171607848108-31-17 Final letter.doc Updated 11/30/11