Loading...
Report (65) 3,ui'Zol& — cSozyZ _1 E I`�..� Civil Engineering Land Survey Land Use Planning Construction Management September 01, 2017 Tim Horst/Fast Line Oil Change LLC Attn: Tim Young P.O. Box 230764 Tigard, OR 97281 '+ RE: 13553 SW Pacific Hwvt Tigard,OR S Emerio Job Number:422-002 CITE'OF TIGARD City of Tigard Permit Number: 2016-0O242 BUILDING DIVISION' Mr. Young, This letter is intended to satisfy the required structural observation of this office. Geoffrey D. Wright, PE was on site at various stages of construction to observe the structural components of the building during construction. These site visits were made periodically to observe all aspects of the building's structural elements. Along with these observations and review of the Final Summary Letter from Carlson Testing, Inc., the structural observation requirements have been satisfied per this office. If there are any questions, please do not hesitate to contact this office. Respectfully, Emerio esign 45419 6 _4, ..,v, „,,,,t # ti. Geoffrey D. Wright, PE ter Ns" Project Engineer Tir Il *'r to = k 1,06 ‘texii ZYD,. `t 1('7 EXPIRES: STE. 100, 6445 S.W. Fallbrook Place • Beaverton, Oregon 97008 • 503-746-8812 I TEL • 503-639-9592 I FAX www.emeriodesign.corn