September 01, 2017
Tim Horst/Fast Line Oil Change LLC
Attn: Tim Young
P.O. Box 230764
Tigard, OR 97281 '+
RE: 13553 SW Pacific Hwvt Tigard,OR S
Emerio Job Number:422-002 CITE'OF TIGARD
City of Tigard Permit Number: 2016-0O242 BUILDING DIVISION'
Mr. Young,
This letter is intended to satisfy the required structural observation of this office.
Geoffrey D. Wright, PE was on site at various stages of construction to observe the structural
components of the building during construction. These site visits were made periodically to
observe all aspects of the building's structural elements. Along with these observations and
review of the Final Summary Letter from Carlson Testing, Inc., the structural observation
requirements have been satisfied per this office.
If there are any questions, please do not hesitate to contact this office.
Respectfully,
Emerio esign
45419
6 _4,
..,v,
„,,,,t # ti.
Geoffrey D. Wright, PE ter Ns"
Project Engineer