Permit (7) CITY OF TIGARD BUILDING PERMIT
COMMUNITY DEVELOPMENT Permit #: BUP2012 -00258
T [ G AR D 13125 SW Hall Blvd., Tigard OR 97223 503.718.2439 Date Issued: 12/18/2012
Parcel: 2S 101 AB90000
Jurisdiction: TIGARD
Site address: 12011 SW 70TH AVE
Project: CH Physical Therapy Subdivision: 2012 -009 PARTITION PLAT Lot: 1
Project Description: (1) sign manufacture non illuminated letter on silver backer panel TI
Contractor: MEYER SIGN CO OF OREGON Owner: RED ROCK CREEK CONDOMINIUM
15205 SW 74TH AVE OWNERS OF ALL UNITS
TIGARD, OR 97224 00000
PHONE: 503 - 620 -8200 PHONE:
FAX: 503 - 620 -7074
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: VB Permit Fee - Additions, Alterations, 12/18/2012 $134.54
Demolition
Occupancy Grp: B Occupancy Load: 12% State Surcharge - Building 12/18/2012 $16.14
Dwelling Units: 0 Plan Review 12/18/2012 $87.45
Stories: 0 Height: 0 ft Info Process /Archiving - Sm $0.50 (up to 12/18/2012 $1.00
Bedrooms: 0 Bathrooms: 0 11x17)
Value: $3,300
Floor Areas:
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $239.13
Required: Required Items and Reports (Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952- 001 -0010 through OAR 952- 001 -0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
•
Issued By: / / Permittee Signature: " 4 ^
Call 503.639.4175 by 7:00 a.m. for the next available Inspection date.
This permit card shall be kept In a conspicuous place on the job site until completion of the project.
Approved plans are required on the Job site at the time of each Inspection.
Building Permit Application
Commercial RECEIVED MR Ill I It I I "I (1\ 1 1
I I City of Tigard 1 Received f Permit Na.: fd aD - pi)15y
• 13125 SW Hall 1 Blvd., Tigard, OR 97223 DEC 3 2012 eR h ( ./i 311 Plan 3 Phone: 503- 718 -2439 Fax: 503 - 598 -1960 p ate/gy . ' (t'J�s Other Permit P�i ��ai '>
I c -� K [ Inspection Line: 503 -639 -4175 CITY OF TIGARD Ready y /$ ! / i JUJU ! 63 See Page 2 for
Internet: www.tigard or.gov Not ed/Method. /y � 1 (p Supplemental Information
BUILDING DIVISION �,�y� (.,
TYPE OF WORK REQUIRED DATA: 1- AND 2- FAMILY DWELLING
❑ New construction 0 Demolition Permit fees* are based on the value of the work performed.
Indicate the value (romded to the nearest dollar) of all
TZI Addition/alteration/replacement ❑ Other: equipment, materials, labor, overhead, and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
❑ 1- and 2- family dwelling Comercial /industrial
Valuation: $
m
❑ Accessory building ❑ Multi- family Number of bedrooms:
❑ Master builder ❑ Other: Number of bathrooms:
JOB SITE INFORMATION AND LOCATION Total number of floors:
Job site address: (zo 1 1 SW '+o AVE New dwelling area: square feet
City /State /ZIP: T1 q #1,42,0 i Q 0_ Garage /carport area: square feet
Suite/bldg. /apt. no.: I Project name: C.14 , ?His 1CAL T 4 Q.i y Covered porch area square feet
Cross street/directions to job site: Deck area: square feet
Other structure area: square feet
REQUIRED DATA: COMMERCIAL-USE CHECKLIST
I Subdivision: I Lot no.: Permit fees* are based on the value of the work performed.
Tax map /parcel no.: Indicate the value (romded to the nearest dollar) of all
equipment, materials, labor, overhead, and the profit for the
.k DESCRIPTION OF WORK work indicated on this application.
M A►Jt F- /�[.rt�� 1Jo J 1 cwt t v�>- D Le- Till -- Valuation: $ 3, 3 oo ot7
'`� . OIJ S t la/62 6 tL� P IOJ e L Existing building area square feet
� New building area: square feet
❑ PROPERTY OWNER I 0 TENANT Number of stories:
Name: C o1_ t *I I LEI_ Type of construction: 51 bill
Address: (Zol t SW 40 Att/i= Occupancy groups:
City /State /ZIP: 1 t 4 A.4O , Da_ Existing:
Phone: (S 03) l g. — s,,.4 Fax: ( ) New:
❑ APPLICANT 0 CONTACT PERSON BUILDING PERMIT FEES*
(Please refer rope suhe als)
B usiness name: M - L Stl CO OF O - , Structural plan review fee (or deposit):
Contact name: (203 I4A,12T7,A.LI-.
FLS plan review fee (if applicable):
Address: I S2.S SW }y nt Q„
4.
C ity /State /ZIP: { Um 04,20 1 0 tZ "(1-22_4 Total fees due upon application:
Phone: (�3) (2 1..0 - "2...-0 I Fax: : ( ) ( - 3p .: } Amount received:
E -mail I 1L! E PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
p �6� �{4[� -S t b 1 C O • C..,wt
CONTRACTOR Commercial and residential prescriptive installation of
roof -top mounted PhotoVoltaic Solar Panel System.
Business name: �� Submit two (2) sets of roof plan with connection details
rk s4 t r 6 3o and fire department access, along with the 2010 Oregon
Address: �" Solar Installation Specialty Code checklist.
City/State /ZIP: Permit fee (includes pion review $180.00
and administrative fees):
rt Phone: ( ) Fax: ( ) State surcharge (12% of permit fee): $21.60
CCB lic.: w 1-1 of 4
Total fee due upon appication: $201.60
Authorized signature: + G.-. L; 4,r(---2- This permit application expires if a permit is not obtained
within 180 days after it has been accepted as complete.
Print name: R.sD(3 lu At2- -1 Z,A LL Date: 1 Z,13 11 '2 - * Fee methodology set by Tri -County Building Industry
Service Board.
I: 1Building \Permits\BUP_COM_PermitApp.doc Rev. 12/ 11/2012 440- 4613T(11 /02/COM/WEB)
v.
•
1111111 Building Division
Accessibility: Barrier Removal Improvement Plan
TIGARD
REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241.
(1) Every project for renovation, alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains are readily accessible to individuals with disabilities unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five per -cent (25 %).
VALUATION: Total of all renovation, alteration or modification being done,
excluding painting and wallpapering: [1] $
MULTIPLIER (25% barrier removal requirement): x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $
ELEMENTS: In choosing which accessible elements to provide under this section, priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order:
(a) Parking $
(b) An accessible entrance: $
(c) An accessible route to the altered area: $
(d) At least one accessible restroom for each sex or a single unisex
restroom: $
(e) Accessible telephones: $
(f) Accessible drinking fountains: and, $
(g When possible, additional accessible elements such as storage and
alarms: $
TOTAL (shall equal line [2] of Valuation Computation): $
1: \ Building \Permits \BUP_COM_PermitApp.doc Rev. 12/11/2012
!PI
Building Division
Plan Submittal Requirements
T I G A R D Commercial & Multi- Family - New, Additions or Alterations
1. SITE PLAN (fully dimensional, drawn to scale) labeled with:
A. ❑ map & tax lot # ❑ project name ❑ site address ❑ suite number
❑ zoning ❑ applicant name ❑ phone number
B. North arrow.
C. Scale (architectural or engineering only).
D. Street names.
E. Setbacks.
F. Parking, including disabled access.
G. Finished floor elevations.
2. EROSION CONTROL PLANS AND DETAILS.
3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of
plans required based on submittal type (no redlines or tape -ons accepted).
All details listed below shall be incorporated into the plans:
A. Scale (architectural or engineering only).
B. Foundation plan.
C. Floor plan(s).
D. Cross sections.
E. Reflective ceiling plan.
F. Seismic bracing detail for suspended ceiling.
G. Roof plan.
H. Exterior elevations.
I. Structural calculations, plans, details and specifications.
J. Accessibility barrier removal worksheet.
K. Deposit - based on valuation of project.
4. EXTRA SET OF THE FOLLOWING:
A. Two (2) copies of site plan to include vicinity map.
B. One (1) copy of erosion control plan with details.
C. Fire Department Building Survey, and full set of architecture drawings.
I:\ Building \Permits \BUP_COM_PermitApp.doc Rev. 12/11/2012
•
•
a Building Division
Plan Submittal Requirement Matrix
T t G A R D Commercial & Multi- Family - New, Additions or Alterations
•
Type of Submittal # of Plans .
(Includes new, additions and alterations.) • Required at
Submittal '
Demolition Permit 3
(site plan required showing location and square
footage of all buildings to be demolished)
Site Work 3
(must include location of all accessible parking)
Plumbing (site utilities) 2
Building 3
•
Fire Protection System 3
Mechanical 2
Plumbing (building fixtures) 2
Electrical 2
•
Plan review is dependent upon submittal of a completed application and plans.
After plan review approval, the Plans Examiner will contact the applicant to request
additional sets of plans for distribution purposes (for contractor, City of Tigard, Washington
County, and Tualatin Valley Fire & Rescue), if applicable.
I: Building \Permits \BUP_COM_PermitApp.doc Rev. 12/11/2012