Loading...
Permit (96) CITY OF TIGARD SITE WORK PERMIT Fri a COMMUNITY DEVELOPMENT Permit#: SIT2018-00005 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 05/17/2018 T f '� t°f g Parcel: 1 S 136 DA02400 Jurisdiction: Tigard Site address: 11123 SW 68TH PKWY Project: RPC Tigard Storage Subdivision: WAY LEE Lot: 1 Project Description: Site work for new 122,076 sq.ft.3-story with basement temperature controlled self storage building. Contractor: PERLO CONSTRUCTION LLC Owner: RPC TIGARD 68 LLC 16101 SW 72ND AVE SUITE 200 2101 CEDAR SPRINGS RD STE 1600 TIGARD, OR 97224 DALLAS, TX 75201 PHONE: 503-624-2090 PHONE: FAX: 503-639-4134 FEES Description Date Amount Specifics: Permit Fee-Site Work 04/13/2018 $1,083.31 Plan Review 03/28/2018 $704.15 Type of Use: COM 12%State Surcharge-Building 05/17/2018 $130.00 Class of Work: NEW Info Process/Archiving-Lg$2.00(over 05/17/2018 $44.00 11x17) Project Valuation: $161,000.00 Info Process/Archiving-Sm$0.50(up to 05/17/2018 $155.50 11x17) Erosion Control w/Development 05/17/2018 $236.40 Site Specifics: Excavation Volume: 7572 cu.yd. Fill Volume: 1135 cu.yd. Impervious Surface: 54816 sq.ft. Engineered Fill: Yes Soil Report Required: Yes Paving: Yes Grading: Yes Landscaping: Yes Site Prep: Yes Storn Drains: Retaining Wall: Yes Fire Underground: Yes Accessible Parking: Yes Fence: Yes Total $2,353.36 Required Items and Reports(Conditions) 1 Ersn Cntrl 503-639-4175 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1. n113..22344. Issued By: Permittee Signature: 1%i414 Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application rt,1 , , Site Work FOR 01.1,111 1 Si,:0\1.1 City of Tigard M i\: 2 y I t Received � O // „r ermit N�� ' fi ^� � PlanDateReview/view/— ter. // O t'% III • 13125 SW Hall Blvd.,Tigard,OR 97223 , Plan Revie�✓ f S Phone: 503.718.2439 Fax: 503 598.19(f0 -`Date/By: Other Pe I t". T[G A R D Inspection Line: 503.639.4175 Date Ready/Dy: Juris ®See Page 2 for Internet: www.tigard-or.gov -'-'ftotified/Methodi-`7 iir At v Supplemental Information t719 iG A/2j-ni4OA/ TYPEOF WORK OR REQUIRED DATA:1 AND 2-FAMILY DWELLING liNew construction `Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ❑Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. o I-and 2-family dwelling lirCommercial/industrial Valuation: S ❑Accessory building 0 Multi-family Number of bedrooms: ❑Master builder 0 Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 11123 SW 68th Parkway New dwelling area: square feet City/State/ZIP: Tigard, Oregon 97223 '/ Garage/carport area: square feet Suite/bldg./apt.no.: Project name: RPC Tigard Storage ✓ Covered porch area: square feet Cross street/directions to job site: 500 feet south of intersection of Highway 99 Deck area: square feet and SW 68th Parkway Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot no.: Permit fees*are based on the value of the work performed. 5;:.• Tax map/parcel no.: Tax Lot 2400,Tax Map 1S 13 6DA Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. ,i Construction Construction of a 4 story-+/-125,000 sf self storage building with site Valuation: S 161,000 improvements, parking lot, utilities, and landscaping. Existing building area: 0 square feet New building area: +/-125,000square feet t ' *PROPERTY OWNER 0 TENANT Number of stories: 4 , w;* Name: RPC Tigard 68 LLC (A Delaware LLC) Type of construction:E&S, Site work, Paving ,,,I Address: 2101 Cedar Springs Road, Suite 1600 Occupancy groups: City/State/ZIP: Dallas TX 75201 Existing: Phone:(214)849-9099 Fax:( ) New: $APPLICANT 0 CONTACT PERSON NOTICE 16 Business name:RPC Tigard 68 LLC (A Delaware LLC) All contractors and subcontractors are required to be erlicensed with the Oregon Construction Contractors Board Contact name: Brandon Cooke under ORS 701 and may be required to be licensed in the Address:2101 Cedar Springs Road, Suite 1600 jurisdiction in which work is being performed.If the City/State/ZIP:ii Dallas TX 75201 applicant is exempt from licensing,the following reasons apply: Phone:(214)849-9099 Fax::( ) E-mail:bcooke@rosewd.com CONTRACTOR Business name-Colorado C /` "72[. ' ccAlS7-72.4("ye BUILDING PERMIT FEES* Address: , SDitc 210 /G,/('-/ SA: 7 « /9-z(.5.- tiJ T ''D(Please refer tofee schedule) City/State/ZIP: 20 /"(."/2:7Z.fivv, e,e C�-d.,1_/. Structural plan review fee(or deposit): 6d y,S` -:( �'9 26 7nee cF^ FLS plan review fee(if applicable): Phone:( 4. ;zy CCB lic.:�$D /��" %5 ////mac Total fees due upon application: Amount received: Authorized signature:„L a e /� � This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name: /j le .�e` 4 Date f_ '- * Fee methodology set by Tri-County Building Industry (/70 Service Board. I:\Building\Permits\SIT-PermitApp.doc 08/02/2016 440-4613T(11/02/COM/WEB) City of Tigard: Site Work Permit Checklist Page 2-Supplemental Information Commercial,Multi-Family and One-and Two-Family Dwellings: No permit is required if fill is less than 50 yards(5 dump truck loads),or less than 3 feet deep and will not be supporting a structure. If a building will be constructed on the fill,it must be engineered fill. If fill is in a flood plain,drainage way,or wetland,the applicant must apply for a sensitive lands review (SLR). Please complete all items below, unless otherwise noted. Excavation Volume: 7,572 cu.yds. Grading Volume: (Soils report required for>5,000 cu.yds.) 8,707 cu.yds. Fill Volume: (Fill exceeding 12"in depth shall be compacted to 90%of maximum density) 1,135 cu.yds. Retaining structure? (Check one) ❑ Rock ❑ CMU ❑ Concrete ❑ Other: *Total new impervious area including all buildings, sidewalks,and paving: 54,816 sq.ft. Site Utilities Plumbing Work: Complete the Plumbing Permit Application for site utilities plumbing work. Plans Required: See"Site Work Permit Application-Plan Submittal Requirements"attached. lafollowing must accompany this application: Site Plan with Vicinity Map showing ADA ' *Parking(including ADA)and Lighting compliance Plan Grading Plan and details *Landscaping Plan Erosion Control Plan and details Soils Report(if required) ❑ Retaining Structures *Does not apply to One-and Two-family dwellings. Plan Submittal: Permit Fee: TYPE OF SUBMITTAL #of Plans Valuation:• Permit Fee: (New,Additions or Required at $.00 to$500.00 $51.09 minimum permit fee Alterations) Submittal $500.01 to$2,000.00 $51.09 for the first$500.00 and Commercial 3 $2.69 for each additional$100 or fraction thereof,to and including$2,000.00. $2,000.01 to$25,000.00 $91.44 for the first$2,000.00 and Multi-Family R-1 Occupancy 3 $10.76 for each additional$1,000 or fraction thereof,to and including One-&Two-FamilDwelli3 $25,000.00. y n g $25,000.01 to$50,000.00 $338.92 for the first$25,000.00 and $8.06 for each additional$1,000.00 or fraction thereof,to and including $50,000.00. $50,001.00 to$100,000.00 $540.42 for the first$50,000.00 and $5.38 for each additional$1,000.00 or fraction thereof,to and including $100,000.00. $100,000.01 and over $809.42 for the first$100,000.00 and $4.49 for each additional$1,000.00 or fraction thereof 1:\Building\Permits\SIT-Perm itApp.doe 08/02/2016 2 IIIp Site Work Permit Application Plan Submittal Requirements TIGARD Commercial, Multi-Family and One- &Two-Family Dwellings A site work permit is required for all commercial projects including new buildings,additions, accessory buildings larger than 120 square feet,modular structures and multi-family R-1 occupancies. A site work permit is required for excavation, fill,grading,paving,retaining walls, fire hydrants and fire department access on private property for work on individual lots not covered under the subdivision development. Note: A separate "plumbing" permit for site utility plumbing work is required for sanitary sewer, storm sewer and potable water systems on private property. Please see the Site Utilities -Plumbing Permit Application for plan submittal requirements. 1. SITE PLAN and vicinity map (fully dimensional, drawn to scale) showing the geographic location labeled with: A. g map& tax lot# Q project name (7 site address ❑ suite number 0 zoning g applicant name [J7 applicant phone number B. North arrow. C. Scale (architectural or engineering only). D. Street names. E. Building pads (drawn to scale) with project location. 2. BUILDING PLAN submittal requirement: Three (3) complete sets, Civil only. All details listed below shall be incorporated into the plans: A. Site plan showing: 1) Required parking spaces and driveways. 2) A route,accessible to persons with disability,leading from the public way to an accessible building entrance. 3) Accessible parking spaces and adjacent access aisle connecting with the accessible route. 4) Curb ramps along the accessible route, curb, sidewalk and gutter. 5) Finish grade elevations along the accessible route. B. Topographic survey plan showing grade elevations crossing the entire site. C. Overall grading plan. D. Utilities plan showing: 1) Fire hydrant location and pipe size if on private property. 2) If the building is to be protected with an automatic fire sprinkler system,show location of the water service vault and the fire department connection (FDC) within 70 feet of a fire hydrant. 3) Size of underground water service for the sprinkler system. E. Erosion control plan complying with the requirements of the Clean Water Services (CWS) agency showing: 1) Silt fence locations. 2) Bio-filter bags/other approved barrier material surrounding catch basins. 1:\Building\Permits\SIT-PermitApp.doc 08/02/2016 3 r 3) Illustrations detailing the correct installation of the silt fencing and catch basin protection. 4) Any other measures to ensure compliance with CWS standards. F. Landscaping plan. 3. ADDITIONAL REQUIREMENTS: A. Soils (geotechnical) report. A soils report is required for new buildings and additions to contain the following: 1) The report shall address the potential of soil liquefaction and instability (OSSC Sec. 1804.2). 2) Fills to be used to support foundation of buildings (OSSC Sec. 3301.1). 3) Foundation and lateral pressures exceeding 1,500 lb./sq. ft. (OSSC Sec. 1805). B. Fire flow and hydrant worksheet. C. Plan review deposit based upon project valuation. • l:\Building\Permits\SIT-PennitApp.doe 08/02/2016 4 `S 41.IM „,4PYCI F'` Submittal MAR 28 2018 Transmittal c t i l MAL; AKS Engineering & Forestry 12965 SW Herman Rd. tie -u#{,itis,4p p62 FROM: John Christiansen AKS Engineering & Forestry TO: n/a 12965 SW Herman Rd. City of Tigard Suite 100 13125 SW Hall Blvd Tualatin, OR 97062 Tigard, OR 97223 johnc@aks-eng.com 503-639-4171 503-563-6151 PROJECT: 68th Parkway Storage DATE SENT: 3/28/2018 5077 SUBJECT: Site Development Permit Materials ID: 00050 PURPOSE: For Signature `v`iA: Delivered by AKS Engineering CONTENTS QTY: DATED DESCRIPTION: ACTION: 1 3/27/2018 Soil Report QTY: DATED DESCRIPTION: ACTION: 3 3/27/2018 Construction Plans 22x34 QTY: DATED DESCRIPTION: ACTION: 1 3/27/2018 Building Site Permit Application QTY: DATED DESCRIPTION: ACTION: 1 3/27/2018 Check#29011 for Fee in the Amount of $1083.31 Page 1 of 1 City of Tigard a COMMUNITY DEVELOPMENT DEPARTMENT ■ T I G A R D Building Permit Review — Commercial - With Land Use Building Permit #: . /7 /cP -Qeee,,5 Site Address: 111/3 SW 68t 94t.L,,a Suite/Bldg#: �� Project Name: �� ,+4 1 *- ��r,�, r�r� (Name of commercial business occupying the space. If vacant,enter Spec,pace.) Planning Review I Proposal: 1(/c r S,'4 l •CN -1/- I 2S,060' S pirk;ty ldij wfiin� AI (45.11,0•16 . /Verify site address/suite# exists and active in permit syste . lir 'ver Terrace Neighborhood: ni,❑ Yes MNo IBJ and Use Case#: 00 (U1°10(6-00002- kUeZ613 -002 L+1 Pla�natch Approved Land Use: LV Site Plan Li' Landscape Plan ❑ Other: ❑ Urban Forestry Plan ❑ Elevation Plan 0-Building Height: Maximum Height is Actual Height L�'Conditions Met: CI Prior to Submittal DV rior to Permit Issuance IJ Business License: xists: ❑ Yes �No,applicant notified to obtain business license [iJ Public Facilitie m rovement F p (P I) Permtt: Required: V Yes,applicantr[ was notified ❑ No Applied For: [ Yes ❑ No, stop intake Notes: Siff. pan ;••• 146e,,�1,J 141{111 a Ji'( U,nhyi2nvy PIGA" ( 100) Approved by Planning: i C47(1) - Date: 3- t,K-(d Revisions (after Building Submittal only) Reviewer Date Revision 1: El Approved El Not Approved Revision 2: El Approved ❑ Not Approved Revision 3: ❑ Approved Cl Not Approved Building Permit Submittal Original Submittal Date: 3/2:1;er Site Plans: # Building Plans: # 3 Building Permit#: 'Enter building permit#above. Workflow Routing: ®-Planning S''Engineering .Q-Permit Coordinator `17-Building Workflow Sign-off: 0-Sign-off for Planning(include notes from planning review) Route Application Documents: Q--Building: original permit application, site plans,building plans, engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: cc//,, )- ,' , ,' t,"- _. Date: -V2trAf-- I:\Building\Forms\B1dgPermitRvw COM WithLandUse 060116.docx En ineering Review 6 Spe building pad: 13, S/o PFI Permit#ldi: 1.2017_6003. 0�0 t 7_d CC3 g ❑ Conditions "Met"prior to issuance of building permit CcWOtli'NS uN,4 1 ❑ asements (encroachments) per engineering conditions of approval and plat (not typical on SDR/CUP)EJ'CSA«T Water Quality/Quantity Facility: N'r 96Ce1ZOE0 Assess Water Quality Fee in-lieu: ❑ Yes ❑ No Assess Water Quantity Fee in-lieu: ❑ es ❑ No LIDA Facility on lot: Yes U No NOT Approved by Engineering: Aar %/" Date Ll/.2//s Notes: FV( 2Eaulrt6O ' 6/ SE1(6NT 2E4w10ED Areoss SOGerIt Sloe of PP 121`/ cote QtKE/PEQ ! 'EQOel) 4SASE.r(ccur Ptioe 7b L.g o Approved by Engineering: d/ �V Date: .54//g• Revisions (after IV Submittal only) j eviewer a Revision 1: I Approved ❑ Not Approved 7 -‹ *logo g Revision 2: ❑ Approved ❑ Not Approved pP pp Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review ❑ Conditions "Met"prior to issuance of buildingpermit ?KR) proved,NOT Released: Ze,..„41,%"-L, 9iN+a-+'C • Date: A//c// `, Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes N/A Tigard Trans SDC: ❑ Yes N/A Parks SDC: ❑ Yes N/A OK to Issue Permit Approved by Permit Coordinator: Date: -.-7/4/1(r I:\Building\Fonns\B1dgPermitRvw_COM_W ithLandUse_070915.docx