Loading...
Permit (97) CITY OF TIGARD BUILDING PERMIT P ,�-'.F I' ' COMMUNITY DEVELOPMENT Permit#: BUP2017-00268 RD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 06/13/2018 Tt� �� g Parcel: 1S136DA02400 Jurisdiction: Tigard Site address: 11123 SW 68TH PKWY Project: RPC Tigard Storage Subdivision: WAY LEE Lot: 1 Project Description: A new 122,076 sq.ft.3-story with basement temperature controlled self storage building. Contractor: PERLO CONSTRUCTION LLC Owner: RPC TIGARD 68 LLC 16101 SW 72ND AVE SUITE 200 2101 CEDAR SPRINGS RD STE 1600 TIGARD, OR 97224 DALLAS, TX 75201 PHONE: 503-624-2090 PHONE: FAX: 503-639-4134 Specifics: FEES Description Date Amount Type of Use: COM Class of Work: NEW Type of Const: IIB Permit Fee-COM-New Construction 06/13/2018 $13,489.18 Occupancy Grp: S-1 Occupancy Load: 102 12%State Surcharge-Building 06/13/2018 $1,618.70 Plan Review 10/04/2017 $8,767.97 Dwelling Units: 0 Plan Review-Fire Life Safety 04/13/2018 $5,395.67 Stories: 3 Height: 45 ft Wash Co Trans Dev Tax 06/13/2018 $268,201.00 Bedrooms: 0 Bathrooms: 0 Parks SDC Improvement 06/13/2018 $2,568.00 Value: $2,924,000 Parks SDC Reimbursement 06/13/2018 $464.00 Info Process/Archiving-Lg$2.00(over 06/13/2018 $70.00 11x17) Floor Areas: Info Process/Archiving-Sm$0.50(up to 06/13/2018 $50.00 Total Area: 30519 11x17) Tig-Tual School CET-Non Residential 06/13/2018 $19,226.97 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $319,851.49 Required: Required Items and Reports(Conditions) Fire Sprinkler: Yes Parapet: No Fire Alarm: Yes Protected Corridors: No Smoke Detectors: Yes Manual Pull Stations: Yes Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is srr:pended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification enter. Th• e r L s are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a co. direct questions to OUNC by calling 503.2 1987 1.80.332.. 44. Issued By: .---,, _ Permittee Signature: j -, ,.-..10.- Call 51 .639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. City of Tigard " COMMUNITY DEVELOPMENT DEPARTMENT 111111S T 1 c A lz o Building Permit Review — Commercial - With Land U s e ,w, Amisimm Building Permit #: 81,6 j 7 r Site Address: in 23 Sw (0 8 il^ Pc4 r tl wmay Suite/Bldg#: Project Name: _ - . -0 - dMNIN,APIF (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review �r Proposal: ?/W S to r49t .i) ► 4/ N ;,e .. Verify site address/suite# exists and active in permit system. 7 River Terrace Neighborhood: ❑ Yes 0 No - and Use Case#: .LCiVe'aClllo- b0.002- Zi Plans Match Approved Land Use: gl Site Plan g Landscape Plan ❑ Other: ❑ Urban Forestry Plan ,E Elevation Plan 0 Building Height: Maximum Height 4s Actual Height 4s Conditions Met: ❑ Prior to Submittal A Prior to Permit Issuance XBusiness License: oda �n s V S n � Exists: El Yes /Er No,applicant notified to obtain business license Public Facilities Improvement(PFI) Permit: pc--r-2,0 t-1 - 0003 6 Required: El Yes,applicant was notified El No Applied For: F Yes El No,stop intake Notes: Approved by Planning: to Date: /13 / 1 , Revisions (after Building Submittal only) Reviewer Date Revision 1: Approved ❑ Not Approved ;` rct 17\^= 3/ I h ' 1 Revision 2: Approved El Not Approved .p .t 2,l 8 C Revision 3: El Approved El Not ApprovedAN J Building Permit Submittal Original Submittal Date: 10/�/a 7 Site Plans: # �5/ Building Plans: -# Building Permit#: building permit#above. Workflow Routing: L7 Planning B'gineeringermitCoordinatording Workflow Sign-off: off for Planning(include notes from planning review) Route Application Documents: *"Building: original permit application, site plans,building plans, engineer and beam calculations and trust details,if applicable, etc. Notes: By Permit Technician: / ------ Date: /WVr 7 I:\Building\Forms\BldgPermitRvw COM_WithLandUse 060116.docx Engineering Review ❑ Slope at building pad: ,Vor 6-1/0,31,- 0 ,31 - ❑ PFI Permit#: PF 120 17" 000 3g ❑ Conditions "Met"prior to issuance of building permit eurscl;4(.►.,s owts4., 5/;/f; f 1 N(� ❑ Easements (encroachments)per engineering conditions of approval and plat(not typical on SDR/CUP) ❑ Water Quality/Quantity Facility:Skov efA L P Assess Water Quality Fee in-lieu: ❑ Yes ❑ No Assess Water Quantity Fee in-lieu: ❑ Yes ❑ No LIDA Facility on lot: ❑ Yes❑ No {,NOT Approved by Engineering:��i Date /0(.4 7 Notes: SIpo.. Plo 4- %. - (-rc % t*;S4,w 0a401.- G.•wli•if 1c;b4., II;kt/1,41 -e4sei.t Approved by Engineering: Date: Revisions (after B ilding Submittal only) eviewer /Daate Revision 1: Approved ❑ Not Approved g`S! ir Revision 2: Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit c / - Approved, G!/v`NOT Released: ft - 1+^ti .e.„,,,G Q o ( Date: 1(9/I Notes: Revi ' (after Building Submittal only) / evision Notice 1: Date Sent to Applicant: /t1//0li (-1,44-"142-4-e----- /lei- eswa .vItevision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: ❑ SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes ❑ N/A Tigard Trans SDC: ❑ Yes ❑ N/A Parks SDC: ❑ Yes ❑ N/A SYl�/ / r="•K to Issue Permit ►� Approved by Permit Coordinato t 4. ' , / i i %�� I ate: I:\Building\Forms\B1dgPernutRvw_COM_WithL.andUse_070915.docx