PARCEL: 1513 SAB-0340121
r--p] T! 1W.60 SW GREE:NDURG RD #5. 820
5LIBI .(UN. . . . : 'TUWN OF MET LGER L ON I NG:C-.P
BLOLK,. . . . . . . . . . a LOT. . . . . . . . . . . . . . 14
C LA96 OF WORK. s ALT
TYPE: OF USE:. . . a COM
C.CCUPONCY ORP. s B2
1 OCCUPANCY LOAD: 314 �
1"rP1-iNT NAME'. , „ :FIRST FRANKLIN
i�ielsarkasr First Ft-ATlklin— minor tenant imK)rUvemellt for r.sdditiOnal space
IvILLViN MARL', BROKEWRAGE.
W20 SW GREENDIJ14 3 ROAD
r 1 aARI1 OR 9,7223
Phow? #-.
MELV I N MARL; CONSTRUET Y ON
10220 5W GREE<NOUP6 RI)
SUITE: 01.50
T I OF iRD OR 9722:1
Phony? #s 452--15900
Rey H. . : 64721
Occl..INancy of the above referenced building tF hereby givers, and r:er••tifies
the `c mRliance with the State Of OreFlon Specialty Codes for the gr'p'ap,
occ,.sFa nc'y, aanti Ce racier which the referenced permit waec iastlsd.
FIRE �f)EPAR'TMEFNT E ' ING "[ / ECTOR
E3lJIC..E)ING l�F' rIC:IAL IS
of Ss"I IN CONSPICUOUS V"L.AC'E , f
1
I �
1
1
1
+
�1y
1
i
I
I
I
i I
I
�aspscrlon c+�c>r
City of Tigard Building Departient 0
13125 SW Hall Blvd. Tigard, Oregon 97223
Inspection Line (Rec-0-Phones 639-4175 Buslnees Phono: 639-4171
Inepections�--- ---- ----- _—._ __.
tooting Plbg. Underalah Meeh. Rough-in Appr/&Wlk
Found.. Plbq. Top Out Gas Line FINALS
Post/Beam Struct. San. Sewer Framing -Bldg.
Post/Beam nnCh. Rain Drain _nsulation •-Nlumb.
Plbq. Unaerfloor. Natmrr Line Gyp, Bd. -Koch.
Dat• Requesteds f'`pp •�' �! 5 $ Zy Tlmei (� � �}AK PK
Addruse s_tDZ(��(`y E C Y � i -1[gut LF�Permit
Builders (v"�� (�/`,` 1, Y `� 1 �i I Y-I C(1 q
THE FOLLGIMIG COP.RECTIONS ARE REQUIREDj
i
i
Inspectors , ,{�— - -- Date:_ 3
„ APP1�VEp — DISAPPROVED APPROVED SUBJECT To ABOVE
call. For Reinsp.
t i
i
:
I.
h^10
I n
TUALATIN VALLEY FIRE & RESCUE
AND
BEAVERTON FIRF. DEPARTMENT
4755 S.W. Griffith Drive• P.Q. Box 4755 • Beaverton, OR 97076• (503) 526-1469• FAX 526-2538
i
F
i
November 1.2 , 1993
•
Robert Becker.
9660 S.W. Eagle Ct. r
Beaverton, Oregon 97005
Re: First Franklin
10260 S.W. Greenburg Rd. , Suite 820 k
5989A-292-043
Dear Mr. Becker:
This is a Fire and Life Safety Plan Review and .is based on
the 1991. editions of the Uniform Fire Code (UFC) and those
sections of the Uniform Building Code (UBC) and Uniform
Mechanical. Code (UMC) specifically referencing the fire
department, and other local ordinances and regulations.
Plans are conditionally approved subject to Tigard Building �
Department requirements and the following items:
K
1. The tenant space number must be prominently displayed
on the street front where it is readily visible to
drivers and officers of responding fire apparatus and
other emergency vehicles. UFC Sec. 10. 208
2 . Not less than one (1) approved fire extinguisher(s)
with a rating of not ' mss than (*) shall be provided
for each (**) square foot of floor area or fraction
thereof. The travel distance to an extinguisher from
any portion of the building, shall not exceed 75 feet.
JFC Sec. 10. 303 i
(*) 2AlOB:C - Light and Ordinary Hazard
4A10B:C - Extra Hazard
t '
(**) 3 , 000 - Light Hazard
1 . 500 - Ordinary Hazard
1, 000 - Extri Hazard
"Working"Smoke Detectors Save lives
M'
•
r
•
a Robert Becker
November 12 , 1993
Page 2
Note: Where flammable or combustible liquids are
used, "B" ratings of extinguishers may need r.o be
higher and travel distances shorter. See requirements
in National Fire Protection Association Standard 10-1.
3 . Plans referred to and examined by this office contain
no provisions for the alteration or installation of
automatic sprinkler system. Not .less than three sets
1 of plans for the installation shall be submitted to
this office for approval prior to installation. UBC
302 (b)
Approval of submitted plans .is not an approval of omissions { ;
or oversights by this office or of non-compliance with any
applicable regulations of local government.
If I can be of any further assistance to you, please feel
free to contact me at 526-246
" Sincerely,
4
Gene Bir.chil , DFM
Plans Examiner
GB:kw
cc: City of Tigard Building Departmenti"
k'
V1
1N vq�t TUALATIN VALLEY FIRE & RESCUE
AND
BEAVERTON FIRE DEPARTMENT' _
FIRE MARSHALS OFFICE _-
F&RE$�'J� --+" -- (503) 526-2469 POSTED:
f
OCCUPANT I Y j �KI
D
CONTRACTOR """' t'1''� 1 r✓a�` " !//)'L-�`� I� 1 Ga-•-� �`v�` BLDG, PERI•lIT !kj- ,-V � {
PROJECT NAME `\ h�� �► J ����t/�:1� -' PLAN REVIEW 0
LOCATION
r f �
JURISDICTION: 1= Be. 2= Du. 3= I:.C. := 5= Tu. 6= Sh. 7= '.4i i. 8= CC 9�= WC 0= MC
COVER FINAL SPECIAL FOLLOW-UP/REINSPECTION ATTEMPTrD FINAL
r
F] Framing El ,Separation Walls Sprinkler System
Shaft Fire Dampers ` (OveL(adlU,9&rground) ,
❑ Alarm System El Hood' Extag Systems l -conference
Spray Booth ` Ceiling Cover 0 Other
r'
Date '��r Inspector: _ / �.�
p rwn
.t, y
( k
INSP$C'I'tON NOTICE
City of Tigard Buildup Depart—t
13125 SR Ball Blvd. Tigard, Oregon 97223
Inspection Line (Rec-O-Phone): 639-4175 Busineas Phone: 639-4171
Footing Flbg. Underslib Koch. Rough-in Appr./Sdwlk
Fat:nd. Plbg. Top Out ass Line FINAL:
Post/Beam Strum. San. Sower (traoLng -Bldg.
Post/Beam ?tech. Rai.: Drain Insulation -plumb.
Plbg. Underfloor Nater Line -Mach.
Date Requested: I / - T1lMf AN , P!1
Addresm: I )7_.ld L�tE V VG �-C- P..it #�UP`�
�- I < 1
Builder= Mc�vK '� 'tiJ 1 / l I y w
TBE FOLI.OMINO CORRECTIONS ME REQUIRSDt
i
��.
Inspector:
Data �
✓ _
APPROVED DISAPPROVED APPROVED SUBJECT TO ABOVE
Call For Reinsp.
' I
now
da
1 �
CITY OF TIGARD
COMMUNITY DEVELOPMENT DEPARTMENT Z'1I1.[)1sVty ki+�I7
13126 SW Hall Blvd,Tlpard,Oregon 97223•8199 (503)639-4171
i�T... i�:r.iiJM�'i). J 1iFltii•�`�
' viii.1...✓r. 1;J.L.�.0(•yLi.-'l�;;i�`i�JI�
,.chi:. .+l:
f»✓:tiaL.lC: �..il.l .;.:;':,..... I_ �. 11:.+�:" ��F? 416?E..L. L:J(�i1�T'r?l..a::'!`IC3►•''
+t OF
YPE OFC 0N: 1'« . 1t..�� i F?Y' i 5 �i. d E W
iXi..il'FPNC,
(r'C:Uf'E? IC'! +_L:iFll!; ':Df�(•;TE:1.):
^
aM.('?a N ,r,C_L L .
-JELLING t..FYI"I 1' fdNIJ I GFS OLv,
C c)t?i�I Nf'
'al_UE. $ s 1e,1'0'1
rh9at,k i -t: i ,.cm-ik .t 'li; d:L+ 1(J1laa "•'Pailce
:.LV 11\1 t: e am a+art; by da t;e rr'
SW GRE FT'IBUR(i FOM. PItM1 A !.:'U. bli7 ily 1. 1.,,'!Zl4i u3
10/29/93
!.: ;i.l J. 1 r 17+4.� �i,b
V 'hJ:
MARI', C:UtV 'i fr'UCA 1(.N%!
41TE #150
MAW) OR4)7 ,. _ _... . .._ .._ .- _ ..._..__ _._...._...._
1 u n r #z A:`a L::
_...._.... F?EQUIRED IPOSt=L(2TIONS «..»..___..
;s pereit ,. issued sut�ect to the regulations contained in tlir Fi,aming Iris;i
Bard suricipal Code, Mate of Ore. Specialty Codes and all otiter I ti s u l at i u n 1 m:, i _..�.._.. _..__ ,_ . __....__...
.pliable iaws, L+li work gill be Done in accordance with bYp Bray-d 1'-1->p
:proved plars. This pereit will mire if wurl! is nct starteu L31..t W p L:e j i ng I r.,.Sp
thin 18" days of i5suarce, or if ww-k 4s suspended for sore F=1 71,-11 1 n'�i'!p V L i.c r, »
!80 days.
,y.
Ir
.,a
1r
I
i
1
11
` b
L;I1'Y OF 11GARD - ItEA,LIPl OF' PAYMkNI RE:C.+-II•,I NU,
C;HE.[;K AMUUN F' a 1,i4. 9
i�u 1MN a HL:;CaKF.R, R010;.KI' CASH AMOUNT a 0 0W
MDRESS s PAYML N7 DATE a 11/rR14/9 3
!;LJBDIVIISION a
i
1 PI1T21-''US . OF PAYMENT AMOUNT PA 10 PURPOSE OF' PAYMENT AMI:ILIN F VIA I I)
10,11L.DIN6 PFF1M_ tE.g. ;�iu1 ST'.. BUILD PER � A. 43
i
10260 SW f3RFl.-.NfAlJRG SUITF 820
FIRST FRi4NKLIN
I
'i
y
I
101 Al_ AMI 7LINl' LAID _ - -> J34. 93
Vii
r• � Srh (( ! re gl o a:7 � it Cj,,a'.'i aM r# � T.
Commercial Buildinq Permit Application
Ciiy of Tigard
1312.5 SW Hall Blvd.
Tigard, OR 97223
(503) 639-4171
JobsiteAd 6�ess:— S�
Office Use Only
Tenant: l�sf P,t� ��, Suite 1! � t
�7 � 7
Itz
0 PianddRec# f t/ -Ike, —_-
Valuation:
Yrt� "''� -
Owner: `f �yZt1 �Y��l� 1f %lC :C /f'. ►. ... r 'j ,C x..-
Address: 1422. 0 GY L'
Approvals Requlned
L,L --- P,arrnin9..__
I Phone: 6EQ ` �2 �� -- Enginee-in' _-
I
Other
Contractor:
Addre.s:
Occupancy class: 2
Phone: ,---
Sprinklered? YesNo
Contractor's License # `- a
(attach copy of current Oregon license) Sq. ft. of project J cf
Story (1 si, 2nd, etc.)_
Proposed use:
1 Address: �ly Note: Pkimbing & mechanical plans
must be submitted at time of
building permit application.
Phone:
COMMENTS: --------
I
Signature & Phone number
r �
Received by. Date Received:
i
i
t
I,
Permit # Account Description Amount Amt. Pd. Bal. Due
Bldg. Permit (BUILC)
Plumb. Permit (PLUMB) _
Mech. Permit (MECH)
State Tax (TAX)
•
Bldg:
Plumb:
Mech.-
Plan
ech:Plan Check (PLANCK) —
Bldg:
Plumb:
Mech:
Sewer Connection (SWUSA)
Sewer Inspection (SWINSP)
Parks Dev Charge (PKSDC)
Storm Drainage Chg (SDSDC)
Residential TIF (TIF-R)
Mass Transit TIF (TIF-MT)
Commercial TIF 0 eF-C) _
Industrial TIF (TIF-1) -
Institutional TIF (TIF-IS) _
Office TIF (TIF-0)
Water Duality (WOUAI-)
y
Water Quantity (WOUANT) ---- —�
,F.
Fire District (FIRE)
I TOTALS
LIIV 1.J. r [hit�Ft1.► - ISI la aF I 111 f iarhll Idl FSI r_F..al ! rJl.l. rpt ; ; 4;`, "/ 3 •
f IMI JUN I
NAME z HF.','C.KEri, k1..IBE'N'I" .tt�Sil fHSIIUNl 0. 00
FIUa.►FZF-:fi�:i 4 PAYMt N I aJF'a"F'I:
tVJBOIVISIUN x ar
PI.114 UBF. OF PAYMENT t1Mt 11.IN f N►a I D I lI.JRPCY.4:' C,:= P'AYMEN'T 0MCIl.JN a' PAIL)
i
F
IN!, I F RANKL.IN
1 V+i?f.0 SiW I:1f2L-E NHUR141 til IJ 'IF Seo
r(I TAI_ NMr)UN t ;-4110
}y.
i
i
v
.4
Y
ROBER'F A. BECKER
SPACE PLANNING & INTERIOR DESIGN
PROJECT: revisions to existing tenant offices at
LINCOLN CENTER; Lincoln Tower
10260 S.W. Greenburg Rd. a►
Portland, OR 97223
e
I
MANAGEMENT: MELVIN MARK BROKERAGE COMPANY �
10220 S.W. Greenburg Rd. , Suite 150
Portland, OR 97223
attn: Brad Knodell, Asset Manager
(503) 452-5900
FAX: (503) 452-5602
TENANT: FIRST FRANKLIN
10260 S.W. Greenburg Rd. , Suite 820
-' Portland, OR 97223
i
attn: Bruce W. Dickinson, Vice President
(503) 452-8748
FAX: (503) 452-9840
j DESIGNED: ROBERT A. BECKER
SPACE PLANNING & INTERIOR DESIGN
9660 S.W. Eagle Ct.
Beaverton, OR 97005
L ,
attn: Pobert Becker
I
(503) 646-1862
J FAX: (503) 626-8039
i
DATE: 27 October, 1993
i �
x
ISSUED FOR PERMITS AND CONSTRUCTION
iC
i
9660 S.W. EA. LE CT. BEAVERTON, OREGON 97003 I50�1 646- 1962 FAX(50?) 626-6039
a� t
d
:.1 u• 1M -,w.T i.naWq�rwfta N ,+"iNW + J III
.A
I
`Y
F
5
4
!I I
II I
I
r
PROJECT MANUAL for revisions to I
existing tenant offices of:
FIRST FRANKLIN
Two Lincoln South, Lincoln Center
101.60 S.W. Greenbury Rd. , Suite 820 I I
Portland, OR 97223
i
III
I,
F
i
�I I
•
TABLE OF CONTENTS
PAGE
LOCATIUN OF' THE WORK. . • • • • • • • • • • • • . . . . . . 1
� ! WORK UNDER THIS CONTRACT. 2
1
WORK PERFORMED UNDER SEPARATE C'ONTRACTS. . • • . • • • • • • • / • / . . 2
s
i
SPECIFICATIONS
i
,.� 2 - 3
1 . GENERAL. . . . . . . . . . . . . . . . . . . . . • . . . . . . . . . . . . . . . . . .
2 . SUBMITTALS . . . . . 4
3 . DEMOLITION. . . . . . . . . . . . . . • • • • • • • • • • • • • • • • • • • • • • • 4 •' 7
4 . STANDARD STEEL FRAMES. . . . . . • • • • • / • • • • • • / • • • • • • • • • • • 7
5 . DOORS. . . . . . . . . . . . . ,. . . . . . . . . . . . . • . . . . • . . . • . . . • • • . . • . 7
6 . DOOR FINISH HARnWAF>.E. . . . . . . . . . . . . . . . . . . . . . • • . . . . • • • 7
7 . RELITES (GLAZING) . . . . . . . . . . . . . . . . • . • • . . . • . • . . 1 . . 1 . .
8 . GYPSUM DRYWALL. . . . . . . . . . . . . . . . . . . . • • • . . . • • . . . . . . . . . 8
J 9 . ACOUSTICAL CEILING TILES. . . . . . . . . . . . . . . . . . . 1 . i • . • . • 8
10 . CARPETING, . . . . . . • . . . . . . . . • . ii . . • . • • . . • • . . . • . . • / . . 9
I
+ ti) 11 . PAINTING. . . . . . . . . . . . . . . . • . . . • • . . . • • a • aa • a • • • • • • • • • . 9
12 . FIRE PROTECTION. . . . . . . . . . • . . • • . • . . . . . . . . . . . • . • . . . . • 9
I
1 13 . HVAC. . . . . . 10
I
14 . ELECTRICAL. . . . . . . . . . . . . • • . . . . . . . . . . . . . • . . . . . . . . . . . 10
1 15 . PLUMBING. . . . . . . . . . . . . . . . . . . • . . . 1 . . . 1 . . . . . • . . • • • • . . 11
I
16 . LIFE SAFETY SYSTEM. . 11
`6
,9 17 . SERVICE CONFLICTS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
P
,i
:a� 41%
r ) y
'..fi
I �
i
i
TABLE OF CONTENTS cont.
DRAWINGS SHEE'."
1. LOCATION AND SITE PLAN. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
2 . GENERAL NOTES. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 •
3 . GENERAL NOTES. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
•
4 . TENANT DEMISING WALL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
5 . OFFICE PARTITION WALL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
i
I
,i
1 �
�l
Y ..
END
RAB/14 .9ti.m
+�9
1
-� i rt, � ,°i. r s'.--:�•, r a'
F �
04
t;
27 Oct. , 1993
page 1
V'
{It
M
i I
l
i 6
The following changes in the tenant leaseh d at 10260 S.W.
Greenburg Rd. , Suite 201 , Two Lincoln South, LINCOLN CENTER,
Portland, Oregon, are proposed. These Contract Documents
have been reviewed and approved by Tenant and Management for
application for required permits.
The CONTRACT DOCUMENTS for this project are comprijed of one '
(1) each blueline, 18"x 24" print: FLOOR PLAN and REFLECTED
CEILING PLAN, dated 26 July, 1993, and a PROJECT MANUAL,
cover dated 27 October, 1993, that includes SPECIFICATIONS
and 8j"x 11" SHEETS, dated 2.2 and 25 October, 1993.
The SPECIFICATIONS and SHEETS specifically .reference exist-
ing tenant improvements, details, and materials that are to
be duplicated or matched for this project except as specif-
ically modified herein.
LOCATION OF THE WORK
1 . The proposed tenant revisions are to become part of the
general tenant leasehold located within approximately
3 , 864 square feet at the eigth floor of an existing
building located at 10260 S.W. Greenburg Rd. , Portland, y
OR 97223 . Construction type: II-N, sprinklered,
Occupancy: Group B, Division 2 , Building Use:
i administrative and management offices.
i
7
i
i
k�
r
r ,M
.i
i
27 Oct. , 1993
page 2
Y � j
WORK UNDER 'PHIS CONTRACT � .
t
1 . All new construction and/or alteration of existing
tenant office space for tenant FIRST FRANKLIN as defined
by these Contract Documents include, but are not limited
to:
(A. ) development of an additional office;
(B. ) reconfiguring the existing lunchroom;
i
(C. ) addition of necessary lights and electrical;
(D. ) addition of a second exit;
(E. ) patch, repair, and add new carpet and shampoo
existing carpet;
j (F. ) necessary demolition; and
(G. ) construction of new and repair of existing walls
throughout tenant area.
WORK PERFORMED UNDER SEPARATE CONTRACTS
1 . General furnishings and "Open Office Workstations" .
These may be identified herein as 'N. I.C. "
(not in con+ract) . {•''
SPECIFICATIONS
P,
1 . GENERAL
k
(A. ) Work being shown and specified in tnese Contract
Documents is intended to coordinate with existing
field conditions. Dimensions take precedent over ,
scale. Where discrepancies occur between Contract
Documents and field conditions within the de-
scription of work addressed herein, the Contrac-
tor shall request a clarification prior to pro-
ceeding with the work.
t
..y
xn w. n
��. .� r t t
ru
'1"Ab—
t ,
27 Oct. , 1993
page 3
{ (B. ) Contractor and Subcontractoro shall carefully a
examine the existing site and Contract Documents. w
Errors and omissions in the plans and specifica-
tions shall be called to the attention of the '
Designer prior to construction so that an
addenda or change order, if necessary, may be
issued. Failure to do so on the part of the
Contractor does not relieve him of the responsi-
bility to provide a correct and finished product. _
(C. ) All workmanship and materials shall confcrm to the
latest adopted building code edition and to
conditions and specifications of all govern--'-ng
authorities.
(D. ) Application of materials by any Subcontractor to
surfaces existing or provided under this contract
shall imply acceptance and suitability of and to
existing conditions. Such Subcontractor shall be
held responsible for damage or irregularities to
his product as a result of previous conditions.
(E. ) The Contractor shall obtain and pay for all
permits and fees, and all additional drawings and
specifications, if any , required for permits to be
supplied by General Contractor and Subcontractors.
(F. ) The Contractor shall provide and pay for
dumpster (s) , and telephone as may be requested for
his/her and his/her Subcontractors' use,
(G. ) No storage outside the building shall be allowed
without written authorization of the Building
Management.
(H. ) Management and Tenant shall not be responsible for
tools or material goods stolen or damaged on site.
th (I . ) Upon completir,n of work the Contractor shall
thoroughly cl-,an the premises so that the tenant
area is acceptable for occupancy by Tenant.
(J. ) All substitution requests shall be submitted to
and approved by Management, Tenant and Designer
prior to i-mplementaticn.
s
i
t
'a.-,ck . . .• .._..,..ww:�iN '�n", . . .,.,.,.,i., .. vre,+rA3fW1tl�IRn'.W vs,+r�lMOMMI�dvin.=r r ,...,,...,..__..
1
3
+
27 Oct. , 1993
page 4
1 �
2. SUBMITTALS
A. General: Provide submittals as specified
hereinafter prior to application or ordering product
r� and material.
B. Shop Drawings:
(1 . ) General: Provide shop drawings, if: any, in
1 accordance with the requirements of these
1 Contract Documents or Manufacturer' s requests.
Shop drawings shall clearly depict all
materials and methods of attachment,
dimensions, fabricated member detail sections
and relationships to adjoining work even l
though not by the same trade.
C. Samples:
' (1 . ) Three each 6" x 9" or larger of paint '
drawdowns, in each color and sheen required to
match existing on-site or new as specified by
MELVIN MARK BROKERAGE COMPANY; and
i
` (2. ) Three each samples of Roppe 4" toeless base to
4 match existing on-site or new as specified by
MELVIN MARK BROKERAGE COMPANY.
f84' 3. DEMOLITION
1,
A. General:
x 4•
(1 . ) Perform demolition and alterations to
F, existing tenant improvements in accordance
NW with these Contract Documents, conform to all
A
; y applicable codes for demolition work and
removal, and obtain required permits from
iappropriate governing agencies.
i
3
i;
F'
4
y
27 Oct. , 1993
page 5
(2 . ) Contractor to coordinate the removal and
disposal of all existing building materials
scheduled to be removed with Management. n
(3. ) Contractor to patch, repair or replace any 40
' surface and material not designated for
demolition but is damaged during construction.
Management and Contractor will determine the
extent of repair required to return affected
area (s) to original condition or better.
a B. Scheduling: '
(I . ) Before commencing alteration or demolition ,
submit for Management and Tenant approval a
schedule showing commencement, order and
completion dates for various parts of this
work.
�II r
(2. ) Notify Management prior to performing work
which will. generate smoke or dust as existing
fire alarm system is sensitive to these
particles.
(3. ) Contractor to notify affected utility
companies before starting work and comply with r
their requirements, and do nut disable or 9
disrupt building fire or life safety systems
without prior written notice to Management.
C. _Protection:
(1 . ) Make explorations and probes as nece3sary to
ascertain required protective measures before
proceeding with demolition and removal. . Give
particular attention to shoring and bracing
requirements so as to prevent damage to
existing construction.
J
(2 . ) Provide, erect and maintain l:;.ghts, barriers,
warning signs, and other items as may be
required for proper protection of the public,
occupants of building, workmen and adjacent
construction.
�'J
A
1
y 1
27 Oct. , 1993
page 6
i
(3 . ) Tale necessary precautions to prevent dust and
dirt from rising, and construct and maintain
temporary partitions as may be required to
prevent the spread of dust., odors and noise.
Protect unaltered portions of existing '
building by dustproof partitions and other
adequate means.
(4 . ) Do not close or obstruct walkway widths to
exits as as may comply with prevailing codes and ( g
regulations. Do not store or place materials
in passageways, stairs, or other means of
egress . Conduct operations with minimum
traffic interference to general and public
areas of the Building.
c
(5. ) Be responsible for damage to existing struc-
ture or contents.
D. Workmanship: i
(1 . ) Perform demolition, removal and alteration
work as shown with due care , including
shoring, bracing, etc. Contractor shall take
care to protect all items specifically
mentioned or implied as to remain or to be
relocated.
(2 . ) Execute the work in a careful and orderly
manner, with the least possible disturbance
to public and to occupants of building. r
r
(3 . ) Where alterations occur, or new and old work
join, Contractor to cut, remove, patch, repair
or refinish adjacent surfaces to the extent
required by the involved conditions to create
an appearance equal. to, or better than as
�j existed prior to commencing the work. Mater_
T. and workmanship employed in alterations,
unless otherwise shown or specified, shall
conform to that of the original work and all
alteration work shall be performed by the
,�: respective trades which normally perform the
particular items of work.
4 (4 . ) Finish new and adjacent existing surfaces as
specified for new work. Clean existing
surfaces of dirt, grease, loose paint, etc.
before refinishing.
r L�• n
j wn !'Cp YiI,.'/('.'.i:Mk'!l k.i;,«" F.1y{ rl., .+✓.'..... ., ...... ...- ....,,..b, t- .;,v,, nMs,.w,.Jn
y+ �
4
s • •
i
27 Oct. , 1993
' page 7 I
C
I I.
(5 . ) Materials which are removed shall be consid-
ered r.euseable unless released by Management.
Contractor is to take all necessary precau-
tions in the removal of material to insure the
least amount of damage. Materials which are
removEd shall be delivered as directed by the I r
s
Management, or discarded as the Management may
s
direct..
E. Clean-Up:
i
(1 . ) Contractor to keep area of work free of waste
and debris as work progresses and maintain
premises in neat and clean condition.
4. STANDARD STEEL FRAMES
A. General: Provide and install metal frames and
i interior glazed relite frames to match existing
I on-site , or as specified herein. j
B. Finish: color to match existing.
5. DOORS
A. General: Existing on-site doors are to be retro-fit
with specified hardware unless otherwise noted
herein, or as may be required by the hardware
manufacturer for compliance with warantees, or as
may be required to assure compliance with all.
prevailing codes and regulations .
Q
B. Finish: to match existing on-site.
lC. Hardware: to match existing on-site.
D. Operation: Doors shall be openable from the inside
without the use of a key or any special knowledge or
effort.
6 . DOOR FINISH HARDWARE
A. General : Provide finish hardware as specified
herein and compliant with all current and applicable
codes and regulations.
;3
r
SKr
ru,j
27 Oct. , 1993
page 8
7. RELITES (GLAZING)
A. General: installation details and frame of new
rPlite is to match existing or as amended herein,
1 and as may be required by governing codes and.
' regulations.
B. Sizes: to match existing tenant offices on-site.
8, GYPSUM DRYWALL
A. General: Provide gypsum drywall as specified
herein: all exposed gyp, bd. to be taped and sanded
to match existing adjacent surface texture per
buildi!ig and tenant standard, and all gyp, bd. to be
minimum 5/8" thick screwed to 3J" metal studs at 16"
o.c. , unless otherwise noted.
B. Miscellaneous: Provide 1j" or tenant standard,
sound attenuating batt insulation at new wall
construction where indicated on drawings. Contractor
to verify with MELVIN MARK BROKERAGE COMPANY before
installation ,
., C. Finish and Color: Provide painting in accordance
with Color Specifications as may be available
through MELVIN MARK BROKERAGE COMPANY.
I
9. ACOUSTICAL C'E'ILING TILES
A. General: Acoustical Ceiling the to conform to all
prevailing codes and regulations, and be in
!' accordance with these Contract Documents.
B. Execution: Where required by prevailing codes and
regulations , provide additional ceiling suspension
members, accessories and bracing to structure,
including where main runners are cut to make way for
other work as specified herein. Install all
materials in accordance with manufacturer' s
recommendations.
C. Replace damaged or discolored standard
acoustical ceiling tiles with new or relocated
on-site stock to match existing . Finished ceiling to
be uniform in appearance.
Q�
k'
X
••
27 Oct. , 1993
page 9 N:
'a
10 . CARPETING
? A. General: Carpet Subcontractor shall provide and
jinstall carpeting, and underl.ayment, if any, in
accordance with Tenant Standards and pc.- color as
directed by MELVIN MARK BROKERAGE. Contractor to
verify.
B. Materials:
(1 . ) Cadet: to match existing or as selected by
MELVIN MARK BROKERAGE COMPANY.
(2 . ) Base: to match existing or as selected by
MELVIN MARK BROKERAGE COMPANY.
11 . PAINTING
A. General : Providepainting and prep work in
accordance with established standards of Lincoln
Center.
B. Materials: Provide "tenant Standard" paint materials
or as specified herein. In addition, Contractor to
provide labeled touch-up paint, label all left over
paint, and store as directed by Management.
C. Safety Precautions: Provide complete safety
measures at all times for protection of persons,
materials and locations against hazards related to
painting systems and materials and their use.
_ Comply with all manufacturers recommendations in the
use of their respective products.
1). Paint Color Schedule:
(1 . ) to match existing, unless otherwise directed
by MELV.IN MARK BROKERAGE CnMPANY
12 . FIRE PROTECTION
A. General: It is understood there will be no
j alterations to existing sprinkler and fire
protection systems unless otherwise required for
amended compliance with all current and prevailingy .`
codes and regulations . If alterations are required '
relative documents are to be developed and submitted .1;:
by the Contractor for approval and :implementation.
contractor.
5"�
7
^!S
F
(qi +��
f1}M. r4f !
y
1
27 Oct . , :.993
page 10
a
� r
13 . HVAC: 'There are no anticipated alterations to the
heating, ventilation, or air conditioning systems
existing to this tenant. (no changes)
14 . ELECTRICAL:
A. General: Basic materials and methods for all
i new electrical services are to comply with
current relevant codes and regulations, and be
compatable with tenant' s existing services including
receptacles. All. electrical designs for required
system revisions and additions to be by Electrical
Contractor who is to submit plans and specifications
to Management and Tenant for review and approval
prior to construction, pay all fees and obtain all.
permits and approvals from governing agencies
necessary to complete work, and coordinate with the
General Contractor those items for demolition not
specifically indicated herein.
i
B. Demolition:
(1 . ) Contractor to verify all existing electrical
Q service and shall provide additional service
and receptacles as required compliant to all
ti applicable codes and regulations.
(2 . ) Contractor to disconnect and cap designated
utilities within demolition areas and
accurately record actual locations of capped
utilities, if any.
(3 . ) General Contractor to coordinate all systems
to he located in and above the ceiling,
including fire protection, smoke detectors ,
H.V.A.C. , electrical systems and security
systems.
C. Receptacles: Contractor to confirm receptacle types
with Tenant and match existing outlets and cover-
plates for consistency of color, unless otherwise
instructed.
D. Lighting: Provide and install 241x 48" fluorescent
fixtures to match existing in tenant area. Any
conflicts to placement of fixtures as shown herein
are to be brought to the attention of Designer and
Management. Verify circuit (s) and switching with
Designer and Management prior to installation.
I '
f
K
k
0
1
;I
27 Oct. , 1993
page 11
i
15. PLUMBING: (no changes)
t
16 . LIFE SAFETY SYSTEM:
A. General: Provide any modifications to life safety
systems as may be required to conform to all
governing codes and regulations.
z
17. SERVICE CONFLICTS
A. General: Contractor shall field verify all
dimensions and conditions prior to starting
demolition and construction and report any
discrepancies to the Designer. Where conflicts may
occur between new construction, fixtures and
equipment indicated to be installed in, or adjoining
the existing ceiling, structure, plumbing, fire
protection, electrical, and HVAC systems, the ';,
Contractor is to bring to the attention of Designer +
and Management before proceeding.
,a
pp ..1 I�IMA
F
u
i
4
END
RAB/14 . 6tim
11i 7
l�
.b w•
SKY
is NMI
' MCC"THE �►
. •. ., � yam,
w \ ' " r h
Iwo l ,,
NORTH
C( � a j
71*° �
SOUTH
FAMNo
� rrE
ONE
1 Iwo um
i
LAMA
r 1
UNCOLN CENTER
--Q4�
^ow
,,U
M.M MAW onoUune oovAm
-- M=SW.GFEBOL o-wnt Iro
-----'--— Pa MAA all urw
ii
•f-
I
tyl
---- — - P)u11 C No — --- SHEET
QJSCALE: - _
---- DATE: � REVISED: -- -------
RORE!`TA• DECKER • SPACE PLANNING & INTERIOR DESIGN
9660 6 W EAULk CT 11LAVkp7UN , (JURGON 97003 1301► 616 1063 FAX 1101) 6l9-j01g
r.JT
I to
II A
•
The following GENERAL _NOTES apply to the attached
blueline prints: FLOOR PLAN and REFLECTED CEILING PLAN,
dated 10/22/93.
1
I CP Cap existing electrical. outlet for future, remove wood
!? mounting strips, patch and repair wall to match 1IIIM
existing adjacent and paint sheen and color to match
existing, unless otherwise noted.
20. Retain existing stub wall and exi-sting services (light
switch, power switch, etc. ) . Existing door frame to be
removed and stub wall finished with sheet rock and
corner beads and painted per tenant standards .
0. Install new emergency exit door with appropriate
hardware to comply with current relevant codes and
regulations.
C4 .) Infill existing door opening, patch and repair and
�a finish and paint to match existing adjacent wall
surfaces.
ONew 36" high x 24" deep plastic laminate covered
casework to include 4" toe space, fini.shed interior
floor and ends, with (2) adjustable shelves. (No doors,
drawers, or upper cabinets)
4
UTypi.cal tenant standard tenant interior partition
comprised of 2}" metal studs with 5/6" gypsum board
both sides to lay-in ceiling. (Tenant demising walls to
p' go to structure unless otherwise noted. )
Existing built-in dishwasher to remain: no changes.
Existing electrical duplex convenience outlet to remain
for tenant' s refrigerator (N.I .C. ) and water cooler
9.) ?� love for relocation to north wall approximately
10 ' -9V of existing casework. Finish exposed end at
built-in dishwash with plastic laminate to match
9� face. (See note 13 ) ,
f
i
1
® T11'LE _ PROJECT NO SHEET
SCALE: _ _ DATE: - REVISED:
0I
ROBERTA. BECKER • SPACE PLANNING & INTERIOR DESIGN
9660 S W. EAGLE CT. BEAVE.RTON , OREGON 97003 •1303) 616 1161 FAX (303) 626 1039
� r
AI
a�XAtic r
r
. '4,� ! .. 1,.ir�.•.,+a�+4rriMYaMrIc�,MtM•N".MMtMw,', , „„ ... ..
ti
I
1
11
1
10. Remove existing door and wall. Reuse existing door at
Q new locution of entrance to Lunch: 805. Remove existing
hard surface flooring (EXCEPT at reconfigured LUNCH: ;
805) and replace with carpet to match existing. Clean {
1 and sLampoo all carpet areas upon completion of new G
construction.
11 Complete infill of existing door opening , patch and
10,
repair to match adjacent wall surfaces and install 41x
8 ' # (verify) Homosote Panel (exposed surface treatment
to be selected) over new construction.
12 Retain existing casework: approx. 42" (verify)
13 Proposed relocation of existing lower and upper casework
from west wall. Provide grommet access as required to
existing duplex convenience electrical outlet.
14 New office walls, door, reli.tes, and all relevant
materials, finishes, details, and dimensions to match
existing offices unless otherwise noted.
15. Contractor to verify location of existing thermostat to
avoid conflict with new tenant demising wall. Relocate
thermostat to alternate location to appropriately
regulate existing tenant zoned HVAC system.
r
M
i
END
RAB/14 . 8tim
TITLE: PROJECT NO, SHEET
-- - - — L
SCALE: - = DATE: =y — REVISED:
ROBERT A. BECKER • SPACE PLANNING & INTERIOR DESIGN
9660 S W EAGLE CT BEAVERTON, OREGON 97005 15U31 646 IM61 FAX ( 503{ 616-6039
S Vr.
.1
A
f
f
•
f
EXISTING STRUCTURE
-- b' BATT. IN5UL. Q SIM ONLY
REF. TO PLAN FOR LOCATIONS
N-^U- TO CVLIING— CEILING PER P.EFLEOTED PLAN
C� A99 �� FFED -- -- MTl_ 5TLO5 6 24. O,C,
TYPE W GYP. BD.
„K
1.
i
TITLE: - I PROJECT NO: SHEET
SCALE: - - i
DATE: Fl. lipREVISED:
ROBERT A. BECKER • SPACE PLANNING & INTERIOR DESIGN
9660 S W EAGI E CT, BEAVERTON, OREGON 97003 1303) 646 1862 FAX (303) 626-8039
. :
l
t
f�
rN
1!
p
I
Y
1
a 16
C
-- ACOU3TIG TILE CEILING
A55EMBLY.
4
c
7
-•- -- - - 2113' MTL 5TUE)5
' 24' O.C. W/
GYP. BD. EA 91DE
2" RUBBER BASE.
VERIFY W/ FINI9N SPEC.
CARPET OR 9NEET ',,'INt'L
TITLE:
TYhIG .
PROIEC'T NU: SHEET `
Vj SCALE: ._ _ ATE: REVISED: -
116BERT A. BECKER • SPACE PLANNING & INTERIOR DESIGN
9660 S EAGLE CT BEAVERTON. OREGON 97003 1503) 646 I862 FAX (3503) 626 8179
wrfi�,-,P"j Afw I N.•l„� .:v ez•R.>vn.,., ,..:....