Loading...
Permit (7) CITY OF TIGARD BUILDING PERMIT II: COMMUNITY DEVELOPMENT Permit#: BUP2018-00173 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 06/20/2018 Ti Parcel: 2S 112AD01000 Jurisdiction: Tigard Site address: 7007 SW CARDINAL LN 135 Project: PacStar Subdivision: PACIFIC CORPORATE CENTER Lot: 1 Project Description: Metal awning over storefront. Contractor: PIKE AWNING CO Owner: PACIFIC REALTY ASSOCIATES LP 7300 SW LANDMARK LN ATTN: N PIVEN PORTLAND, OR 97224 15350 SW SEQUOIA PKWY#300 PORTLAND, OR 97224 PHONE: 503-624-5600 PHONE: FAX: 503-968-5440 Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: VA Permit Fee-Additions,Alterations, 06/20/2018 $180.17 Demolition Occupancy Grp: B Occupancy Load: 0 12%State Surcharge-Building 06/20/2018 $21.62 Dwelling Units: Plan Review 06/06/2018 $117.11 Stories: Height: ft DC Provision Review,COM TI-Ping 06/20/2018 $91.00 Bedrooms: Bathrooms: Info Process/Archiving-Sm$0.50(up to 06/20/2018 $7.50 Value: $7,000 11x17) Floor Areas: Total Area: Accessory Struct: Basement: Carport: Covered Porch: Deck: Garage: Mezzanine: Total $417.40 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. e Issued By: � 2.- - • • •,nature: A &Iver _2- .639.4175 .639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application Commercial 1 OR(11 IR 1_ i .i 0\I., RE+ " •, eived y y� City of Tigard _ ' ., Pate/By: C l Permit No.: /O .—cx;1 73 13125 SW Hall Blvd.,Tigard,OR 97223 Plan Review `/9 47,--- ! R Phone: 503.718.2439 Fax: 503.598.1960 Date/By: 6,... ))-J C Other Permit: ttf )j f,; ),t, 3. f,,,n K t, Inspection Line: 503.639.4175 juN 2w Date ReadyBy: Z ' loris: See Page 2 for Internet: www.tigard-or.gov Notified/Meth.,: r / I Supplemental Information `;' ' ,I . .7Lam_ ......... "dr —....64 TYPE OF WO' rG DIVISION REQUIRED DATA:1-AND 2-FAMILY DWELLING I DIVISION A 1• 0 New construction 0 r ()M� ;< Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all 0 Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1-and 2-family dwelling ®Commercial/industrial Valuation: $ ❑Accessory building 0 Multi-family Number of bedrooms: ❑Master builder 0 Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address:7007 SW Cardinal Ln. New dwelling area: square feet City/State/ZIP:Portland,OR.97224 Garage/carport area: square feet Suite/bldg./apt.no.:a 135 Project name:Pacstar Expansion Covered porch area: square feet Cross street/directions to job site:SW 72od Ave Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: I Lot no.: Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Tax map/parcel no.: equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. install metal awning over storefront Valuation: $7,000.00 Existing building area: square feet New building area: square feet 0 PROPERTY OWNER ® TENANT Number of stories: Name:Pacific Star Communications Type of construction: Address:15055 SW Sequoia Pkwy Occupancy groups: City/State/ZIP:Portland,OR.97224 Existing: Phone:(503)403-3000 Fax:( ) New: 0 APPLICANT 0 CONTACT PERSON BUILDING PERMIT FEES* Business name:Pike Awning Co. (Please refer to fee schedule) Structural plan review fee(or deposit): Contact name:Dan Spearing FLS plan review fee(if applicable): Address:7300 SW Landmark Lane Total fees due upon application: )ii City/State/ZIP:Portland,OR.97224 �`l Phone:(503)624-5600 Fax::(503)968-5440 Amount received: E-mail:dan@pikeawning.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted Photo Voltaic Solar Panel System. Business name:Pike Awning Co. Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address:7300 SW Landmark Lane Solar Installation Specialty Code checklist. City/State/ZIP:Portland,OR.97224 Permit fee(includes plan review $180.00 and administrative fees): Phone:(503)6124-5600 Fax:(503)968-5440 State surcharge(12%of permit fee): $21.60 CCB lic.:32364 4 Total fee due upon application: $201.60 ...,...,- Authorized signature: This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name:Dan Spearing Date:5/30/2018 * Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\BUP-COM PermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB) City of Tigard IIq COMMUNITY DEVELOPMENT DEPARTMENT ■ T l c A R o Building Permit Review — Commercial - With Land U s e Building Permit #: t'4," I.1j--cjt 173 Site Address: 7- ,,.;,( ( ,.i. Suite/Bldg#: ( 3 S Project Name: P u.,c 6,- Sc re.Ns-`r (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review. II II Proposal: Z�; ll1 Ni-Al lawn, ,ft.- �;rtM,t,\r 12Verify site address/suite# exists and active in permit system. 13 er Terrace Neighborhood: ❑ Yes ErNo Igo Land Use Case#: 0110 Liiig 000LLf '7Pl atch Approved Land Use:p Site Plan I ndscape Plan Other: Urban Forestry Plan Elevation Plan lad Building Height: Maximum Height S Actual Height i n kHn �, � g � t• �L Conditions Met: CI to Submittal CI Prior to Permit Issuance ' [El'Business License: Exists: ❑ Yes No,applicant notified to obtain business license LCG Public Facilities Improvement (PFI) Permit: ,.,_,/ Required: ❑ Yes,applicant was notified LI,d No Applied For: ❑ Yes ❑ No,stop intake Notes: Approved by Planning: itW—e- Leid-,- Date: C_6_1/ Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: 6/6/1 Site Plans: # /j/ Building Plans: # 3 Building Permit#: 111 -e�building ,��permit--#- above. Workflow Routing: LS�Planning LE'Engineering Coordinator E--Btit ding Workflow Sign-off: Ci ff for Planning(include notes from planning review) Route Application Documents: ding: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician:0 ,,` •' 15-.- =----- ----W'.,_ te: _02. c I:\Building\Forms\BldgPermitRvw_COM_WithLandUse 060116.docx En, tieering Review G ai2.16pe at building pad: //0 Permit#: �� /FI onditions "Met"prior to issuance of building permit /ll1,4 [ asements (encroachments)per engineering conditions of approval and plat (not typical on SDR/CUP) Water Quality/Quantity Facility: /✓P11— Assess Water Quality Fee in-lieu: ❑ Yes ❑ No Assess Water Quantity Fee in-lieu: ❑ Yes E No LIDA Facility on lot: ❑ Yes ❑ No ❑ NOT Approved by Engineering: Date Notes: Approved by Engineering: Date: - lig'-- Revisions (after Building Submittal only) Reviewer Date Revision 1: 0 Approved 0 Not Approved Revision 2: 0 Approved 0 Not Approved Revision 3: 0 Approved ❑ Not Approved Permit Coordinator Review NConditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes SN/A Tigard Trans SDC: ❑ Yes N/A Parks SDC: ❑ Yes N/A lk-OK to Issue Permit Approved by Permit Coordinator: 0 A 'A' Date: Le 114)1 5 I:\Building\Fonns\BldgPermitRvw_COM_WithLandUse_070915.docx