Loading...
Report fillST-02018— X1319 ®/U ®® 2700 S E Harrison St 42-S:Olt 0B Milwaukee,Oregon 97222 ��■ :1111 .0 STRL.�CTURAL Tel503.607i0481 ®/■►.�4 ENGINEERS l=ax.503 607.0486. o Conference Project Kelly Residence— I4260 SW McFarland ❑ Phone Client Black Diamond Homes,Inc. Job No. 18-198 ❑ Field Subject Framing issues Date 16 June 2018 ® Memorandum Distribution Jeff Bettinelli By BWK ❑ Job Observation Time Jeff: It is my understanding the City inspector had a few questions regarding existing and new conditions related to the above referenced project: 1. The Simpson HH4 hanger for the 4x8 header over the new bathroom window is more than adequate to support the roof load above. 2. The existing 1/-3/4"diameter hole through the studs for the vent piping on either side of the new window is not a problem. 3. You mentioned that existing wall sheathing is stapled rather than nailed and the staples are 16 gauge x 1-1/2"Iong at 6"o/c. In order to provide sufficient strength similar size staples should be added between the existing to provide a final spacing 2"o/c at the edges. The staple should be applied with the crown parallel to the framing member and staggered. Please contact me if you have any questions. ,�gts GT ti ,� Sincerely, .10)1' PRQ /�e" )11V�, 61302 ga `1 S.E. OREGON 16Pc:1m_ydocumentstmemo\Kelly Residence framing issues.doc % 'i*Itkirif $ RENEWAL DATE:6130119