Report (2) RECEIVED
FILL/ REMOVAL GRADING IMPACT TABLE:
MAR 5 2018
Fill Dimensions
Wetland/Waterbody Name* Duration of Material***
Area(sq. ft) Volume(c.y.) Impact** �� 0 TIGAD
Access Road Fill in Wetland A 16860 630 Temporary rock
BUILDING DIVISION
Bridge Removal and Fill in Wetland A 310 20 Permanent soil, concrete, and rock
Exisiting Fanno Fill in Wetland A 620 450 Permanent soil
New Trail Fill in Wetland A 2170 140 Permanent gravel and asphalt kTa0\ --. O CO°a 1
Access Road Fill in Wetland B 1290 50 Temporary rock �!,� 1
Fill in Wetland B 310 30 Permanent soil \(\C €QX-' \'(\c ?}} ° 1
Existing Stream B Fill 490 120 Permanent soil
New Trail Fill in Wetland B 1030 60 Permanent gravel and asphalt
Existing Culvert Removal and Fill in Wetland B 90 50 Permanent soil
New Trail Fill in Wetland D 910 60 Permanent gravel and asphalt —j
EL-
Outfall and Existing Bridge Removal and Fill in Existing Fanno Creek 850 40 Permanent rock and soil
Exisiting Fanno Creek Fill 2270 6190 Permanent soil
Flood Plain Wood Fill Wetland A 390 17 Permanent Wood
Flood Plain Wood Fill Wetland B 30 1 Permanent Wood
Soil Lift Toe Wood Fill Wetland A 1598 70 Permanent Wood
Stream D Culvert Removal in Existing Stream D 70 40 Permanent rock and soil
Stream D Culvert Removal in Existing Fanno Creek 100 50 Permanent rock and soil
Soil Lift Toe Wood Fill Existing Fanno Creek 945 41 Permanent Wood
G.Total Fill Volumes and Dimensions
Fill Impacts to Waters Area(sq.ft) Volume (c.y.)
Total Fill to Wetlands 25608 1578
Total Fill Below Ordinary High Water 4555 6301
H. Removal Volumes and Dimensions (if more than 4 impact sites, include a summary table as an attachment)
Removal Dimensions Duration of
Wetland/Waterbody Name* Material***
Area(sq.ft) Volume(c.y.) Impact**
Fanno Creek Removal in Existing Fanno Creek 1780 140 Permanent soil
Fanno Creek Removal in Wetland A 40110 8440 Permanent soil
Stream B Removal in Wetland A 2120 830 Permanent soil
High Flow Channel Removal in Wetland A 190 30 Permanent soil
Stream B Removal in Wetland B 2370 330 Permanent soil
Stream B Removal in Open Water B 1582 97 Permanent soil
Stream B removal in Existing Stream B 306 16 Permanent soil >
Stream D Culvert Removal in Existing Stream D 70 10 Permanent soil o
Stream D Culvert Removal in Existing Fanno Creek 1090 20 Permanent soil, concrete, and rock
fX
Bridge Removal and Fill in Wetland A 90 50 Permanent soil and concrete
Existing Culvert Removal and Fill in Wetland B 850 40 Permanent soil, concrete, and rock
Outfall and Existing Bridge Removal and Fill in Existing Fanno Creek 1598 70 Permanent Wood
Soil Lift Toe Wood Removal Wetland A 945 41 Permanent Wood
Soil Lift Toe Wood Removal Existing Fanno Creek 1135 50 Permanent Wood
I.Total Removal Volumes and Dimensions
Removal Impacts to Waters Area(sq.ft) Volume(c.y.)
Total Removal to Wetlands 46675 9761 I
Total Removal Below Ordinary High Water 7561 403
RECEIVED
FILL/ REMOVAL GRADING IMPACT TABLE:
MAR 5 2018
Fill Dimensions
Wetland/Waterbody Name* Duration of Material*** CITY OF TIGARD
Area (sq.ft) Volume(c.y.) Impact**
• BUILDING DIVISION
Access Road Fill in Wetland A 16860 630 Temporary rock
Bridge Removal and Fill in Wetland A 310 20 Permanent soil,concrete,and rock
Exisiting Fanno Fill in Wetland A 620 450 Permanent soil
New Trail Fill in Wetland A 2170 140 Permanent gravel and asphalt
Access Road Fill in Wetland B 1290 50 Temporary rock
Fill in Wetland B 310 30 Permanent soil
Existing Stream B Fill 490 120 Permanent soil
New Trail Fill in Wetland B 1030 60 Permanent gravel and asphalt
Existing Culvert Removal and Fill in Wetland B 90 50 Permanent soil -
New Trail Fill in Wetland D 910 60 Permanent gravel and asphalt -I
Outfall and Existing Bridge Removal and Fill in Existing Fanno Creek 850 40 Permanent rock and soil u
Exisiting Fanno Creek Fill 2270 6190 Permanent soil
Flood Plain Wood Fill Wetland A 390 17 Permanent Wood
Flood Plain Wood Fill Wetland B 30 1 Permanent Wood
Soil Lift Toe Wood Fill Wetland A 1598 70 Permanent Wood
Stream D Culvert Removal in Existing Stream D 70 40 Permanent rock and soil
Stream D Culvert Removal in Existing Fanno Creek 100 50 Permanent rock and soil
Soil Lift Toe Wood Fill Existing Fanno Creek 945 41 Permanent Wood
G.Total Fill Volumes and Dimensions
Fill Impacts to Waters Area(sq.ft) Volume(c.y:)
Total Fill to Wetlands 25608 1578
Total Fill Below Ordinary High Water 4555 6301
H. Removal Volumes and Dimensions(if more than 4 impact sites, include a summary table as an attachment)
Removal Dimensions Duration of
Wetland/Waterbody Name* Area(sq.ft) Volume(c.y.) Impact** Material***
Fauna Creek Removal in Existing Fanno Creek 1780 140 Permanent soil
Fanno Creek Removal in Wetland A 40110 8440 Permanent soil
Stream B Removal in Wetland A 2120 830 Permanent soil
High Flow Channel Removal in Wetland A 190 30 Permanent soil
Stream B Removal in Wetland B 2370 330 Permanent soil
Stream B Removal in Open Water B 1582 97 Permanent soil
Stream B removal in Existing Stream B 306 16 Permanent soil
Stream D Culvert Removal in Existing Stream D 70 10 _ Permanent soil 0
Stream D Culvert Removal in Existing Fanno Creek 1090 20 Permanent soil, concrete,and rock tu
Bridge Removal and Fill in Wetland A 90 50 Permanent soil and concrete
Existing Culvert Removal and Fill in Wetland B 850 40 Permanent soil, concrete, and rock
Outfall and Existing Bridge Removal and Fill in Existing Fanno Creek 1598 70 Permanent Wood
Soil Lift Toe Wood Removal Wetland A 945 41 Permanent Wood
Soil Lift Toe Wood Removal Existing Fanno Creek 1135 50 Permanent Wood
I.Total Removal Volumes and Dimensions
Removal Impacts to Waters Area(sq.ft) Volume(c.y.)
Total Removal to Wetlands 46675 9761
Total Removal Below Ordinary High Water 7561 403
1