Report (2) RECEIVED FILL/ REMOVAL GRADING IMPACT TABLE: MAR 5 2018 Fill Dimensions Wetland/Waterbody Name* Duration of Material*** Area(sq. ft) Volume(c.y.) Impact** �� 0 TIGAD Access Road Fill in Wetland A 16860 630 Temporary rock BUILDING DIVISION Bridge Removal and Fill in Wetland A 310 20 Permanent soil, concrete, and rock Exisiting Fanno Fill in Wetland A 620 450 Permanent soil New Trail Fill in Wetland A 2170 140 Permanent gravel and asphalt kTa0\ --. O CO°a 1 Access Road Fill in Wetland B 1290 50 Temporary rock �!,� 1 Fill in Wetland B 310 30 Permanent soil \(\C €QX-' \'(\c ?}} ° 1 Existing Stream B Fill 490 120 Permanent soil New Trail Fill in Wetland B 1030 60 Permanent gravel and asphalt Existing Culvert Removal and Fill in Wetland B 90 50 Permanent soil New Trail Fill in Wetland D 910 60 Permanent gravel and asphalt —j EL- Outfall and Existing Bridge Removal and Fill in Existing Fanno Creek 850 40 Permanent rock and soil Exisiting Fanno Creek Fill 2270 6190 Permanent soil Flood Plain Wood Fill Wetland A 390 17 Permanent Wood Flood Plain Wood Fill Wetland B 30 1 Permanent Wood Soil Lift Toe Wood Fill Wetland A 1598 70 Permanent Wood Stream D Culvert Removal in Existing Stream D 70 40 Permanent rock and soil Stream D Culvert Removal in Existing Fanno Creek 100 50 Permanent rock and soil Soil Lift Toe Wood Fill Existing Fanno Creek 945 41 Permanent Wood G.Total Fill Volumes and Dimensions Fill Impacts to Waters Area(sq.ft) Volume (c.y.) Total Fill to Wetlands 25608 1578 Total Fill Below Ordinary High Water 4555 6301 H. Removal Volumes and Dimensions (if more than 4 impact sites, include a summary table as an attachment) Removal Dimensions Duration of Wetland/Waterbody Name* Material*** Area(sq.ft) Volume(c.y.) Impact** Fanno Creek Removal in Existing Fanno Creek 1780 140 Permanent soil Fanno Creek Removal in Wetland A 40110 8440 Permanent soil Stream B Removal in Wetland A 2120 830 Permanent soil High Flow Channel Removal in Wetland A 190 30 Permanent soil Stream B Removal in Wetland B 2370 330 Permanent soil Stream B Removal in Open Water B 1582 97 Permanent soil Stream B removal in Existing Stream B 306 16 Permanent soil > Stream D Culvert Removal in Existing Stream D 70 10 Permanent soil o Stream D Culvert Removal in Existing Fanno Creek 1090 20 Permanent soil, concrete, and rock fX Bridge Removal and Fill in Wetland A 90 50 Permanent soil and concrete Existing Culvert Removal and Fill in Wetland B 850 40 Permanent soil, concrete, and rock Outfall and Existing Bridge Removal and Fill in Existing Fanno Creek 1598 70 Permanent Wood Soil Lift Toe Wood Removal Wetland A 945 41 Permanent Wood Soil Lift Toe Wood Removal Existing Fanno Creek 1135 50 Permanent Wood I.Total Removal Volumes and Dimensions Removal Impacts to Waters Area(sq.ft) Volume(c.y.) Total Removal to Wetlands 46675 9761 I Total Removal Below Ordinary High Water 7561 403 RECEIVED FILL/ REMOVAL GRADING IMPACT TABLE: MAR 5 2018 Fill Dimensions Wetland/Waterbody Name* Duration of Material*** CITY OF TIGARD Area (sq.ft) Volume(c.y.) Impact** • BUILDING DIVISION Access Road Fill in Wetland A 16860 630 Temporary rock Bridge Removal and Fill in Wetland A 310 20 Permanent soil,concrete,and rock Exisiting Fanno Fill in Wetland A 620 450 Permanent soil New Trail Fill in Wetland A 2170 140 Permanent gravel and asphalt Access Road Fill in Wetland B 1290 50 Temporary rock Fill in Wetland B 310 30 Permanent soil Existing Stream B Fill 490 120 Permanent soil New Trail Fill in Wetland B 1030 60 Permanent gravel and asphalt Existing Culvert Removal and Fill in Wetland B 90 50 Permanent soil - New Trail Fill in Wetland D 910 60 Permanent gravel and asphalt -I Outfall and Existing Bridge Removal and Fill in Existing Fanno Creek 850 40 Permanent rock and soil u Exisiting Fanno Creek Fill 2270 6190 Permanent soil Flood Plain Wood Fill Wetland A 390 17 Permanent Wood Flood Plain Wood Fill Wetland B 30 1 Permanent Wood Soil Lift Toe Wood Fill Wetland A 1598 70 Permanent Wood Stream D Culvert Removal in Existing Stream D 70 40 Permanent rock and soil Stream D Culvert Removal in Existing Fanno Creek 100 50 Permanent rock and soil Soil Lift Toe Wood Fill Existing Fanno Creek 945 41 Permanent Wood G.Total Fill Volumes and Dimensions Fill Impacts to Waters Area(sq.ft) Volume(c.y:) Total Fill to Wetlands 25608 1578 Total Fill Below Ordinary High Water 4555 6301 H. Removal Volumes and Dimensions(if more than 4 impact sites, include a summary table as an attachment) Removal Dimensions Duration of Wetland/Waterbody Name* Area(sq.ft) Volume(c.y.) Impact** Material*** Fauna Creek Removal in Existing Fanno Creek 1780 140 Permanent soil Fanno Creek Removal in Wetland A 40110 8440 Permanent soil Stream B Removal in Wetland A 2120 830 Permanent soil High Flow Channel Removal in Wetland A 190 30 Permanent soil Stream B Removal in Wetland B 2370 330 Permanent soil Stream B Removal in Open Water B 1582 97 Permanent soil Stream B removal in Existing Stream B 306 16 Permanent soil Stream D Culvert Removal in Existing Stream D 70 10 _ Permanent soil 0 Stream D Culvert Removal in Existing Fanno Creek 1090 20 Permanent soil, concrete,and rock tu Bridge Removal and Fill in Wetland A 90 50 Permanent soil and concrete Existing Culvert Removal and Fill in Wetland B 850 40 Permanent soil, concrete, and rock Outfall and Existing Bridge Removal and Fill in Existing Fanno Creek 1598 70 Permanent Wood Soil Lift Toe Wood Removal Wetland A 945 41 Permanent Wood Soil Lift Toe Wood Removal Existing Fanno Creek 1135 50 Permanent Wood I.Total Removal Volumes and Dimensions Removal Impacts to Waters Area(sq.ft) Volume(c.y.) Total Removal to Wetlands 46675 9761 Total Removal Below Ordinary High Water 7561 403 1