Report City of Tigard
IIII ~ COMMUNITY DEVELOPMENT DEPARTMENT
■
T<<,A R D Building Permit Review -- Commercial - With Land Use
Building Permit #: (,P /7--(500S?
Site Address: 13123 Sin/ 1 /7C14") rit vim. Suite/Bldg#: C-7
ivrS
Project Name: (Z.11rer 1-err-aut. r _04
E
(Name of commercial business occupying the space. If vac t,enter S ec Space.) am ,
c/ /,f f7t.1F✓S t=1'.S G' .T4,%c ,e Ir:-
Planning Review ;.�,C- t.%�. c�;4
Proposal: Nem Aew rt-rru n i- (JO me Lt x — l 2- lec. L`I' .Si e._ : ,
,21 Verify site address/suite#exists and active in permit system.
River Terrace Neighborhood: /6 Yes 0 No
)n Land Use Case#: p De Zd 1/O - 0000e, / S D it -7"0 16 - 00005
Wf Plans Match Approved Land Use:
iii Site Plan it Landscape Plan 0 Other:
RD Urban Forestry Plan , Elevation Plan
,Z Building Height: Maximum Height q S Actual Height 30
VConditions Met: 0 Prior to Submittal 0 Prior to Permit Issuance
=Business License:
Exists: 0 Yes 0 No,applicant notified to obtain business license
0 Public Facilities Improvement(PFI)Permit
Required: 0 Yes,applicant was notified 0 No Applied For: 0 Yes 0 No,stop intake
Notes:
Approved by Planning: /110""----:--- R A ocii2 Date: 21 ) S / ( 1
Revisions(afterB lding Submittal only) Reviewer Date
Revision 1: [Approved 0 Not Approved S--Z'I D
Revision 2: 0 Approved 0 Not Approved
Revision 3: 0 Approved 0 Not Approved
Building Permit Submittal
Original Submittal Date: 4/S 1/ 7
Site Plans: #
Building Plans: # 3
Building Permit#: .2 Enter building permit#above.
Workflow Routing: la-Planning [ ngineering [ Permit Coordinator -0-Building
Workflow Sign-off: EiSign-off for Planning(include notes from planning review)
Route Application Documents: Building: original permit application,site plans,building plans,engineer and
beam calculations and trust details,if applicable,etc.
Notes:
By Permit Technician: ( /!_.... Date: c .1--Ar/7
I:\Building\Forms\BldgPermitRvw_COM_WithLandUse_060116.docx
Engineering Review
❑ Slope at building pad: wo
PH Permit#: , , I - // I:+ —
Conditions"Met"prior to issuance of building permit –/i
Easements (encroachments)per engineering conditions of approv. an. plat(not typical on SDR/CUP)
❑ Water Quality/Quantity Facility:
Assess Water Quality Fee in-lieu: 0 Yes 0 No
Assess Water Quantity Fee in-lieu: 0 Yes 0 No
LIDA Facility on lot: 0 Yes 0 No
❑ NOT Approved by Engineering: Date
Notes:
Approved by Engineering: /e'17 Date: _„W:t.
Revisions(after Building Submittal only) Reviewer Date
!, ..- -., 1: '❑ Approved 0 Not Approved
t,I, 'evision 2: 0 Approved 0 Not Approved
l , 4,,4 Revision 3: 0 Approved 0 Not Approved
Permit Coordinator Review
❑ Conditions"Met"prior to issuance of building permit
pproved,NOT Released: Date: �J/ )�
otes:
Revisions(after Building Submittal only)
Revision Notice 1: Date Sent to Applicant:
Revision Notice 2: Date Sent to Applicant
Revision Notice 3: Date Sent to Applicant:
3SDC Fees Entered: Wash Co Trans Dev Tax: es 0 N/A
(( Tigard Trans SDC: es 0 N/A
Parks SDC: Yes 0 N/A
v. OB to Issue Permit
'` Date: 4/jj
4 ' pproved by Permit Coordinator:
t Le
I:\Building\Forms\BldgPeimitRvw_COM_WithLandUse_070915.docx
Letter of Transmittal
RECEIVED
MAY 02 2018
Transmitted By... Date: March 30, 2018 CITY OFTI ct No.: 17857
❑ Mail Project: River Terrace East Cc li + i ms"—IIuilIdiing G
■ Courier BUP2017-00039
❑ Will Call To: Tom Hochstatter- City of Tigard Building Department
❑ Hand Deliver Address: City of Tigard Permit Center
13125 SW Hall Blvd
Tigard, OR 97223
(� a We Are Sending You... Transmitted...
® • Drawings • Prints ■ For Approval
❑ Specifications ■ Plans ❑ As Requested
HatsmiC d�W?i>ar t,r
808 SW 3'd Avenue ❑ Copy of Letter ❑ Samples ❑ For Your Use
Suite 300 ❑ Change Order ❑ Other ❑ For Comment
Portland, OR 97204
Phone(503)287-6825
Fax(503)415-2304
Copies Page No. Description
3 sets Full Size River Terrace East Condominiums—Building
G—REVISED Permit Drawings
2 sets REVISED Structural Calculations River Terrace East
Condominiums—Building G
2 Structural Calculation Revision Memo
1 City of Tigard Revision Transmittal Letter
Items Are...
• Attached ❑ Under Separate Cover via
Remarks
Changes focus around the exterior envelope details and structural materials requested
by the client to align better with their standard project detailing.
From Kevin Janik
CC Project File
Architects Engineers Landscape Architects Planners Surveyors & Mappers Urban Designers
L:\Project\I7800\I7857\ProjectDocs\Permits\Architecture Buildings\Building G - Permit Items\2018 03-28 - 2 -
Revised Permitted Documents\Hochstatter 2018 03-30 TI.docx
FOR OFFICE USE ONLY— SITE ADDRESS: a 9c - ` ?,iG\ky
This form is recognized by most building departments in the Tri-County area for transmitting information.
Please complete this form when submitting information for plan review responses and revisions.
This form and the information it provides helps the review process and response to your project.
a 4�
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
ar
Transmittal Letter
TIGAR D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www..tigard-or.gov
TO: Tom Hochstatter DATE RECEIVED:
DEPT: BUILDING DIVISION
RECEIVED
FROM: Kevin Janik
MAY 02 2018
COMPANY: Otak Architects, Inc!
CITY OF TIGAttD
PHONE: (503) 287-6825 BUILDING DIWII'oNL
RE: East Side of SW Roy, Rogers Road, Tigard, OR BUP2017-00039
(Site Address) (Permit Number)
River Terrace Ea$t Condominiums - Building G
(Project name or subdivision name and lot number)
ATTACHED ARE THE FOLLOWING ITEMS:
Copies: Description: Copies: Description:
Additional set(s) of plans. 3 Revisions: Complete sets full size originals
Cross section(s) and details. Wall bracing and/or lateral analysis.
Floor/roof framing. Basement and retaining walls.
Beam calculations. 2 Engineer's calculations.
2 Other (explain): Structural Memo of Changes
REMARKS: Exterior envelope and structural changes to be more consistent with client
standard detailing.
FOR OFFICE USE ONLY
R d to Permit Technician: Date: G S" ) C.1 Initials:
Fees Due. Yes No Fee Description: Amount Due:
07. 4-1r �l�v, rcv,cu $ 1 gc
Special
Instructions:
Reprint Permit (per PE): Yes "1No Done
Applicant Notified: 7'O/t) Date: Initials: r •m
L\Building\Forms\TransmittalLetter-Revisions.doc 05/25/2012