Loading...
Report City of Tigard IIII ~ COMMUNITY DEVELOPMENT DEPARTMENT ■ T<<,A R D Building Permit Review -- Commercial - With Land Use Building Permit #: (,P /7--(500S? Site Address: 13123 Sin/ 1 /7C14") rit vim. Suite/Bldg#: C-7 ivrS Project Name: (Z.11rer 1-err-aut. r _04 E (Name of commercial business occupying the space. If vac t,enter S ec Space.) am , c/ /,f f7t.1F✓S t=1'.S G' .T4,%c ,e Ir:- Planning Review ;.�,C- t.%�. c�;4 Proposal: Nem Aew rt-rru n i- (JO me Lt x — l 2- lec. L`I' .Si e._ : , ,21 Verify site address/suite#exists and active in permit system. River Terrace Neighborhood: /6 Yes 0 No )n Land Use Case#: p De Zd 1/O - 0000e, / S D it -7"0 16 - 00005 Wf Plans Match Approved Land Use: iii Site Plan it Landscape Plan 0 Other: RD Urban Forestry Plan , Elevation Plan ,Z Building Height: Maximum Height q S Actual Height 30 VConditions Met: 0 Prior to Submittal 0 Prior to Permit Issuance =Business License: Exists: 0 Yes 0 No,applicant notified to obtain business license 0 Public Facilities Improvement(PFI)Permit Required: 0 Yes,applicant was notified 0 No Applied For: 0 Yes 0 No,stop intake Notes: Approved by Planning: /110""----:--- R A ocii2 Date: 21 ) S / ( 1 Revisions(afterB lding Submittal only) Reviewer Date Revision 1: [Approved 0 Not Approved S--Z'I D Revision 2: 0 Approved 0 Not Approved Revision 3: 0 Approved 0 Not Approved Building Permit Submittal Original Submittal Date: 4/S 1/ 7 Site Plans: # Building Plans: # 3 Building Permit#: .2 Enter building permit#above. Workflow Routing: la-Planning [ ngineering [ Permit Coordinator -0-Building Workflow Sign-off: EiSign-off for Planning(include notes from planning review) Route Application Documents: Building: original permit application,site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: ( /!_.... Date: c .1--Ar/7 I:\Building\Forms\BldgPermitRvw_COM_WithLandUse_060116.docx Engineering Review ❑ Slope at building pad: wo PH Permit#: , , I - // I:+ — Conditions"Met"prior to issuance of building permit –/i Easements (encroachments)per engineering conditions of approv. an. plat(not typical on SDR/CUP) ❑ Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: 0 Yes 0 No Assess Water Quantity Fee in-lieu: 0 Yes 0 No LIDA Facility on lot: 0 Yes 0 No ❑ NOT Approved by Engineering: Date Notes: Approved by Engineering: /e'17 Date: _„W:t. Revisions(after Building Submittal only) Reviewer Date !, ..- -., 1: '❑ Approved 0 Not Approved t,I, 'evision 2: 0 Approved 0 Not Approved l , 4,,4 Revision 3: 0 Approved 0 Not Approved Permit Coordinator Review ❑ Conditions"Met"prior to issuance of building permit pproved,NOT Released: Date: �J/ )� otes: Revisions(after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant Revision Notice 3: Date Sent to Applicant: 3SDC Fees Entered: Wash Co Trans Dev Tax: es 0 N/A (( Tigard Trans SDC: es 0 N/A Parks SDC: Yes 0 N/A v. OB to Issue Permit '` Date: 4/jj 4 ' pproved by Permit Coordinator: t Le I:\Building\Forms\BldgPeimitRvw_COM_WithLandUse_070915.docx Letter of Transmittal RECEIVED MAY 02 2018 Transmitted By... Date: March 30, 2018 CITY OFTI ct No.: 17857 ❑ Mail Project: River Terrace East Cc li + i ms"—IIuilIdiing G ■ Courier BUP2017-00039 ❑ Will Call To: Tom Hochstatter- City of Tigard Building Department ❑ Hand Deliver Address: City of Tigard Permit Center 13125 SW Hall Blvd Tigard, OR 97223 (� a We Are Sending You... Transmitted... ® • Drawings • Prints ■ For Approval ❑ Specifications ■ Plans ❑ As Requested HatsmiC d�W?i>ar t,r 808 SW 3'd Avenue ❑ Copy of Letter ❑ Samples ❑ For Your Use Suite 300 ❑ Change Order ❑ Other ❑ For Comment Portland, OR 97204 Phone(503)287-6825 Fax(503)415-2304 Copies Page No. Description 3 sets Full Size River Terrace East Condominiums—Building G—REVISED Permit Drawings 2 sets REVISED Structural Calculations River Terrace East Condominiums—Building G 2 Structural Calculation Revision Memo 1 City of Tigard Revision Transmittal Letter Items Are... • Attached ❑ Under Separate Cover via Remarks Changes focus around the exterior envelope details and structural materials requested by the client to align better with their standard project detailing. From Kevin Janik CC Project File Architects Engineers Landscape Architects Planners Surveyors & Mappers Urban Designers L:\Project\I7800\I7857\ProjectDocs\Permits\Architecture Buildings\Building G - Permit Items\2018 03-28 - 2 - Revised Permitted Documents\Hochstatter 2018 03-30 TI.docx FOR OFFICE USE ONLY— SITE ADDRESS: a 9c - ` ?,iG\ky This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. a 4� City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT ar Transmittal Letter TIGAR D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www..tigard-or.gov TO: Tom Hochstatter DATE RECEIVED: DEPT: BUILDING DIVISION RECEIVED FROM: Kevin Janik MAY 02 2018 COMPANY: Otak Architects, Inc! CITY OF TIGAttD PHONE: (503) 287-6825 BUILDING DIWII'oNL RE: East Side of SW Roy, Rogers Road, Tigard, OR BUP2017-00039 (Site Address) (Permit Number) River Terrace Ea$t Condominiums - Building G (Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: Copies: Description: Copies: Description: Additional set(s) of plans. 3 Revisions: Complete sets full size originals Cross section(s) and details. Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculations. 2 Engineer's calculations. 2 Other (explain): Structural Memo of Changes REMARKS: Exterior envelope and structural changes to be more consistent with client standard detailing. FOR OFFICE USE ONLY R d to Permit Technician: Date: G S" ) C.1 Initials: Fees Due. Yes No Fee Description: Amount Due: 07. 4-1r �l�v, rcv,cu $ 1 gc Special Instructions: Reprint Permit (per PE): Yes "1No Done Applicant Notified: 7'O/t) Date: Initials: r •m L\Building\Forms\TransmittalLetter-Revisions.doc 05/25/2012