Report A RECEIVED
MAY 0 2 2018
CITY OF TIGARD
F R O E L I C H BUILDING DIVISION
ENSI N EERSA Memorandum
Client: OTAK
Job Name: River Terrace East Condominiums
FE Job#: 17-T174
Date: March 8, 2018
To: Kevin Janik
From: Ben Hawken, El; Chris Nelson, PE
Re: Hem-fir Framing Revisions
Froelich Engineers (FE)has made revisions to the River Terrace East Condominiums at the request of
Polygon Homes. FE is providing revised plans and calculations for the city to review. Summary of
changes which affect all building types are below:
1. Changing Doug-Fir lumber to Hem-Fir for all 2x joists, columns, 2x studs and plates.
2. Doug-Fir#1 beams revised to be Doug-Fir#2.
3. 7/8"floor sheathing revised to be 3/4".
4. 5/8" roof sheathing revised to be 7/16".
5. 15/32"wall sheathing revised to be 7/16".
6. Weyerhaeuser TJI joists revised to be Roseburg RFPI-400 joists.
7. Glulam drag beams revised to be LVL material, drag nailing revised accordingly.
Other changes made to the plans result due to the changes listed above (shear walls, holdowns, etc.).
If you have any questions, please do not hesitate to call.
Sincerely,
Ben Hawken, El
Cc: File
Attachments: None
www.froelich-enjineers.com
O MAIN OFFICE 17700 SW Upper Boones Ferry Rd.Suite 115 Portland, Oregon 97224 503-624-7005
❑ CENTRAL OREGON 745 NW Mt.Washington Dr.,Suite#204 Bend, Oregon 97703 541-383-1828
O DENVER OFFICE 940 Kimbark St.,Suite#3 Longmont,Colorado 80501 720-799-1001
RE
Letter of Transmittal MAY 0 2 2018
CITY OF TIGARD
Transmitted By... Date: March 28, 2018 BUILDING DIMitiSF No.: 17857
❑ Mail Project: River Terrace East Condominiums—Building E
■ Courier BUP2017-00021
❑ Will Call To: Tom Hochstatter- City of Tigard Building Department
❑ Hand Deliver Address: City of Tigard Permit Center
13125 SW Hall Blvd
Tigard, OR 97223
o a We Are Sending You... Transmitted...
■ Drawings ■ Prints ■ For Approval
❑ Specifications IN Plans 0 As Requested
808 Sir Avenue 0 Copy of Letter ❑ Samples 0 For Your Use
Suite 300
0 Change Order ❑ Other 0 For Comment
Portland,OR 97204
Phone(503)287-6825
Fax(503)415-2304
Copies Page No. Description
3 sets Full Size River Terrace East Condominiums-Building
E-REVISED Permit Drawings
2 sets REVISED Structural Calculations River Terrace East
Condominiums-Building E
2 Structural Calculation Revision Memo
1 City of Tigard Revision Transmittal Letter
Items Are...
• ■ Attached ❑ Under Separate Cover via
Remarks
Changes focus around the exterior envelope details and structural materials requested
by the client to align better with their standard project detailing.
From Kevin Janik
CC Project File
Architects Engineers Landscape Architects Planners Surveyors & Mappers Urban Designers
L:\Project117800\178.57\ProjectDocs\Permits\Architecture Buildings\Building E - Permit Items\2018 03-28 - 2 -
Revised Permitted Documents\Hochstatter 2018 03-28 TI.docx
City of Tigard
i
COMMUNITY DEVFT,OPMENT DEPARTMENT
1_ G h D Building Permit Review — Commercial - With Land Use
Building Permit #: �.,.L.P�a t ?-000 a-4
Site Address: 1 ? 27 ! I Lo 1 4t) Suite/Bldg#: E
Project Name: (Zi't r Te rrc,u. J2` --S (Ai r t d )
(Name of commercial business occupying the space. If vacant,en�2Space.)
� Af-/
/2.67-vis e-2, `1/.� /NC-- (
PlanningReview r i,ce:ze
Proposal: ( W4' T-r -v,%.82._ MvIi-i - GBimiIy
0 Verify site address/suite#exists and active in permit system.
te River Terrace Neighborhood: It Yes 0 No
' Land Use Case#: PPR201( — 0O00S SDRZolb - OOOOS
APlans Match Approved Land Use:
eZr Site Plan N�"❑ Landscape Plan 0 Other:
e Urban Forestry Plan Ia'Elevation Plan
,Ja'Building Height: Maximum Height Ric Actual Height 3 G, 5—
zr Conditions Met: 0 Prior to Submittal ❑ Prior to Permit Issuance
pecu/ t a S''.4t WOr►t.
,.Iusiness License: ✓h vvi . Cevtii I
Exists: ❑ Yes 0 No,applicant notified to obtain business license
Public Facilities Improvement(PFI)Permit:
Required: 0 Yes,applicant was notified 0 No Applied For: Yes 0 No,stop intake
Notes: CA Ad.:et b nS OUtS-- viS:+1y
Sit Work. rer'"' ao+ he isst,e.1 until vond.ilibn, me 4-
Approved by Planning: G Date: J-ll 77
Revisions (after Bujlding Submittal only) R viewer Date
Revision 1: ECI roved 0 Not Approved s--7-67
$7
Revision 2: 0 Approved ❑ Not Approved
Revision 3: 0 Approved 0 Not Approved
Building Permit Submittal
Original Submittal Date: //3/ f/7
Site Plans: # 3
Building Plans: #
Building Permit#: 2'Enter building permit#above.
Workflow Routing: Q'Planning [ Engineering hermit Coordinator ..12—wilding
Workflow Sign-off: Cr Sign-off for Planning(include notes from planning review)
Route Application Documents: [Building: original permit application, site plans,building plans,engineer and
beam calculations and trust details,if applicable,etc.
Notes:
By Permit Technician: ( IIIIII) ozDate: /4/7
I:\Building\Forms\BldgPeimitRvw_COM_WithLandUse 060116.docx
Sneering Review
6."Slope at building pad:
/ ope
PFI Permit#:conditions "Met"prior to issuance of building permit /very-
❑ Easements (encroachments)per engineering conditions of approval and plat not ical on SDR/CUP)
❑ Water Quality/Quantity Facility:
Assess Water Quality Fee in-lieu: 0 Yes 0 No
Assess Water Quantity Fee in-lieu: 0 Yes 0 No
LIDA Facility on lot: 0 Yes 0 No
0 NOT Approved by Engineering: Date
Notes:
Approved by Engineering: tilil Date: Z--��7
Revisions (after Building Submittal only) Reviewer Date
1 Revision 1: 0 Approved 0 Not Approved
Revision 2: 0 Approved 0 Not Approved
Revision 3: 0 Approved 0 Not Approved
Permit Coordinator Review
❑ Conditions "Met"prior to issuance of building permit
pproved,NOT Released: *7/Date:PI/AZ--
Revisions
Notes: p�I '(after Building Submittal only)
Revision Notice 1: Date Sent to Applicant
Revision Notice 2: Date Sent to Applicant
Revision Notice 3: Date Sent to Applicant:
JSDC Fees Entered: Wash Co Trans Dev Tax: es 0 N/A
Tigard Trans SDC: Yes 0 N/A
Parks SDC: Yd Yes 0 N/A
OK to Issue Permit /
Jill- :pproved by Permit Coordinator: Date: 4//° 1 8
re
1:\Building\Foams\BldgPennitRvw_COM_WithlandUse 070915.docx
1
X31 ttc� arz.
FOR OFFICE USE ONLY—SITE ADDRESS: 1C.INZN9E—
This form is recognized by most building departments in the Tri-County area for transmitting information.
Please complete this form when submitting information for plan review responses and revisions.
This form and the information it provides helps the review process and response to your project.
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
Transmittal Letter
'1'IGA\Ra 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
TO: Tom Hochstatter DATE
V ED
DEPT: BUILDING DIVISION
MAY 022018
FROM: Kevin Janik CITY OF TIGARD
COMPANY: Otak Architects, Inc. !UILDING DIVISION
PHONE: (503) 287-6825 By:"1/V
RE: East Side of SW Roy, Rogers Road, Tigard, OR BUP2017-00021
(Site Address) (Permit Number)
River Terrace East Condominiums - Building E
(Project name or subdivision name and lot number)
ATTACHED ARE THE FOLLOWING ITEMS:
Copies: Description: Copies: Description:
Additional set(s) of plans. 3 Revisions: Complete sets full size originals
Cross section(s) and details. Wall bracing and/or lateral analysis.
Floor/roof framing. Basement and retaining walls.
Beam calculations. 2 Engineer's calculations.
2 Other(explain): Structural Memo of Changes
REMARKS: Exterior envelope and structural changes to be more consistent with client
standard detailing.
FOR OFFICE USE ONLY
Routed to Permit Technician: Date: Initials:
Fees Due: Yes ❑No Fee Description: Amount Due:
Special
Instructions:
Reprint Permit (per PE): ( I Yes X No I I Done
Applicant Notified: j t--) Date: C, /` J� Initials:
''17i ic_— /
1.\Building\Forms\TransmittalLetter-Revisions.doc 05/25/2012