Loading...
Permit (34) CITY OF TIGARD • BUILDING PERMIT s COMMUNITY DEVELOPMENT Permit#: BUP2018-00147 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 05/10/2018 Parcel: 1 S 126CA00200 Jurisdiction: Tigard Site address: 9285 SW GREENBURG RD Project: Jemma Co Subdivision: None Lot: None Project Description: Landlord work for existing tenant:Framing for(4)bathrooms. Contractor: OWNER Owner: LINDQUIST DEVELOPMENT CO INC LINDQUIST DEVELOPMENT CO INC PO BOX 42135 PO BOX 42135 PORTLAND, OR 97242 PORTLAND, OR 97242 PHONE: 503-227-8275 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: IIIB Permit Fee-Additions,Alterations, 05/10/2018 $104.12 Occupancy Grp: B Occupancy Load: 336 Demolition 12/o State Surcharge-Building 05/10/2018 $12.49 Dwelling Units: Plan Review 05/10/2018 $67.68 Stories: Height: ft Plan Review-Fire Life Safety 05/10/2018 $41.65 Bedrooms: Bathrooms: Info Process/Archiving-Sm$0.50(up to 05/10/2018 $1.50 Value: $2,000 11x17) Floor Areas: Total Area: Accessory Struct: Basement: Carport: Covered Porch: Deck: Garage: Mezzanine: Total $227.44 Required: Required Items and Reports(Conditions) Fire Sprinkler: No Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: .nature: ' ' 3.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. r Building Permit Application Commercial RE1 CEIV iolz orrlct: ls1:0\1.1 City of Tigard Received sr Date/B :+ �'ll� Permit No.: g ,t . . ; I 1,1 • 13125 SW Hall Blvd.,Tigard,OR 97223 1`� A� '- tt�� Plan Review Phone: 503-718-2439 Fax: 503-598-1960 MAY U 1JO Related Permit: r Date/B r , i�'/ .y T1 C A R n Inspection Line: 503-639-4175 r -Ready/By: - - n See Page 2 for Internet: www.tigard-or.gov CITY , 1 tq.ified/Method: J(; �>{�i��(��x��� � j, *JAMSupplemental Information TYPE OF WOR J JLD "DIVISION Gt - REQUIRED DATA:1-AND 2-FAMILY DWELLING KNew construction 0 Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1-and 2-family dwelling ,Commercial/industrial Valuation: $ ❑Accessory building 0 Multi-family Number of bedrooms: ❑Master builder 0 Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATIONTotal number of floors: Job site address:ea 241-- 6n4_,,� v <i 4. Q if New dwelling area: square feet City/State/ZIP: '7 , at ,_ Garage/carport area: square feet Suite/bldg./apt.#:/ �` G.f Project name: � Covered porch area: square feet Cross street/directions to job site: / Deck area: square feet 0 .4.41/ q- 1 �I �/a,-19 Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot#: Permit fees*are based on the value of the work performed. Tax map/parcel#: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. 1/1c. /4 it 4 .*h4o'/- `i Valuation: $�Ca9 44; Existing building area:2 ') square feet New building area: 2_2,90 d square feet PROPERTY OWNER 0 TENANT Number of stories: Name: L,,, ,..,,,,,t h cv._/f ,,,j-- ) 144 Type of construction: Address: f) c�/ Li) I. Occupancy groups: City/State/ZIP: p d4,D 0)4_ 7).-1 �---, Existing: Phone:(s 0-2) 2,a-Z4?22J' Fax:( l3) >4_'70',--1 0 New: 0 APPLICANT 0 CONTACT PERSON BUILDING PERMIT FEES* Business name: C flfrve J C9,1,4—. (Please refer to fee schedule) t7 Structural plan review fee(or deposit): Contact name: Address: FLS plan review fee(if applicable): City/State/ZIP: Total fees due upon application: Phone:( ) Fax::( ) Amount received: E-mail PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* CONTRACTOR Commercial and residential prescriptive installation of f roof-top mounted Photo Voltaic Solar Panel System. Business name: �j] 0 ( 4r� Submit two(2)sets of roof plan with connection details • I eltei and fire department access,along with the 2010 Oregon Address: Solar Installation Specialty Code checklist. City/State/ZIP: Permit fee(includes plan review $180.00 and administrative fees): Phone:( ) Fax:( ) State surcharge(12%of permit fee): $21.60 CCB Lic.: Total fee due upon application: $201.60 Authorized signature: This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name: Iii „3 u I v/� / Le/ Date:S'. ` �j r� * Fee methodology set by Tri-County Building Industry C.1"7f7 © Service Board. - L �s�s . t.L i,) I:\Building\Permits\BUP_COM_PermitApp.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB) ,„pil . City of Tigard • BUILDING DIVISION Over-The-Counter (OTC) Building & Fire Protection System Permit T I(,A i.F) Appointment Checklist Permit Record#: OA)t 8r-00147 Contact Name: 5 .ar f 1-. 1,,' Phone #: j3id-o-01410 si Business Name: 4rjnia(rdc- /I,SI- vel,r� Cc). Appt. Date/Time: .�jiii/lg ji),cso Site Address: /,2e- ores ,41 Bldg/Suite #: Project Name: 4u Le New Tenant? 0 Yes ,,kr No Project Description: T.2' . e.k,-&-1.,k,v) s -a Tr ,pvy 61 4471-,,&4"-\/ Existing Use: iti—) New Use: (? MMD Required: 0 Yes No Related Record#: APPLICATION SPECIFIC INN:MA/0I0N GENERAL INFORMATION Class of Work: Ay�J T Occupancy Group: _ f3 Type of Construction: l 1)) Type of Use: ,U Occupancy Load: ,/,.1-C Oregon Specialty Code: 1 ,o 1 SPECIFICS Number of Stories: J Building Height: Mixed Use: Number of Dw Units: Number of Bathrooms: Number of Bedrooms: BUILDING SQ FT-SCHOOL CET OTHER SQUARE FOOTAGES Story Square Footage: Accessory Structure: Covered Porch: Basement: Garage: Deck: Total Square Footage: Carport: Mezzanine: SETBACKS Sideyard Setback—Left Sideyard Setback—Front Sideyard Setback—Right Sideyard Setback—Back CONSTRUCTION Exterior Walls: Openings Protected: Firewall Separation: N: S: N: S: Occupancy Separation: E: W: E: W: Access.Parking Spaces: REQUIRED ITEMS Fire Sprinklers: f O Fire Alarms: Smoke Detectors: Sprinkler Type: Alarm Type: Protected Corridors: Standpipe Required: Pull Stations Required: Parapet: Hazard Group: Battery Calcs Provided: Density: Cut Sheets Provided: Design Area: K Factor: Total Project Valuation: $ a 00 0 �. � 4 'ZS'-- DC Prov Rvw,COM TI—Ping $ joy. j) Permit Fee—Add,Alt,Demo DC Provision Review Fee for COM TI(effective 7/1/2017) $ ) a , 4 9 12%State Surcharge Project Valuation $ a, 7, 6 ft, Plan Review,Structural Up to$4,999 $0.00 $5,000-$74,999 $ 1 I. C Plan Review,Fire Life Safety $91.00 $ Info Proc/Arch,Lg(over 11x17$2.00) $75,000-$149,999 $226.00 $ ) • r O Info Proc/Arch,Sm(up to 11x17$0.50) $150,000 and over $361.00 $ Metro Construction Excise Tax $ School Construction Excise Tax $ Hourly Rate Fee $ Hourly Rate State Surcharge $ Misc.Admin Fee $ Other: Building Staff: $ Other: Date/Time: $acl.-7. t).(l„TOT' ' FEES DUE I:\Building\Forms\OTC_BUP_FPS_070117.docx r City of Tigard • COMMUNITY DEVELOPMENT-DEPARTMENT " Plan Submittal Requirements Commercial & Multi-Family - New, Additions or Alterations T I GA R D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov 1. SITE PLAN (3) copies - fully dimensional, drawn to scale and labeled with: A. ❑ map&tax lot# ❑ project name ❑ site address 0 suite number ❑ zoning ❑ applicant name ❑ phone number B. North arrow. C. Scale (architectural or engineering only). D. Street names. E. Setbacks. F. Parking,including disabled access. G. Finished floor elevations. 2. EROSION CONTROL PLANS AND DETAILS. 3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of plans required based on submittal type (no redlines or tape-ons accepted). All details listed below shall be incorporated into the plans: A. Scale (architectural or engineering only). B. Foundation plan. C. Floor plan(s). D. Cross sections. E. Reflective ceiling plan. F. Seismic bracing detail for suspended ceiling. G. Roof plan. H. Exterior elevations. I. Structural calculations,plans, details and specifications. J. Accessibility barrier removal worksheet. K. Deposit-based on valuation of project. 4. ADDITIONAL INFORMATION AS FOLLOWS: A. Fire Department Building Survey with (1) additional full set of architecture drawings. I:\Building\Permits\BUP_COM_PemiltApp.doc Rev.12/18/2014 V a City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT, 1111 m p Accessibility: Barrier Removal Improvement Plan Commercial & Multi-Family - Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov REQUIREMENT: OREGON REVISED STATUTE (ORS)447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five percent(25%). VALUATION: Total of all renovation,alteration or modification being done, ie . excluding painting and wallpapering: [1] $ . ..(.9 00 MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line [2] of Valuation Computation): $ I:\Building\Permits\BUP_COM_PermitApp.doc Rev.12/18/2014 City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT, _ Plan Submittal Requirements Matrix Commercial & Multi-Family - New, Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov Type of Submittal # of Plans (Includes new,additions and alterations) Required at Submittal Demolition Permit 2 (site plan is required showing location and square footage of all buildings to be demolished,erosion control plan and tree protection,if applicable) Site Work 3 (must include location of all accessible parking) Plumbing (site utilities) 2 Building 3 Fire Protection System 3 Mechanical 2 Plumbing (building fixtures) 2 Electrical 2 Solar Photovoltaic 2 (Requires check list for prescriptive installation. If not prescriptive installation,engineering is required.) Plan review is dependent upon submittal of a completed application and plans. After plan review approval, the Plans Examiner will contact the applicant to request additional sets of plans for distribution purposes (for contractor, City of Tigard,Washington County, and Tualatin Valley Fire&Rescue),if applicable. I:\Building\Permits\BUP_COM_PermitApp.doc Rev.12/18/2014 A Branden Taggart From: Brandon Cooke <bcooke@rosewd.com> Sent: Friday, April 27, 2018 12:52 PM To: Branden Taggart;#Building Permit Technicians Cc: Dale Beggs Subject: RE: Extra Space Storage Site Utilities Permit: PLM2018-00139; 11123 SW 68th Pkwy Here is the contractor's license information. Perlo CCB 189245 From: Brandon Cooke Sent: Friday, April 13, 2018 5:32 PM To: 'Branden Taggart'<brandent@tigard-or.gov>; #Building Permit Technicians<TigardBuildingPermits@tigard-or.gov> Cc: Dale Beggs<dbeggs@cocommercial.net> Subject: RE: Extra Space Storage Site Utilities Permit: PLM2018-00139; 11123 SW 68th Pkwy Branden, The balance has been paid online. I have attached the receipt for your reference. I will provide the contractor's license information ASAP. Thank you, ROSEWOOD mxwmineYeteffirla PROPERTY COMPANY Brandon Cooke Acquisitions Manager 2101 Cedar Springs Road, Suite 1600, Dallas, TX 75201 214-849-9041 direct&fax 1512-750-4552 cell bcookeCc�rosewd.com email http://rosewood property.com/website http://rosewd.com/website This e-mail(including attachments)is covered by the Electronic Communications Privacy Act, 18 U.S.C. §§2510-2512, is confidential and may be legally privileged. If you are not the intended recipient,you are hereby notified that any retention,dissemination,distribution or copying of this communication is strictly prohibited. If you have received this communication in error, please immediately notify us by telephone. This communication is for informational purposes only. From: Branden Taggart [mailto:brandent@tigard-or.gov] Sent: Friday,April 06, 2018 1:18 PM To: Brandon Cooke<bcooke@rosewd.com> Cc:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov> Subject: Extra Space Storage Site Utilities Permit: PLM2018-00139; 11123 SW 68th Pkwy Hi Brandon, 1 . ~ ' Your site utilities permit for Extra Space Storage (RPC Tigard Storage) is ready to issue. The balance due is$976.71, and thepennitfeescanbepaidon|inenuwathttps://aca.acce|a.com/OGAKD/ . fault.aspxorinpersonbetxveenthehoum of 8:00 a.m. and 4:30 p.m., Monday through Thursday. We are closed on Fridays. |fyou pay online, please notifvusat tiAardbui|dingpernnits��tiRand'or�gov. ' Also we will need your contractor's license information prior to issuing this permit. If you have any questions, please let me know. Thanks, Bramden Taggart Ph City oTigard / M�emhmrPormit Technician Community Development ------ 15125 SW Flail Blvd Tigard,OR (503)718-2449 DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail may bedisclosed toanother pa� � Law. E-mailsame `=teined by the City of Tigard in compliance with the Oregon Administrative Rules "City General Records Retention Schedule."' i II Rh City of Tigard w COMMUNITY DEVELOPMENT DEPARTMENT T 1 G A RD Building Permit Review — Commercial - No Land Use Building Permit #: ,5,1/901 r--cc i u 7 Site Address: Cl 2 S Swi (cev'1 cj U rr& (''L Suite/Bldg#: Project Name: (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: I:MITI I I Li b li-VVI vrUOrrl S Existing Business Activity: il 0 Gil ti r)ey—J Proposed Business Activity: y Verify site address/suite#exists and active in permit system. River Terrace Neighborhood: ❑ Yes ❑ No YJ Zoning: !VW(: yiPermitted Use: Yes 10No CISpec Space yr'Confirm no land use required. Business License: Exists: ❑ Yes ❑ No,applicant notified to obtain business license Notes: Approved by Planning: 40' ` Date: Si / 0/ / Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: El Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: 61/0 /t Site Plans: # ,14' Building Plans: ## Building Permit#: r building— permit#above. Workflow Routing: Planning ❑ Permit Coordinator ding Workflow Sign-off: g•-511-off for Planning(include notes from planning review) Route Application Documents: Building. original permit application,site plans,building plans, engineer and beam calculations and trust details,if applicable, etc. Notes:'` 171P By Permit Technician: ---;, , ' Date: ;j//tfi e');•;'- I:\Building\Forms\BldgPennitRvw 'yI:\Building\Forms\B1dgPermitRvw COM NoLandUse 060116.docx Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit O Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: ❑ SDC Fees Entered: Wash Co Trans Dev Tax: 0 Yes 0 N/A Tigard Trans SDC: 0 Yes 0 N/A Parks SDC: 0 Yes 0 N/A ❑ OK to Issue Permit Approved by Permit Coordinator: Date: I:\Building\Forms\BldgPermitRvw_COM NorandUse_070915.docx