Loading...
Plans • RECEIVED MA 2 3 201`( Srdan Radanovic (owner) an OF TIGARD 9225 SW Oak Street ` UILPING DIVISION Tigard OR 97223 Summary of Work Performed 1. Moving Existing washer and dryer to garage and adding a Full Bathroom in the existing space (see attached diagram). • Install 3 inch main sewer line (from garage to corner bedroom). • Attach washer and laundry sink located in garage to main sewer line. • Install new dryer vent going horizontal through the roof outside. • Move existing toilet in master bath next to bathroom entry door(see diagram). • Build a partition wall (34 inch) between the master bath toilet and the new bathroom, this area will be the new stand up shower(see diagram). • Install a 50 CFM fan in the new bathroom. • Install a toilet in the new bathroom. • Install a sink in the new bathroom. • Frame front of new bathroom (hallway side) and install a new barn style sliding door. • Tile new stand up shower and connect to main water line with pex pipes. • All new fixtures (toilet, sink and shower) will attach to the new 3 inch main sewer line. • Pipe vents installed as needed. • New electrical circuit to the main panel with gfci outlet and two light fixtures (shower and above sink). 2. Convert Den into additional bedroom (see attached diagram). • Replace window to meet a� 44 inch height from the floor and a minimum 24 inch height and 20 inch width opening. • Install new smoke detector. • Reroute air return to the main living room. • Install wall partition between the living room and den (see diagram) and install barn style sliding door. 3. Install electrical Heat Pump mini split system (air conditioning and heating). 5'RP.4.v P 4-P,4,va U,e 4/15/2018 'el elimage(800x427) 0.ei iVE W PLA/U 77 4-e p off. '7'4Z23 RECE VEDi `? G CITY D ,, E , e....,\,..,''''.,, ,,: ,e;,-,H i,,.;,., 00c2.., i "fib z 15b'24i kic 11 kk, ROOM f ,. A-i r3263C's1 CWS If"l� . =5 k `1tiP '-,.„;.:,-, V3 X[i i CLo3eT :1,...„;', .W.,. .14.4.4 1 xqa c'1° mow: °fir"` A— G arag..t: z ;'21,:...'''': •..;,yam(,^,��, ), VIPPIIIIIIII T LSLa�1Ckf7 �,s e3�f �..' A ,, .. 'C"' 33 3'4' tt , . Ar ._.. - ''' i `, 3 1`i'C i 1 M , ,. !,.., ‘....f ,,a4,,,,,, ,,, r Apt► '''''''-,,l',1'.... !'el t Vher L., a , yf *, !r ;. https://media.roomsketcher.corn/levelimage/?pid=11847823 id=7020038&ts=20180415212753 111 RECEIVED MAS` 2 1[11 Srdan Radanovic (owner) an OF TIGARD 9225 SW Oak Street U1LD G DIVISION Tigard OR 97223 Summary of Work Performed 1. Moving Existing washer and dryer to garage and adding a Full Bathroom in the existing space (see attached diagram). • Install 3 inch main sewer line (from garage to corner bedroom). • Attach washer and laundry sink located in garage to main sewer line. • Install new dryer vent going horizontal through the roof outside. • Move existing toilet in master bath next to bathroom entry door(see diagram). • Build a partition wall (34 inch) between the master bath toilet and the new bathroom, this area will be the new stand up shower(see diagram). • Install a 50 CFM fan in the new bathroom. • Install a toilet in the new bathroom. • Install a sink in the new bathroom. • Frame front of new bathroom (hallway side) and install a new barn style sliding door. • Tile new stand up shower and connect to main water line with pex pipes. • All new fixtures (toilet, sink and shower) will attach to the new 3 inch main sewer line. • Pipe vents installed as needed. • New electrical circuit to the main panel with gfci outlet and two light fixtures (shower and above sink). 2. Convert Den into additional bedroom (see attached diagram). YVNASithANIA • Replace window to meet a. n 44 inch height from the floor and a minimum 24 inch height and 20 inch width opening. • Install new smoke detector. • Reroute air return to the main living room. • Install wall partition between the living room and den (see diagram) and install barn style sliding door. 3. Install electrical Heat Pump mini split system (air conditioning and heating).