Summary of Work Performed
1. Moving Existing washer and dryer to garage and adding a Full Bathroom in the existing
space (see attached diagram).
• Install 3 inch main sewer line (from garage to corner bedroom).
• Attach washer and laundry sink located in garage to main sewer line.
• Install new dryer vent going horizontal through the roof outside.
• Move existing toilet in master bath next to bathroom entry door(see diagram).
• Build a partition wall (34 inch) between the master bath toilet and the new bathroom,
this area will be the new stand up shower(see diagram).
• Install a 50 CFM fan in the new bathroom.
• Install a toilet in the new bathroom.
• Install a sink in the new bathroom.
• Frame front of new bathroom (hallway side) and install a new barn style sliding door.
• Tile new stand up shower and connect to main water line with pex pipes.
• All new fixtures (toilet, sink and shower) will attach to the new 3 inch main sewer line.
• Pipe vents installed as needed.
• New electrical circuit to the main panel with gfci outlet and two light fixtures (shower
and above sink).
2. Convert Den into additional bedroom (see attached diagram).
• Replace window to meet a� 44 inch height from the floor and a minimum 24
inch height and 20 inch width opening.
• Install new smoke detector.
• Reroute air return to the main living room.
• Install wall partition between the living room and den (see diagram) and install barn style
sliding door.
3. Install electrical Heat Pump mini split system (air conditioning and heating).
5'RP.4.v P 4-P,4,va U,e
4/15/2018 'el elimage(800x427) 0.ei
iVE W PLA/U 77 4-e p off. '7'4Z23
RECE VEDi
`?
G CITY D
,, E , e....,\,..,''''.,, ,,: ,e;,-,H i,,.;,., 00c2.., i
"fib
z
15b'24i kic 11 kk,
ROOM
f ,. A-i r3263C's1
CWS
If"l� . =5 k `1tiP
'-,.„;.:,-, V3 X[i i
CLo3eT
:1,...„;', .W.,. .14.4.4 1 xqa c'1° mow: °fir"` A— G arag..t:
z
;'21,:...'''':
•..;,yam(,^,��,
), VIPPIIIIIIII
T LSLa�1Ckf7 �,s e3�f �..' A ,,
.. 'C"'
33 3'4' tt , . Ar
._.. -
'''
i `, 3 1`i'C i 1 M
, ,.
!,.., ‘....f ,,a4,,,,,, ,,,
r Apt► '''''''-,,l',1'.... !'el
t
Vher L., a ,
yf
*, !r ;.
https://media.roomsketcher.corn/levelimage/?pid=11847823 id=7020038&ts=20180415212753 111
RECEIVED
MAS` 2 1[11
Srdan Radanovic (owner)
an OF TIGARD 9225 SW Oak Street
U1LD G DIVISION Tigard OR 97223
Summary of Work Performed
1. Moving Existing washer and dryer to garage and adding a Full Bathroom in the existing
space (see attached diagram).
• Install 3 inch main sewer line (from garage to corner bedroom).
• Attach washer and laundry sink located in garage to main sewer line.
• Install new dryer vent going horizontal through the roof outside.
• Move existing toilet in master bath next to bathroom entry door(see diagram).
• Build a partition wall (34 inch) between the master bath toilet and the new bathroom,
this area will be the new stand up shower(see diagram).
• Install a 50 CFM fan in the new bathroom.
• Install a toilet in the new bathroom.
• Install a sink in the new bathroom.
• Frame front of new bathroom (hallway side) and install a new barn style sliding door.
• Tile new stand up shower and connect to main water line with pex pipes.
• All new fixtures (toilet, sink and shower) will attach to the new 3 inch main sewer line.
• Pipe vents installed as needed.
• New electrical circuit to the main panel with gfci outlet and two light fixtures (shower
and above sink).
2. Convert Den into additional bedroom (see attached diagram).
YVNASithANIA
• Replace window to meet a. n 44 inch height from the floor and a minimum 24
inch height and 20 inch width opening.
• Install new smoke detector.
• Reroute air return to the main living room.
• Install wall partition between the living room and den (see diagram) and install barn style
sliding door.
3. Install electrical Heat Pump mini split system (air conditioning and heating).