Loading...
Plans (2) rnec ao 1 3- o o 0a, 1 t 1 51,,, 6,717,1 OFFICE COPY STRUCTUAL CALCULATIONS Lity oi igaro Approved Plans 8y...1-11___,,,....., DaFORte-: 4-1..x--i REVISION Comcast Boiler replacement REQUIRED Tigard, Oregon Stat.?, (1:'. Ozngoo .;ii-ilcitiral Specialty Code ___,,,,.,...,....._ 0 Concrete and Reinforcing Steel RECEIVED NJ Bolts Instolled in Concrete Pox\) APR 3 0 2018 CI ,ial Moment-Resisting Concrete Frame CITY OF TIGARD 0 Reinforcing Steel&Prestressing Steel Tendons BUILDING DIVISION El Structural Vilslding Hunter-Davisson, Inc. 0 High-Ste,, ,, Bolting 0 Structural1risoriry 3.800 SE Pershing Street Pe 0 Reinforced Gyp,sum Concrete Portland, Oregon. 97202 0 Insulating Cor.....TIste Fill 0 Spray Appli.,,- ''we-Resistive Materials 0 Piling., "3:.`i,,,,,c., -,•iurs and Caissons 0 Shoicrete 0 T (1 lik 19. El Special c`2„ eding, Excavation and Filling o• fill'' 40,0 PROt 494( i - ,i m • —tito 0 Smoke-Control Systems °- V ED Other Inspections ' 1 , 1 1 Of If i 411 Associated -4;przi IC: C onsultants ___, obt. C71 YX.C" Mc. Structural Engineers oll:RES: 06-30-2018 100 East 13th Street • Suite 10 •Vancouver, Washington 9866o Portland: (503)384-0460 •Vancouver: (360) 699-0607 A a di 4 ; i lor 1 0 1 .41-evEL0. ATI i 5- 0,,itt *$.1(13e- gill pok i 14 ft. ),(, to.)4 / A 1;461 " } `: (e.„) c_to Al C.- P404) ela,---$r ...SX , A ," ro '•, ' 4 I } . f R a . 5 ofox y Ar° plop 1.44y -4. z 114 04,,, - A, , , A .fi Br Calmest Boller Replacement 158405 EOM Co lta 'to 1' t f Tigard, r' •o lF .Pt-A-C-i vv/ t.e/Z 4P7 54-14e- 4-5 :.,c 1 'plz , Ce-) 4 4'x4' e.oi✓G P.4p DI al x 4s x56-11 �5 ( /';;A4- - • 4 ( I) (. 75)(1) 3S z . l -t` f)) . " 7 oro) 4io Pv 0 ( • 73) ( jc 4- SL) 4' o rm lo c &s/s - H r--49 (!.5 00 - 19( 3,64/12) 47 30 &Jd 0 /f' V 440 ---- (Do L.-7r IA/ mi Tz) -rpro e4F - ro obr/o Po(Z Lti 7-W , ..1) e.. \/ - 10-1. 4 16. c 2•b5 f461-'" °K B IConsultantsProject Datelob No. Associated Comcast Boiler Replacement 158-105 Location Inc. suucturaunglneers Tigard, Oregon 01/10/2018 100 Bast 13111(S:373. 3th Street•Suite 10•Vancouver,Washington 98660 Client Sheet No. Portland.(503)384-0460 • Vancouvcr.(360)699-0607 Hunter davisson _ 1 `�u�• L/!�. !�- is L % 1 PARTIAL 2ND FLOOR PLAN - EXISTING HVAC I�► M102 1/4' = 1'-0' - NEW HOT WATER BOILERS CAPACITY WATER SIDE OPER ASME ELECTRICAL FUEL FLUE OPER SYMBOL MANUF MODEL AREA SERVED LOCATION MBH GPM PRESSURE EWT LWT PRESS RATING V/PH/HZ/BREAKER TYPE CAPACITY DIA WEIGHT NO ES (GROSS IBR) DROP(FT.) F DEG. F DEG. PSIG PSIG (MBH) INC S LBS y-1 WEIL-MCLA ..Bx-W BULGING HEATING WATER MECHANICAL 275 1,126 75 1 150 180 18 50 120 V/1 PH/60 HZ/15 AMP NAIL GAS. 1,356 1C 3,430 NOTES: EXISTING HOT WATER BOILERS CAPACITY WATER SIDE OPER ASME ELECTRICAL FUEL FLUE OPER SYMBOL MANUF MODEL AREA SERVED LOCATION MBH GPM PRESSURE EWT LWT PRESS RATING V/PH TYPE CAPACITY INDIA WEBS N•`ES (GROSS IBR) DROP(FT.) F DEG. F DEG. PSIG PSIG --- -- 30 80 12011 NATLGAS. 1,357 1� 3,490 1,• --'--- 1,084 FIELD V°_t;rY .. d;; ,.� ' c..,:W BUILDING HEATING WATER N i;:.a '..•."275 B-1 AND B-2 w,-.: , NOTES:1.INSTALLED MARCH 1989. 2.NO CHANGES TO 13-2. INF LEGEND OF HUNTER—DAVISSON,INC.DRAWINGS, :CIFICA11ONS AND OTHER DOCUMENTS ® EXISTING se Drawings. Specifications and other documents are prepared Hunter—Davisson, Inc. for this Project and unless otherwise DEMO vided, Hunter—Davisson, Inc. shall be deemed the author of se documents and shall retain all common law, statutory and er reserved rights, including the copyright. The Owner shall be O NEW mitted to retain copies of the Hunter—Davisson, Inc. Drawings, clfications or other documents for information and reference in nection with the Owner's use and occupancy of the Project la CONNECT TO Hunter Davisson, Inc.Drawings,Specifications or other EXISTING uments shall not be used by the Owner or others on other jects, for addition to this Project or for completion of this cement, except by agreement In writing and with appropriate npensotion to Hunter—Davlsson, Inc. 0