EODES IGNY. FIELD REPORT
Page 1 of 1
GDI Prlject. Polygon-129-03 Prepared By: j Kyle Hanson
9
Project Name: River Terrace East Date: May 8, 2018
Location: SW Scholls Ferry&Roy Rogers, Bvrtn. Report#: 223
Arrival: 1030 Departure: 1100
Weather: Sunny, 60's Permit#: TBD
Site Visit Requested : Ken (Polygon) - Met With (on site): : None present
Purpose: Observe Building Subgrade(Lots 161-165)
Outstanding Issues: Proof roll road and curb base rock and repair as needed before paving
FR-58 (12/06) Decommission temporary storm and sewer lines through Tract E
FR-177 soft fill from slope cut in lots 153, 154 and 155
Upon arrival, I observed subgrade for lots 161-165 where indicated on the attached site plan. No crew were present
and I was unable to reach Ken with Polygon via phone call. I used a1/2"diameter steel foundation probe to evaluate
the subgrade's consistency, which appeared to consist of brown sandy silt overlain by approximately 2"of crushed
rock. Probe penetrations (through the crushed rock granular base) indicated generally medium-stiff to stiff
subgrade conditions today. However, roots and other organic wooden debris fist-sized or larger were observed
protruding from the subgrade surface where indicated on the attached site plan (S end of lot 165, uppermost hillside
benches/cuts). We recommend removal of this deleterious material from the subgrade prior to pour.
Based on observations and probing, it is our opinion that the subgrade for lots 161-165 observed today,where
indicated on the attached site plan, has been prepared in general accordance with our geotechnical
recommendations contingent upon deleterious material being removed from the subgrade prior to placement of
footings.
Distribution:
Attachments:Site Plan (1)
Reviewed by:
This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and
specifications throughout the duration of the project irrespective of the presence of our representative.Our work does not include supervision or direction of the contractor,the contractor's employees
or agents_Our firm is not responsible for site safety.This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations.The report can only be
considered final upon review of the GeoDesign project manager,as indicated by initials in the"Reviewed Bf section,
r
olerSignature:
9450 SW Commerce Circle,Suite 300 I Wilsonville,OR 97070 1503.968.8787 I www.geodesigninc.com