Loading...
Report (36) • Up011101 • • FIRE SAFETY SYSTEMS AQUASAFETm FLOW TEST VERIFICATION AquaSAFE1'M Flow Test Verification Form Alliance Important:Installing contractor must submit this Member ID: _ completed form.Failure to do so nullifies the Company Name: 1 system warranty.E-mail or fax completed form — to the Uponor Fire Safety Design Department Contact: Ke2,bect 0.9-‘V\A\ at technicalservices@uponor.com or 952.997.1731. Phone" T(e1 For questions,contact Uponor Technical Services at 888394.7726 or technical.services@uponor.com. Fax: rz' Color of test orifice used: ! Job Name: et Il`Ct 1-4/ {,e,,C Static pressure(not flowing)reading at incoming Project Number: [ water supply into home or at main shutoff: _5'( Job Address: / 5tt) l 60 � � Residual pressure(flowing)reading at incoming water City: supply into home or at main shutoff: &C), State,ZIP: OP 9)4 For designs not provided by Uponor, complete the What time of day was the flow test taken? following information. Flow test method used? Ai Bucket Flow Meter Designer's Name: I 6f" Qo tt(o Flow test gpm: 'i j Company: _ i nc-( — How many gallons ofwater did the design predict as required? Phone: `lcrj 99)-53C3 Did the test meet or exceed design flow? Ar Yes `7 No Fax: Which sprinkler did you flow?Number:_ l i Is the warning sign permanent) attached close to the main shutoff valve? J Yes 4 No nLocation of head: ( .awn a Yes No Date left in service with all valves open: _lb! Was this system required by code? Test Witnessed and Verified by: Name Si.natur Name �r��� i / Occupation Dat pa_ o — _ • Additional Explanations and Notes O_ WI Uponor,Inc. Tel:800.321.4739 5925 148th Street West Fax:952.997.1731 LLApple Valley,MN 55124 USA Web:www.uponor-usa.corn