Loading...
Report (25) insT oil — 00308 Mi YUP000( FIRE SAFETY SYSTEMS AQUASAFETM FLOW TEST VERIFICATION AquaSAFE' Flow Test Verification Form Alliance Important Installing contractor must submit this Member ID: _ completed form.Failure to do so nullifies the Company Name: _.� !di,�+rnc�' P'u`rer system warranty.Email or fax completed form to the Uponor Fire Safety Design Department Contact: 1-f I):s.1-0Yvtin at technicalservices@u ponor.com or 952.997.7731. Phone"_ 503-y —*F1 d For questions,contact Uponor Technical Services at 888.594.7726 or technical.services@uponor,com. Fax: n' Color of test orifice used: /�l we Job Name: " ( �t( Tal-ok �� �� Static pressure(not flowing)reading at incoming Project Number: water supply into home or at main shutoff: 93 Job Address: (gO(:)) Stay j IAS - Residual pressure(flowing)reading at incoming water City. I ei.de +Ci supply into home or at main shutoff: (9t`) State,ZIP: Ota C7)007) For designs not provided by Uponor, complete the What time of day was the flow test taken? / following information. Flow test method used? Bucket J Flow Meter Designer's Name: _ gi,e KU 1 k,( Flow test gpm: 't a Company: "1ppn How many gallons o water did the design predict 5 -� �q� as required? Phone: (3 Did the test meet or exceed design flow? Ar Yes ]No Fax: Which sprinkler did you flow?Number: fi Is the warning sign permanently attached close to the main shutoff valve? ]Yes ,N No Location of head: ( c On #-3ni5 Yes No i jie Was this system required by code?(AP i Date left in service with all valves open: 9 1 Test Witnessed and Verified by: Name Signature Name �, � N. Occypation Dat a, Additional Explanations and Notes LLI Uponor,Inc. Tel:800.321.4739 5925 148th Street West Fax:952.997.1731 LLApple Valley,MN 55124 USA Web:www.uponor-usa.com