Loading...
Report (19) (4)1000( FIRE SAFETY SYSTEMS • AQUASAFETM FLOW TEST VERIFICATION 1111111111111111111111 AquaSAFE1M Flow Test Verification Form Alliance Member ID: Important Installing contractor must submit this -- --- completed form.Failure to do so nullifies the Company Name: __Al 1►CAAA:f t' __mb;h system warranty.E-mail or fax completed form {� —� to the Uponor Fire Safety Design Department Contact: _ aikka ]�yy at technicalserviceseuponor corn or 952.997.1731. Phone"_ c' 119 For questions,contact Uponor Technical Services at 888.594.7726 or technical nrices@u com. Fax i Color of test orifice used: Job Name: K 1 l{f Static pressure(not flowing)reading at incoming Project Number: _ water supply home or at main shutoff - PP Y�into : Job Address: City: t Residual pressure(flowing)reading at incoming water — supply into home or at main shutoff: State,ZIP: __ _ For designs not provided by Uponor, complete the What time of day was the flow test taken? following information. Flow test method used? Bucket i Flow Meter Designer's Name: _f ;Vu tti Flow test gpm:__ Company: _ C How many gallons of water did the design predict Phone: (3_1/2_13.5- — as required? 1) Did the test meet or exceed design flow? 3'Yes ]No Fax Is the warning sign permanently attached close to the Which sprinkler did you flow?Number u main shutoff valve? J Yes No Oh ��h�slN Location of head: Was this system required by code?i Yes No Date left in service with all valves open: Jt Test Witnessed and Verified by: Name iffiii Occu ationSi. �� a.� � �(. p Date • OW Additional Explanations and Notes 0- 2 2 Uponor,Inc. Tel:800.321.4739 5925 148th Street West Fax:952.997.1731 LL Apple Valley,MN 55124 USA Web:www u ponor-usa.com