Loading...
Report (69) FIRE SAFETY SYSTEMS AQUASAFETM' FLOW TEST VERIFICATION AquaSAFEIM Flow Test Verificati on Form Alliance Important:Installing contractor must submit this Member ID: — _ completed form.Failure to do so nullifies the Company Name: LS L1LCs�hr / i11 system warranty.E-mail or fax completed form to the Uponor Fire safety Design Department Contact: _�� at technical services noir or os or 952.997.1737, Phone" ` - �/�� t For, questions,contact Uponor Technical services at 888.594.7726 or technical.services@uponor.corn Fax: (� Color of test orifice used: R�u C Job Name: _ R I_ V'P�`_��t-�q�.�_ Static pressure(not flowing)reading at incoming Project Number: _i'- �y� water su I into home or at main shutoff: Job Address: ► 1 w City: � � „ Residual pressure(flowing)reading at incoming water --- supply into home or at main shutoff: 6 0 State,ZIP: � For designs not provided by Uponor,complete the What time of day was the flow test taken? :G following information. Flow test method used? Bucket J Flow Meter Designer's Name. _ S ,1� K Flow test gpm:—. Company: _ _ How many gallons of water did the design predict Phone: as required? �, Fax: — Did the test meet or exceed design flow? 4'Yes 7 No Is the warning sign permanently attached close to the Which sprinkler did you flow?Number: fl main shutoff valve? ..]Yes 4 No O , Location of head: Was this system required by code? Yes J No Date left in service with all valves open: _— Test Witnessed and Verified by: Name r Signature 1 r. ;kt Occupatio Date g Additional Explanations and Notes mm_O tti Uponor,Inc. Tel:800.321.4739 3 5925 148th Street West Fax:952.997.1731 LL Apple Valley,MN 55124 USA Web:www.uponor-usa.com • porwr-usa.com