Loading...
Permit (33) CITY OF TIGARD BUILDING PERMIT 11 y' Permit#: BUP2017-00174 1 COMMUNITY DEVELOPMENT Date Issued: 05/01/2018 T[Cj A RD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S1136000600 Jurisdiction: Tigard Site address: 16580 SW 85TH AVE Project: Clean Water Services Subdivision: None Lot: None Project Description: O&M Building-Phase 2-Small addition and remodel of interior spaces. Contractor: P&C CONSTRUCTION CO Owner: CLEAN WATER SERVICES 2133 NW YORK ST 2550 SW HILLSBORO HWY PORTLAND, OR 97210 HILLSBORO, OR 97123 PHONE: 503-665-0165 PHONE: FAX: FEES Specifics: Description Date Amount Type of Use: COM Class of Work: ADD Type of Const: IIIB Permit Fee-Additions,Alterations, 04/13/2018 $17,931.95 Demolition Occupancy Grp: B Occupancy Load: 40 12%State Surcharge-Building 04/13/2018 $2,151.83 Dwelling Units: Plan Review 07/03/2017 $11,655.77 Stories: 1 Height: ft Wash Co Trans Dev Tax 04/13/2018 $7,480.00 Bedrooms: Bathrooms: Parks SDC Improvement 04/13/2018 $526.00 Value: $4,500,000 Parks SDC Reimbursement 04/13/2018 $95.00 DC Provision Review,COM TI-Ping 04/13/2018 $361.00 Plan Review-Fire Life Safety 04/13/2018 $7,172.78 Floor Areas: Metro Const.Excise Tax 04/13/2018 $5,400.00 Total Area: 3966 Tig-Tual School CET-Non Residential 04/13/2018 $2,419.26 Accessory Struct: Basement: Carport: Covered Porch: Deck: Garage: Mezzanine: Total $55,193.59 Required: Required Items and Reports(Conditions) Fire Sprinkler: Yes Parapet: Fire Alarm: Yes Protected Corridors: No Smoke Detectors: Manual Pull Stations: Accessible Parking: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800 .2344. i Issued By: Aire_ Permittee Signature: j 41 . 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the V'ct. Approved plans are required on the job site at the time of each inspection. Building Permit Application Commercial FOR OFFICE USE ONLY City of Tigard VED Received 4 Date/By: „9-9.--„9-9.-- Permit No.: P�i 7-00/7y 13125 SW Hall Blvd.,Tigard,OR 97223 p Plan Review - Phone: 503.718.2439 Fax: 503.598.1960 JUN 19 2017 Date/By: .. t') Other Permit: TIGARD Inspection Line: 503.639.4175 Date Ready/By: n' Jur s: ® See Page 2 for Internet: www.tigard-or.gov CITY OF TIGARD No d/Method: ((//j//. Supplemental Information Byl I.NG DIVISION /- TYPE ©1+ b QUID ATA:1-AND 2-FAMILY'DWELI ING' 0 New construction 0 Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ®Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF.CONSTRUCTION work indicated on this application. ❑ 1-and 2-family dwelling ®Commercial/industrial Valuation: $ ❑Accessory building 0 Multi-family Number of bedrooms: ❑Master builder 0 Other: Number of bathrooms: r/60. & JOB SITE INFORMATION.AND.LOCATION Total number of floors: Job site address:+60641,SW 85th Ave New dwelling area: square feet City/State/ZIP:Tigard,OR 97224e.,,,_ A t Garage/carport area: square feet Suite/bldg./apt.no.: Project name:Durham nR M Rhaae2—Remetlee Covered porch area: square feet Cross street/directions to job site:SW Durham Road Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL,-USE CHECKLIST Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.:2S113B000600 Tigard Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK ' . work indicated on this application. Valuation: $4,500,000.00 Remodel of interior spaces,replacement of extrior materials and a small addition of the existing 1973 and 1993 Operations and Maintenance Existing building area: 31799 square feet Buuilding t � New building area: "8y� square feN3 9 6 6 PIROPE+R'TY OWNER 0 TES Number of stories: /1 „ . };• Name:Clean Water Services Type of construction: Type IIIB Address:2550 SW Hillsboro Hwy Occupancy groups: t a City/State/ZIP:Hillsboro,OR 97123 Existing: F-1 and B Phone:(503)547-8150 Fax: ( ) New: B k i �® AP?'LIC'ANT ❑ C'ONTACT`PERSON )GRMIT FEE$ # (PY 4 a r r,to fee ch dine) . Business name:MWA Architects Structural plan review fee(or deposit): +• Contact name:Jean Root FLS plan review fee(if applicable): Address:70 NW Couch St,#401 Total fees due upon application: City/State/ZIP:Portland,OR 97209 Amount received: 11 r. Phone:(503)973-5151 Fax::(503)973-5060 0HOTOVOLTAIC SOLAR PANEL SYSTEM FEES* x E-mail:-mail:jvonbargen@mwaarchitects.com Commercial and residential prescriptive installation of ,, CO TRACTOR. • P �, - , � •� roof-top mounted Photovoltaic Solar Panel System. 4' Business name:P&C Construction Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon 4 i ” Address:2133 NW York Street Solar Installation Specialty Code checklist. City/State/ZIP:Portland,OR 97210-2108 Permit fee(includes plan review and administrative fees): $180.00 Phone:(503)665-0165 Fax:(503)667-2565 State surcharge(12%of permit fee): $21.60 CCB lic.:38619 Total fee due upon application: $201.60 Authorized signattir ✓ This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. ---k" Print name:Jean Root '` * Fee methodology set by Tri-County Building Industry Date: /1117.„9. Service Board. I:\Building\Permits\BUP-COM PennitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB) ri Building Division Accessibility: Barrier Removal Improvement Plan TIGARD REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five per-cent(25%). VALUATION: Total of all renovation,alteration or modification being done, $ �156�I 000 excluding painting and wallpapering: [1] MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ 11G:45)000 ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ 5(00 000 (b) An accessible entrance: $ S2s100 0 (c) An accessible route to the altered area: $ y201000 (d) At least one accessible restroom for each sex or a single unisex $ �� �O restroom: �' (e) Accessible telephones: $ /e (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and $ 7�'�00 alarms: 10154_0_00 �� C�h TOTAL(shall equal line [2] of Valuation Computation): $ V I:ABuilding\Permits\BUP-COM PermitApp.doc 03/03/2011 IIIICity of Tigard lJ COMMUNITY DEVELOPMENT DEPARTMENT TIGARD Building Permit Review — Commercial - No Land Use Building Permit #: i6I.,,_p (9_0/7-60 f 7 Site Address: ` /(r2( i ,_s-k) /9y.� Suite/Bldg#: Project Name: 04,11 btAer— �i'VIC.Q (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: /74g/64( ca-ha'.�GC4,4 LI-YL—,‘ I YL. -Ie -i,c" ,E.40/eftle JI `�J Existing Business Activity: (- acx_ Proy osed Business Activity: 7l 10(Verify site address/suite# exists and active in permit syst IC ! 'ver Terrace Neighborhood: 0 Yes WJ No /TA/Zoning:oning: /—P ermitted Use: Ud Yes 0 No 0 Spec Space nfirm no land use required. Business License: Exists: Yes 0 No,applicant notified to obtain business license Notes: L. Approved by Planning: �^� //TJ,z.... Date: CC � Revisions (after Building Submittal only) Reviewer Revision 1: 0 Approved 0 Not Approved Date Revision 2: 0 Approved 0 Not Approved Revision 3: 0 Approved 0 Not Approved Building Permit Submittal Original Submittal Date: 694 a. 1/7 Site Plans: # Building Plans: # j Building Permit#: Enter building pe #above. Workflow Routing: .0–PlanningSCJ Permit Coordinator Workflow Si off: �'""�g - B,�'�S' -off for Planning(include notes from planning review) Route Application Documents: J2 Building. original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: 10.e.,..44.--L. Date: 6 I:\BuildingWorms\BldgPernutRvw COM_NoLandUse 060116.docx Permit Coordinator Review ❑ Conditions"Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) J c� Revision Notice 1: Date Sent to Applicant: $' 0 dui e`'"'0" v Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: SDC Fees Entered: Wash Co Trans Dev Tax: Yes /A ,c�/�9// Tigard Trans SDC: 0 Yes Parks SDC: 'es p N/A OB to Issue Permit /24 Approved by Permit Coordinator: 0 Date: \BuildingForms\BldgPermitRvw_COM NoLandUse_070915.docx Albert Shields From: Albert Shields Sent: Monday, August 07, 2017 5:40 PM To: 'jvonbargen@mwaarchitects.com' Cc: Khoi Le;Al Dickman Subject: CWS Permits, BUP2017-00173, BUP2017-00174, &SIT2017-00012 Jean, on reviewing the applications for the above permits Engineering has found that in each case a water quality facility must be shown per CWS Design Standards. Please add an appropriate water quality facility to the plans for these permits and re-submit as a revision. Plan Review will proceed but the permits will not be issued until the water quality issue is addressed. Please let me know if you have any questions. Albert Shields 1 TDT Estimate CWS Additions 6/7/2017 16060 sw 85TH Ave., 2S113B000600 AMS TDT RATES EFFECTIVE 7/1/16 TSDC CITYWIDE&TSDT RT OVERLAY RATES EFFECTIVE 7/1/16 INSIDE RIVER TERRACE TSDC CITYWIDE EFFECTIVE 7/1/16 Q Yes Project is in River Terrace ? 0 No Former Use Rate Type Use# ITE Code # Units Rate TDT Amount Description TDT 1 $0 Vacant Land TSDC-Imp 1 $0 TSDC-Reim 1 $0 TSDC-RT 1 $0 Total TDT and TSDCs Former Uses $0 Proposed Use Use# ITE Code # Units Rate TDT Amount Description TDT 1 0 2.29 $0 $0 New 2,285 sq ft TSDC-Imp 1 $0 conference center, no new TSDC-Reim 1 $0 offices, staff, or TSDC-RT 1 $0 traffic impact. TDT 2 710 0.86 $8,687 $7,480 Addition of 861 sq ft TSDC-Imp 2 $0 of 0 & M office space. TSDC-Reim 2 $0 TSDC-RT 2 $0 TDT 3 $0 TSDC-Imp 3 $0 TSDC-Reim 3 $0 TSDC-RT 3 $0 Total All TDTs&TSDCs Proposed Uses $7,480 Less: Total All TDTs&TSDCs Former Uses $0 Total All TDTs&TSDCs Net Increase $7,480 Total Net County TDT $7,480 Total Net TSDC-Imp $0 Total Net TSDC-Reim $0 Total Net TSDC RT Overlay $0 $7,480 TDT TSDC Imp+ Reim Target Recovery Rate 28.0% 30% Estimated Total Impact $26,713 $0 Estimated Unmitigated Impact $19,233 $0 All TDT&TDSC TSDC RT Overlay Target Recovery Rate 28% 30% Estimated Total Impact $26,713 $0 Estimated Unmitigated Impact $19,233 $0 TDT=County Transportation Development Tax TSDC Citywide=City of Tigard Transportation System Development Tax(TSDC-Imp&TSDC-Reim) TSDC RT=River Terrace Transportation System Development Tax Overlay Parks Estimate cws Additions 6/7/2017 16060 sw 85TH Ave., 251136000600 AMS ALL PARKS RATES EFFECTIVE 7/1/16 Q Yes Project is in River Terrace ? ® No Note: All Neigh-Imp# Units entries=0 if project is in River Terrace; All Neigh-RT# Units entries=0 if project is elsewhere in the city. Former Use Rate Type Use# ITE Code # Units Rate Parks Amount Description Parks-Imp 1 0 $376 $0 Vacant Land Parks-Reim 1 0 $68 $0 0 Neigh-Imp 1 0 $0 $0 0 Neigh-RT 1 $0 0 2 $0 Total Parks Former Uses $0 Proposed Use Use# ITE Code #Units Rate Parks Amount Description Parks-Imp 1 0 0 $376 $0 New 2,285 sq ft Parks-Reim 1 710 0 $68 $0 conference center, no new Neigh-Imp 1 710 0 $0 $0 offices, staff, or Neigh-RT 1 $0 traffic impact. Parks-Imp 2 710 1.40 $376 $526 Addition of 861 sq ft Parks-Reim 2 710 1.40 $68 $95 of 0 & M office space. Neigh-Imp 2 710 1.40 $0 $0 One new office. Neigh-RT 2 $0 0 Total Parks Outside RT Proposed Uses $622 Less: Total Parks Outside RT Former Uses $0 Total All Parks Outside RT Net Increase $622 Total Parks RT Proposed Uses $0 Less: Total Parks RT Former Uses $0 Total All Parks RT Net Increase $0 Total Parks-Imp $526 Total Parks-Reim $95 Total Neigh-Imp $0 $622 Total Neigh-RT $0 For Non-Residential Calculations: Prior Use: =###sf/EE;#####/###=EEs. Proposed Use: Office=600sf/EE; 861/600=1.44EEs. Parks-Imp=Parks Improvement,Citywide including River Terrace Parks-Reim=Parks Reimbursement,Citywide including River Terrace Neigh-Imp=Neighborhood Parks Improvement Outside River Terrace Neigh-RT=Neighborhood Parks Improvement Inside River Terrace 1111 Building Division Plan Submittal Requirements T I G A R D Commercial& Multi-Family-New,Additions or Alterations 1. SITE PLAN (fully dimensional, drawn to scale) labeled with: A. ❑ map&tax lot# ❑ project name El site address ❑ suite number ❑ zoning El applicant name ❑ phone number B. North arrow. C. Scale (architectural or engineering only). D. Street names. E. Setbacks. F. Parking,including disabled access. G. Finished floor elevations. 2. EROSION CONTROL PLANS AND DETAILS. 3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of plans required based on submittal type (no redlines or tape-ons accepted). All details listed below shall be incorporated into the plans: A. Scale (architectural or engineering only). B. Foundation plan. C. Floor plan(s). D. Cross sections. E. Reflective ceiling plan. F. Seismic bracing detail for suspended ceiling. G. Roof plan. H. Exterior elevations. I. Structural calculations,plans, details and specifications. J. Accessibility barrier removal worksheet. K. Deposit-based on valuation of project. 4. EXTRA SET OF THE FOLLOWING: A. Two (2) copies of site plan to include vicinity map. B. One (1) copy of erosion control plan with details. C. Fire Department Building Survey, and full set of architecture drawings. I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011 IIIIII Building Division Plan Submittal Requirement Matrix T I GARD Commercial& Multi-Family- New,Additions or Alterations Type of Submittal, # of Plans (Includes new,additio s'a nd alteerat .> Required at Submittal Demolition Permit 2 (site plan required showing location and square footage of all buildings to be demolished) Site Work 3 (must include location of all accessible parking) Plumbing (site utilities) 2 Building 3 Fire Protection System 3 Mechanical 2 Plumbing (building fixtures) 2 Electrical 2 Plan review is dependent upon submittal of a completed application and plans. After plan review approval, the Plans Examiner will contact the applicant to request additional sets of plans for distribution purposes (for contractor, City of Tigard,Washington County, and Tualatin Valley Fire&Rescue),if applicable. I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011 Dan Nelson From: Taryn Wheeler <twheeler@mwaarchitects.com> Sent: Friday,August 18, 2017 11:23 AM To: Dan Nelson Subject: RE:Clean Water Services Submittal Fees Thanks Dan, To clarify,we have a 4" and 8" air gap between the WRB and the back our cladding.The WRB at the sheathing acts as the drainage plane. See J& K/A400 and below.Can you clarify where the issue might be? r r Y f .A$t ELATT M$U1.AT1g>Fs .4 5rGYPSUM BOOAFIO ...,"- € . FTCTIC44 FIT IN STUD SPACE `' i , ;-�.t .t ' is R 1+BATT 1N543LA:YCN JAINsem.. „. _ _ ..u. 1.z.MYWOOO SHEA1KI' 12'PLYWOOD SHEATHING . i WEATHER RESISIWE. BARRIER f �`.�� - � ` St L1rE',tOnE.R t+rt:51$7:tVE is ""' TEiS0EN0ED WALL •r" .: BARRIER EXTENSI Al SIM FASTENER f ......._... .............WOOO,'STW5 MORD ., t7tTEN5w1Y.FASTENER PER MFR , 1 it W S1RUOT'URAL FOR - FF • '" WE!:KC♦L A LI !1 .. WE AN:Y SPA04' --swap- t• - . I'ti.} —_V..�..._PANEL Coin PER LIFR X H' "-+-,..,,, _ �' PANEL CLIP PER Wit t. � f--G;". =g �_^�.,,. t .. ,'-,,., vEaTMCAl.ANC'r.E '`'-. i --WOO(7STUDCOOF{D SS ``+.:,,a,..,,,.,....yImhoE�OWKI. .,s^--- Si W:SAfUCTURALFOR 3: .... BBRACK&T TASTEASER PES . ' '`"r :8S STYE Ab SPACiMO ^+_ .t :., 01,5,..., tT2 N E95UUT1Otu tR7$MINI aw .4.----- - I0.4 FIBER CEMENT VERTICAL FIBER CEMENT ' , '\ _t a SMOG 4FCS,+.SEE SIDING t$ $I,SEE ''V .. ELEVATIONS cosh CATIONS E:LEYATIONSS TOR Lmitt...,.,. EXTERIOR WOOD STUD WI HORZ FCS (`io EXTERIOR WOOD STUD W:VERT FCS scut r-I o Taryn Wheeler - Architect AIA MWA ARCHITECTS INC. SAN FRANCISCO OAKLAND PORTLAND direct 503 416 8009 I office 503 973 5151 I email twheeler@mwaarchitects.com Original Message From: Dan Nelson [mailto:DanN@tigard-or.gov] Sent:Thursday,August 17,2017 1:38 PM To:Taryn Wheeler Subject: RE:Clean Water Services Submittal Fees Taryn, I am still not seeing the air gap or way to drain off water.Talked with the building official and he agrees. Dan Nelson Senior Plans Examiner City of Tigard (503)718-2436 F(503)624-3681 dann@tigard-or.gov 1 Original Message From:Taryn Wheeler[mailto:twheeler@mwaarchitects.com] Sent:Thursday,August 17, 2017 8:58 AM To: Dan Nelson Cc:Jean von Bargen Root Subject: RE: Clean Water Services Submittal Fees Hi Dan, As we just discussed, attached find product data for the basis of design for WRB on this project. It appears to me that this product meets and exceeds performance requirements per OSSC'1404.2 Water-Resistive Barrier'. You will see on our details sheets A500-A521 that the product will be installed to meet section 1405.4 Flashings. Please let me know if this is the information needed for permitting purposes and I will make sure to note up our wall assemblies to make this product known on the drawings. Thanks again, Taryn Wheeler - Architect AIA MWA ARCHITECTS INC. SAN FRANCISCO OAKLAND PORTLAND direct 503 416 8009 I office 503 973 5151 I email twheeler@mwaarchitects.com Original Message From: Debbie Adamski [mailto:DEBBIE@tigard-or.gov] Sent:Thursday,July 27, 2017 8:54 AM To: Dan Nelson Cc:Taryn Wheeler; Mark VanDomelen;#Building Permit Technicians Subject: RE: Clean Water Services Submittal Fees Dan, When you return on Monday, please give Taryn a status update on this project. There is a site work permit,SIT2017- 00012,a new conference building, BUP2017-00173, &an addition/remodel permit, BUP2017-00174. The address is 16060 SW 85th Ave. Thanks! Debbie Adamski Senior Building Permit Technician City of Tigard I Community Development 13125 SW Hall Blvd.,Tigard,OR 97223 503-718-2450 Original Message From:Taryn Wheeler[mailto:twheeler@mwaarchitects.com] Sent: Monday,July 24, 2017 5:30 PM To: Debbie Adamski Subject: RE:Clean Water Services Submittal Fees Hi Debbie, I just thought I would check in on the status of the Permit review for this project. Can you give me an update? Much appreciated, 2 FOR OFFICE USE ONLY-SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT Transmittal Letter r t c,n R I) 13125 SW Hall Blvd. • Tigard,Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: DATE RECEIVED: RECEIVED BUILDING DIVISION AUG 2 9 2018 FROM: tfi e ti 501+1A1W., CITY OF TIGARD COMPANY: �� (f((AC -i ova BUILDING DIVISION PHONE: 5j3 .S7()N - r7 BytCt RE: 1(05 C(0 St._) tS+I,r iLe &RSV/ OOPS -( (Site Address) (Permit Number) ate-„ u.tc r suit cce5 tr ,u._-c k. &'1' (Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: Copies: Description: Copies: Description: Additional set(s) of plans. Revisions: Cross section(s) and details. Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculations. Y Engineer's calculations. •3 Other(explain): ft/M m.h 01A &fore fiod..4 S yS'k i^— 6 fiP_,rtca SU(1ot i//at f REMARKS: FOR OFFICE USE ONLY Routed to Permit Tecician: Date: --a0—� Initials: Fees Due: ❑Yes No Fee Description: l____$)nlintli : Special Instructions: Reprint Permit(per PE): ❑ Yes [ No ❑ Done Applicant Notified: Date: Initials: I:\Building\Forms\TransmittalLetter-Revisions_061316.doc A City of Tigard ii ~ COMMUNITY DEVELOPMENT DEPARTMENT II T c �n Building Permit Review — Commercial - No Land Use � .... ..r......w....:,,::sa so -4wensz.�64::,a.,ibavL..A.3�r�.....,..,,W:u�,i�s43acea.,arJ:rats3u:.. Building Permit #: (6I.,LP 02o/7-by f 7 9 Site Address: Suite Bld #: Project Name: eb,, t/Ude-_S?e vic tQ (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review 0 Proposal: 411161il' cx2-itc Tl/ ) JdAl) _.. 710 enei. Existing Business Activity: C-�� ProVsed Business Activity: 1/ erify site address/suite#exists and active in permit syst . I1' p: 'ver Terrace Neighborhood: ❑ Yes IICf No Ti oning: "---rpirermitted Use: Yes ❑ No ❑ Spec Space n firm no land use required. Business License: Exists: Yes 0 No,applicant notified to obtain business license Notes: Approved byPlanning: Date: &,/ /)9_ Revisions(after Byliding Submittal only) k jeviewerLek Date Revision 1: [y7 Approved 0 Not Approved 1 Revision 2: 0 Approved 0 Not Approved Revision 3: 0 Approved 0 Not Approved Building Permit Submittal Original Submittal Date: (_o 41--?- /7 Site Plans: # Building Plans: # Building Permit#: E`Enter building_pe #above. Workflow Routing: 0-PlanningalPermit Coordinator !d Building Workflow Sign-off: 2-S -off for Planning(include notes from planning review) Route Application Documents: Building: original permit application,site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: - _ °,..".....4.._..._-... ' Date: f I:\Building\Porins\BldgPermitRvw_COM_NoLandUse_060116.docx 1 Permit Coordinator Review El Conditions"Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) / J Revision Notice 1: Date Sent to Applicant: $191/ C Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: [ I SDC Fees Entered: Wash Co Trans Dev Tax: "'es nip /A /Y fr / ,/J/ g El Trans SDC: Yes Parks SDC: .Yes l"'( N/A OK to Issue Permit Approved by Permit Coordinator: Date: '/ ' i zr I:\Building\Forms\BldgPeimitRvw_COM_NoLandUse_070915.docx Samuel Copelan From: Jeff Mashos <Jeff@ENCOREGLASS.CO> Sent: Friday,August 10, 2018 7:06 AM To: Samuel Copelan Subject: RE: BUP2017-00174, Clean Water Services My submittal elements are structural for only my system. I do not hold up or provide support for anything else. My calcs are just for my system and how it attaches to the openings. The openings ability to handle my loads is not my concern. I am given a watertight opening and I simply put my system in and waterproof to the adjacent materials. Jeff From:Samuel Copelan<samuelc@tigard-or.gov> Sent:Thursday,August 9, 2018 5:34 PM To:Jeff Mashos<Jeff@ENCOREGLASS.CO> Subject: [BULK] RE: BUP2017-00174, Clean Water Services Hi Jeff, So are your submittal elements only structural in nature? Thanks, Sam Copelan Assistant Planner City of Tigard; Community Development 13125 SW Hall Boulevard Tuesday-Thursday Phone: (503)-718-2450 Email: Samuelcatigard-or.gov From:Jeff Mashos<Jeff@ENCOREGLASS.CO> Sent:Thursday,August 9,2018 9:42 AM To:Samuel Copelan<samuelc@tigard-or.gov> Subject: RE: BUP2017-00174, Clean Water Services Samuel, I am not sure what you are asking. I am not doing any revisions. I am contracted to put new openings in existing holes and my contract provides that I submit an engineered set of drawings for my scope of work. I have done so. Any other questions about revisions that are being made by the GC should be directed to them. Jeff 1 From:Samuel Copelan<samuelc@tgard-or.gov> Sent: Wednesday,August 8, 2018 3:39 PM To:Jeff Mashos<Jeff@ENCOREGLASS.CO> Subject: [BULK] BUP2017-00174,Clean Water Services Good evening Jeff, I understand that you have been out for a week, and are playing catch up.When you get the chance, please send me a list of all the revisions for the Clean Water Services remodel that you submitted for on August 8th. What you sent to the City of Tigard appear to be only revisions for Building and Engineering, however we will need some written confirmation. Once we have this list,we can route the plans accordingly.Thank you, and I hope that you have a good evening! Sincerely, Sam Copelan Assistant Planner City of Tigard; Community Development 13125 SW Hall Boulevard Tuesday-Thursday Phone: (503)-718-2450 Email: Samuelc@tigard-or.gov DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained by the City of Tigard in compliance with the Oregon Administrative Rules"City General Records Retention Schedule." 2 Lina Smith From: Lina Smith Sent: Monday, August 6, 2018 12:59 PM To: Samuel Copelan Cc: Agnes Lindor Subject: BUP2017-00174 Revision Hi Sam, The applicant didn't specify what's been changed since the original submittal. Please call the applicant to find out what the specific changes are, so we can figure out if it's something Planning even needs to review. If it turns out Planning does need to review it, we may need Steph or Julie's help to track down the original plans, so we can compare them with the revisions. Thanks, Lina Lina Smith Assistant Planner City of Tigard Community Development 13125 SW Hall Blvd.Tigard,OR 97223 E-mail F,inaCSCigar d or.c ov _7 �.) ail „,1-4\ pii(,`l'` c\IG':4cni4tu(]`iaf4 ) 07) -v. avV kA wii\ l7t clafr,1 L7c, tx:011, Q.1"44 L (rii pt,L 1 4 FOR OFFICE USE ONLY—SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT Transmittal Letter r 3()A R I) 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: DAT vJ # D DEPT: BUILDING DIVISION 1� 1� AUG 2 9 2018 FROM: (ti;C( >iinek€ CITY OF TIGARD BUILDING DIVISION COMPANY: e Cot„,5i- -71Vs 4,#' PHONE: 503 By: — RE: ILCf0 5w <>4L, nut f4,034517--D017 (Site Address) (Permit Number) u€G14 (Alitr 9ruic `s 00-6,0k.--Oink 6(.4,I01I (Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: Copies: Description: Copies: Description: Additional set(s) of plans. Revisions: Cross section(s) and details. Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculations. S Engineer's calculations. 3 Other(explain): Altalowitct( ievd+w5 a.d3 Daa- a REMARKS: FOR OFFICE USE ONLY Routed to Permit Technician: Date: JO— J_ f - Initials: iJ a �l _ Jo Fee Description: Amount Due: Ai 4.sn kV •A,J $9a -z $ $ $ Special Instructions: Reprint Permit(per PE): 0 Yes EIDone Applicant Notified: Date: j) 7l/i /1 Initials: � l l� I:\Building\Forms\TransmittalLetter-Revisions_061316.doc 4 JB11,0 Re-Submittal : OREGON Engineering Comments Review Date: June 20th,2018 Customer: HTM Project Name: CWS Durham O&M Building Engineer: Cundiff Location: Portland,OR Spec Section: 237416 Cundiff Comments—237416 Packaged Rooftop Air-Conditioning Unit Curbs 1.Provide insulated curbs as specified in Section 237416.13,Article 2.15 and Section 237416.1 1,Article 2.16 JBO Response:All curbs to be provided with Thybar standard 31b 1.5" Rigid Insulation within curb walls.See attached updated section views for curbs. The undersigned,acting on behalf of the Contractor,has reviewed the submittal for the general conformance of the design intent of the contract documents.y��� 7e�lte 9 " 06/25/2018 735 SW 20th Place, Suite 230, Portland, OR 97205 PHONE (971) 717-7123 B OREGON Re-Submittal Date: June 20th,2018 Customer: HTM Project Name: _ CWS Durham O&M Building Engineer: Cundiff Location: Portland,OR Spec Section: 237416 Johnson Barrow respectfully submits the following equipment for review: Product Tags Qty. _ Model Manufacturer Rooftop Unit Curbs 920AHUO2 thru 920AHU10 9 RQ and RN AAON General Notes: • This submittal is for approval.Approval is required in order for equipment to be released for fabrication. • Seismic Curb Calculations to be provided after engineer's approval. • Curbs to be provided with 1.5"31b Rigid Insulation within curb walls. Submitted By: Rob Brown Andrew Murphy Johnson Barrow Oregon Johnson Barrow Oregon Direct/Cell:971-724-1182 Direct/Celt:503-758-8703 Emaii:RoaB JBorro ,,.r orr:: Email:AndrewM @ JBarrow.com SUBMITTAL REVIEW ®NO EXCEPTIONS TAKEN 0 REVISE AND RESUBMIT 0 MAKE CORRECTIONS NOTED ❑SUBMIT SPECIFIED ITEM CHECKING IS ONLY FOR GENERAL CONFORMANCE WITH THE DESIGN CONCEPT OF THE PROJECT AND GENERAL COMPLIANCE WITH THE INFORMATION IN THE Sign CONTRACT DOCUMENTS. ANY ACTION SHOWN ABOVE,IS SUBJECT TO THE REQUIREMENTS OF THE PLANS AND SPECIFICATIONS. CONTRACTOR IS RESPONSIBLE FOR: DIMENSIONS WHICH SHALL BE FABRICATED AND CORRELATED AT THE JOB SITE;FABRICATION PROCESSES AND TECHNIQUES OF Approved as Noted CONSTRUCTION;COORDINATION OF HIS WORK THAT OF ALL OTHER TRADES; pp AND THE SATISFACTORY PERFORMANCE OF HIS WORK. Approved with Comments CUNDIFF ENGINEERING,INC. Revise and Re-submit 7007 S.W.CARDINAL LN.#145 PORTLAND,OREGON 97224 INITIALED BY: CMB DATE: 06/26/2018 735 SW 20th Place 230 , Portland , OR 97205 PHONE (971) 717-7123 City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 Location: Inspection Date: 16580 SW 85TH AVE, TIGARD, OR, 97224 Record Type: Record ID: Commercial - Building BUP2017-00174 Inspection Type: Inspector: 299 Final inspection Jeff Grove Result: PASS - NoCofO Comments: No C of 0 needed as this was a tenant improvement and C of 0 was never lost. Violation Summary: Inspector Contractor