Loading...
Report IPA. COM check Software Version 4.0.6.0 111 Envelope Compliance Certificate Section 1: Project Information RECEIVEr Energy Code:2014 Oregon Enemy Efficiency Specialty Code JUN 1 9 2017 Project Title:CWS Durham C{� jl� r Project Type:Addition Envelope Compliance Method: Prescriptive BUILDING �plllc;; Construction Site: Owner/Agent: Designer/Contractor: 16060 SW 85th Ave Jean Root Taryn Wheeler Tigard,OR 97224 MWA Architects MWA Architects 70 NW Couch St 70 NW Couch St Portland,OR 97209 Portland,OR 97209 503 973 5151 503 973 5151 jvonbargen@mwaarchitects.com twheeler@mwaarchitects.com Building Location(for weather data): Tigard,Oregon Climate Zone: 4c Vertical Glazing/Wall Area Pct.: 29% Building Use:Area Type Floor Area 1-Existing Operations Building(Office):Nonresidential 861 Section 2: Envelope Assemblies and Requirements Checklist Envelope PASSES Envelope Assemblies: R-Value Proposed Max.Allowed Component Name/Description Cavity Cont. U-Factor SHGC U-Factor SHGC Roof:Insulation Entirely Above Deck,[Bldg.Use 1 -Existing --- 20.0 0.048 --- 0.048 --- Operations Building] Exterior Wall-North:Steel-Framed, 16"o.c.,[Bldg.Use 1 - 21.0 7.5 0.059 --- 0.064 Existing Operations Building] Exterior Wall West:Wood-Framed,16"o.c.,[Bldg.Use 1 -Existing 21.0 7.5 0.040 --- 0.064 --- Operations Building] Window 1:Metal Frame Curtain Wall/Storefront,Other,[Bldg.Use --- --- 0.450 0.400 0.450 0.400 1 -Existing Operations Building] Window 2:Metal Frame Curtain Wall/Storefront,Other,[Bldg.Use --- --- 0.450 0.400 0.450 0.400 1 -Existing Operations Building] Window 3:Metal Frame Curtain Wall/Storefront,Other,[Bldg.Use --- --- 0.450 0.400 0.450 0.400 1 -Existing Operations Building] Window 4:Metal Frame Curtain Wall/Storefront,Other,[Bldg.Use --- --- 0.450 0.400 0.450 0.400 1 -Existing Operations Building] Window 5:Metal Frame Curtain Wall/Storefront,Other,[Bldg.Use --- --- 0.450 0.400 0.450 0.400 1 -Existing Operations Building] Window 6:Metal Frame Curtain Wall/Storefront,Other,[Bldg.Use --- --- 0.450 0.400 0.450 0.400 1 -Existing Operations Building] Window 7:Metal Frame Curtain Wall/Storefront,Other,[Bldg.Use --- --- 0.450 0.400 0.450 0.400 1 -Existing Operations Building] Window 8:Metal Frame Curtain Wall/Storefront,Other,[Bldg.Use --- --- 0.450 0.400 0.450 0.400 1 -Existing Operations Building] Window 9:Metal Frame Curtain Wall/Storefront,Other,[Bldg.Use --- --- 0.450 0.400 0.450 0.400 1 -Existing Operations Building] Window 10:Metal Frame Curtain Wall/Storefront,Other,[Bldg. --- --- 0.450 0.400 0.450 0.400 Use 1 -Existing Operations Building] Door 1:Glass(>50%glazing):Metal Frame,Entrance Door, --- --- 0.800 0.400 0.800 0.400 Entrance Door,Entrance Door,[Bldg.Use 1 -Existing Operations Building] Project Title:CWS Durham Conference Building Report date:05/16/17 Data filename:C:\Users\twheeler\Desktop\CWS PH2-O&M COM CHECK.cck Page 1 of 3 t Exterior Wall South:Steel-Framed,16"o.c.,[Bldg.Use 1 -Existing 21.0 7.5 0.059 --- 0.064 --- Operations Building] Floor:Slab-On-Grade:Unheated,[Bldg.Use 1 -Existing --- 7.5 0.560 --- 0.560 Operations Building] (a)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. In the following requirements,blank checkboxes identify requirements that the applicant has not acknowledged as being met.Checkmarks identify requirements that the applicant acknowledges are met or excepted from compliance. 'Plans reference page/section'identifies where in the plans/specs the requirement can be verified as being satisfied. Fenestration Product Rating: ❑ 1. U-factors of fenestration products(windows,doors and skylights)are determined in accordance with NFRC 100 by an accredited, independent laboratory,and labeled and certified by the manufacturer or are determined using the commercial size category values listed in Chapter 15 of the 2009 ASHRAE Handbook of Fundamentals,Table No.4 and shall include the effects of the window frame. The temporary label afixed to the fenestration products must not be removed prior to inspection. Exception(s): ❑ Site-built fenestration products shall have a single certificate specifying glazing type,special coatings,spacers,gas fills, center-of-glass and overall U-factor,and center-of-glass SHGC for every type of site built glass used.These certificates shall be maintained on the jobsite and made available to the inspector. Plans reference page/section: ❑ 2. Solar heat gain coefficient(SHGC)of glazed fenestration products(windows,glazed doors and skylights)shall be determined in accordance with NFRC 200 by an accredited,independent laboratory,and labeled and certified by the manufacturer or be determined using the Solar Heat Gain Coefficients(SHGC)in Chapter 15 of the 2009 ASHRAE Handbook of Fundamentals,Table No.10.The overall values must consider type of frame material and operator for the SHGC at normal incidence. Exception(s): ❑ Site-built fenestration products shall have a single certificate specifying glazing type,special coatings,spacers,gas fills, center-of-glass and overall U-factor,and center-of-glass SHGC for every type of site built glass used.These certificates shall be maintained on the jobsite and made available to the inspector. Plans reference page/section: Air Leakage, Insulation, and Component Certification: ❑ 3. Sealing of the building envelope.Openings and penetrations in the building envelope are sealed with caulking materials or closed with gasketing systems compatible with the construction materials and location.Joints and seams are sealed in the same manner or taped or covered with a moisture vapor-permeable wrapping material.Sealing materials spanning joints between construction materials allow for expansion and contraction of the construction materials. Plans reference page/section: ❑ 4. Window and door assemblies.The air leakage of window and sliding or swinging door assemblies that are part of the building envelope are determined in accordance with AAMA/WDMA/CSA 101/I.S.2/A440,or NFRC 400 by an accredited,independent laboratory,and labeled and certified by the manufacturer. Exception(s): ❑ Site-constructed windows and doors that are weatherstripped or sealed in accordance with Section 502.4.3. Plans reference page/section: ❑ 5. Curtain wall,storefront glazing and commercial entrance doors.Curtain wall,storefront glazing and commercial-glazed swinging entrance doors and revolving doors are tested for air leakage in accordance with ASTM E 283.For curtain walls and storefront glazing, the maximum air leakage rate is 0.3 cubic foot per minute per square foot of fenestration area.For commercial glazed swinging entrance doors and revolving doors,the maximum air leakage rate is 1.00 cfm/ft2 of door area. Exception(s): ❑ Requirement is not applicable. Plans reference page/section: ❑ 6. Building thermal envelope insulation.An R-value identification mark is applied(by manufacturer)to each piece of insulation 12 inches or greater in width.Alternately,the insulation installers have provided a signed,dated and posted certification listing the type, manufacturer and R-value of insulation installed. Refer to code section for blown or sprayed insulation installation/settling depths and marker requirements. ❑ 7. Insulation mark installation. Insulating materials are installed such that the manufacturer's R-value mark is readily observable upon inspection. ❑ 8. Insulation product rating.The thermal resistance(R-value)of insulation has been determined in accordance with the U.S. FTC R-value rule. ❑ 9. Installation.All material,systems and equipment are installed in accordance with the manufacturer's installation instructions and the International Building Code. Project Title: CWS Durham Conference Building Report date:05/16/17 Data filename:C:\Users\twheeler\Desktop\CWS PH2-O&M COM CHECK.cck Page 2 of 3 4. O 10.Outdoor air intakes and exhaust openings.Stair and elevator shaft vents and other outdoor air intakes and exhaust openings integral to the building envelope shall be equipped with not less than a Class I motorized,leakage-rated damper with a maximum leakage rate of 4 cfm per square foot at 1.0 inch water gauge when tested in accordance with AMCA 500D.Stair and shaft vent dampers shall be capable of being automatically closed during normal building operation and interlocked to open as required by fire and smoke detection systems. Exception(s): U Requirement is not applicable. Plans reference page/section: • 11.Loading dock weatherseals.Cargo doors and loading dock doors are equipped with weather seals to restrict infiltration when vehicles are parked in the doorway. Exception(s): O Requirement is not applicable. Plans reference page/section: u 12.Recessed lighting.Recessed luminaires installed in the building thermal envelope are sealed to limit air leakage between conditioned and unconditioned spaces.All recessed luminaires are IC-rated and labeled as meeting ASTM E 283.All recessed luminaires are sealed with a gasket or caulk between the housing and interior wall or ceiling covering. Exception(s): O Requirement is not applicable. Plans reference page/section: O 13.Vestibules.Doors that separate conditioned space from the exterior are protected with an enclosed vestibule,with all doors of the vestibule equipped with self-closing devices.Vestibules are designed so interior and exterior doors to not operate simultaneously. Exception(s): LI Doors not intended to be used as a building entrance door,such as doors to mechanical or electrical equipment rooms. ❑ Doors opening directly from a sleeping unit or dwelling unit. U Doors that open directly from a space less than 3000 sq.ft.in area. LI Revolving doors. O Doors used primarily to facilitate vehicular movement or material handling and adjacent personnel doors. LI Requirement is not applicable. Plans reference page/section: • 14.'Other'components have supporting documentation for proposed U-Factors. Exception(s): J Requirement is not applicable. Plans reference page/section: Section 3: Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed envelope system has been designed to meet the 2014 Oregon Energy Efficiency Specialty Code requirements in COMcheck Version 4.0.6.0 and to comply with the mandatory requirements in the Requirements Checklist. Name-Title Signature Date Project Title:CWS Durham Conference Building Report date:05/16/17 Data filename:C:\Users\twheeler\Desktop\CWS PH2-O&M COM CHECK.cck Page 3 of 3