Report (4) CE0DESIGN= FIELD REPORT
Page 1 of 1
GDI Project: Polygon-129-03 Prepared By: Kyle Hanson
Project Name: River Terrace East Date: May 25,2018
Location: SW Scholls Ferry&Roy Rogers,Bvrtn. Report#: 230
Arrival: 1100 Departure: 1130
Weather: Sunny,70's Permit#: TBD
Site Visit Requested By: Ken w/Polygon Met With(on site): Earthwork crew on site
Purpose: 6ubgrade observation,Lots 11:0412
Outstanding Issues: Proof roll road and curb base rock and repair as needed before paving
FR-58(12/06)-Decommission temporary storm and sewer lines through Tract E
FR-177-Soft fill from slope CUT in lots 153, 154 and 155
FR-223-Large roots/organic wooden debris within lot 165 subgrade
FR-226-Wooden debris within lot 104 footing subgrade
I observed subgrade for lots 107 through 112 where indicated on the attached site plan. Subgrade appeared to
generally consist of moist brown silt that was firm/unyielding underfoot. Approximately 2"of crushed rock granular
base had been placed over the observed subgrade area. I used a W diameter steel foundation probe to evaluate the
consistency of the subgrade material and observed probe penetrations indicated stiff to very stiff subgrade
conditions today.
Based on observations and probing,it is our opinion that the subgrade observed today,where indicated-on the
attached site plan,has been prepared in general accordance with our geotechnical recommendations.
Distribution:
Attachments:Site Plan(1)
Reviewed by: r/
/
spa report presents throughout
hoour the fordoed a plt rof our obsratve the of proarro erf ngour toe reseed Live.Our
gd ores mrirnudnwle supervision
service,or rets on the contra to comply witne the ems and
specifications duuughout tthe duration of the project irrespective of the presence of test represenptlue.Our vnric dors not include supervision direction theofcontractor,the contractor's employees
or agents.Our firm b not responsible for site safety.The field report is a DRAFT representation of our field observations,testing.and preliminary recommendations.The report can only be
considered final upon review of the Ceooesign project manager,as indicated by initials in Me'Aevowe-i ay'section
./ats I
Signature:
0
0
9450 SW Commerce Circle,Suite 300 I Wilsonville,OR 97070 1503.968.8787 I www.geodeslgninc.com
C - "RIVER TERRACE EAsr ‘t ii0,4 4
vi. ft c4,, •, ?-7ila..A st
Larlw
HUB AND TACK CERTIFICATION
NE & SE 1/4 SEC. 6, T 2 S, R 1 W, VV.M.
CITY OF 11GARD, WASHINGTON COUNTY, OREGON
SURVEYED APRIL 26, 2018
PREPARED OR:
POLYGON NORTHWEST COMPANY SW BIRDSONG STREET
703 BROADWAY ST., SUITE 510
VANCOUVER, WA. 98660
In
N
6' PUBLIC UTILITY
EASEMENT \
N89•58'43''W 53,00'
- - ----- -- ---- - -- -- - -- - - - - -- - - -- - - - - -
0 0• 4:)
.CY$
0'
SO, N (V ;
i---" ---
<
-Nt
01
. o b
6- 0) tri
00,__....... ,._ cb
LOT 5' 1,j LOT --.--11.00' LOT
109 *- 110 t.a. 171
I- a
— I— h
T-- ,
w 0 ..
z
0. 0
vx .
r;- 00
Z 0
13.
z
•
„12
f..)
REGISTERED '6) b
4) , PROFESSIONAL
o . cNi
LAND SURVEYOR 7 to
—•
I 1 \
...
..,
OREGON S89`58'43'T 53.00'
JULY 9,2002
...-
›,. TRAVIS C.JANSEN
(rii)
57751
=
..c,
0 RENEWS:6/30/2019
,--
I TRAVIS C. JANSEN, A REGISTERED PROFESSIONAL LAND SCALE
0 10 20
?at SURVEYOR ITHE STATE OF OREGON, HEREBY CERTIFY THAT 20
osa. I HAVE ACCURATELY SURVEYED AND STAKED THE OFFSETS
TO THE FOUNDATION ENVELOPE FOR LOT 110 OF THE PLAT 1 INCH = 20 FEET
OF "RIVER TERRACE EAST”,
i,"
2 f DRAWN BY: 12 DATE: 5/21/18 PACIFIC COMMUNITY DESIGN
REVIEWED BY. TCJ DATE: 5/21/18
, z PLANNING - ENGINEERING - SURVEYING
, k PROJECT NO.: 395-041
\,.. (503) 941-9484
1
L