Plans ry 1"> P17
Lot Area: 7205 sq ft / RGENEE
Bldg Cov: 2630 sq ft
Total impervious: 3000
coverage: 36 % / 42 % to- - 1-M u-iZ
Q w
_ JAN 2018
o>Ozw : � o
eater*mice
Q ;t - �• il-i_?Fi�{ltY
!Drainage'.�� 231 ,.... ,,.: �.. r 61.00' .111TH ■'�_�' '13G
'lilt fence) ....
--'4----232� -______—
- - - �—
230 — .�.. _ - - —
Wo
au+promo OREGON M117E OAK 1.l'CAL 232_'J
--_�-1�----
-0
— 234
C.)
T�-236
1Nu•/q�w'+ram �u7�tA t.s CAL /(/
• 37.78
r
41 aCommrwttd!!! PAC=DOGWOOD 1.5'CAL •
4
00 ■ 0
Tree protection
: 240 Covered 6
8 ■ Patio 240
I J
The project arborist has reviewed 5.00' : Grand FP 4 112.S 5.00'
this plan and certifies that the trees TYP. ■ Cantilever TYP.
and tree protection are accurately —■ I— �'1
ii4!
represented;tree protection ■ - —
measures are equal to or greater ■ (-
C
I ,,
than those on the approved tree ■ 3 3 C
protection plan,which remains I 8 2 Q C ()
applicable. ■ 241 FFE (...9 (13
■
I
® �� <J t)
JUS13 OA_
•
I N
1 ■I
■I 239 GFE N D
(13
Morgan Holen,Project Arborist I 24 o C 1 D. 4-/a)
�+ ,
■
ISA Board Certified Master Arborist, 240
III
n, fp •C
PN-6145B ii1 Q 0
ISA Tree Risk Assessment Qualified \ ■
Date:January 18,2018 (20.5'1 SS SD ori
cy
iiO
235 I
- - - - - 238 Ct - - ''��
\ 61.00 In
(NORTHiltilarasaismir __
)
/ REDB, RY7\:::::;) • )---
COU ' 1
20 0 10 20 40 PLOT PLAN NOTES:
Inimminimmil #0..i....= 1. BASED ON SURVEY INFORMATION RECEIVED ON 11-29-2017.
2. PLOT PLANS SUBJECT TO CHANGE BASED ON FINAL PLAT.
1 inch = 20 ft. 3. UTILITIES SHOWN BASED ON PRELIMINARY CONSTRUCTION PLAN. ),
1(..:
MINIM sae
MAIM TM mlall
Riverside Homes, LLC a ENGINEERS Progress Landing N0399
17933 NW Evergreen Pkwy
Beaverton,Oregon 97006 n engineering Lot 07
503-645-0986 III &Planning 0161111010
"^
3409 RW John Olsen Place 112032 SW Redberry Court 1
MYlsbmo,OR 97124 OP
503 6014401 50360144024a1 1
RobertC, Plotted: Jan 05, 2018 — 11:58am, P:\N0399\dwg\Eng\Plat Plots\01-05-2018\N0399—Progress Landing 07.dwg
Lot Area: 7205 sq ft '' ir ..,
SETBACK LINE
Bldg Cov: 2630 sq ft , ' 61.00' I (TYP.)
Total impervious: 3000
34
coverage: 36 % / 42 % totalEM7411.1.
rater service ,
Ma I I
Drainage _.-_� >30(q- 1,— r
D p i
silt fence ...e KZ-0JD� Em
;E 0 j� 137.781 •
—Im I i
I i.III I
•
Q.rcu,g onoal
('1011 lE ��( 1.5 CAL
1 Ka
•
• 240 " � al
al
— (NI ■ CoveredI r 6
W, CCrclalbhylus dhponkvrn KA1SURA 1.5'CAL c I U Patio 240
■ �--112.5�
5.00' ■ Grand FP 5.00'
TYP. ■ Cantilever TYP.
■ i—
l • J Coma nuttdlp PACg1C DOGWOOD 1.5' CAL ■ —
■ 3382
The project arborist has reviewed this plan and ■
certifies that the trees and tree protection are ( I 241 FFE m W
accurately represented;tree protection I■
measures are equal to or greater than those on ■
the approved tree protection plan,which 111P .
remains applicable. y41
■ ■II
I 1 'i 239 GFE
I: II-yyl 7fr, f. 41-.44-,_ ■
a0 24 ■ 240
N.
Morgan Holen,Project Arborist I ■ SS SD o n
ISA Board Certified Master Arborist,PN-61458 \__ ■1 „7,-,..7,2 '-
ISA Tree Risk Assessment Qualified ■ � N
235■ o w
Date:December 12,2017 , ,,� — — r — — —
61. ' — — 2388
NORTH 61.00'
7\::::::;7 N."••••••..„......____
REDBERRY COUR I';.
20 0 10 20 40
mi1
iiii
1 inch = 20 ft. PLOT PLAN NOTES:
CITY OF TIGARD 1. BASED ON SURVEY INFORMATION RECEIVED ON 11-29-2017.
Approved by Nanning 2. PLOT PLANS SUBJECT TO CHANGE BASED ON FINAL PLAT.
Date: /r,2///1 R- 3. UTILITIES SHOWN BASED ON PRELIMINARY CONSTRUCTION PLAN.
wnitiala: LS
Mama we
AS sal. dor.
Riverside Homes, LLC I ENGINEERS Progress Landing N0399
17933 NW Evergreen Pkwy
Beaverton,Oregon 97006Engineering Lot 07
503-645-0986 • I.&Planning DRAM
"a
3409 NW John OlsenFace 112032 SW Redberry Court' 1
Hillsboro,09 9]124 or
503 9014401 503 9014402 fax
1
RobertC, Plotted: Dec 01, 2017 — 12:49pm, P:\N0399\dwg\Eng\Plat Plots\11-30-2017\N0399—Progress Landing 07.dwg
� w
11 December 2017
Craig Schuck,VP
Niki Munson
Riverside Homes LLC
17933 NW Evergreen Parkway,#370
Portland,OR 97006
Re: Geotechnical Construction Observation summary report for Progress Landing,
12 lots in Tigard Oregon
Dear Mr. Schuck and Ms.Munson,
Rapid Soil Solutions (RSS) is pleased to submit this geotechnical construction observations
summary report for Progress Landing Subdivision project located in Tigard, Oregon. The
purpose of this report is to summarize RSS's on-call geotechnical observation and testing
services for infrastructure, roadway, and residential lot construction between the dates of
September 2017 to November 2017.
The subject property is located off of SW 135th Avenue just south of the intersection of SW
Morning Hill Drive. The jurisdictional regulatory agency for the subject site is Washington
County,Oregon.
Construction Observation Methods and Techniques
RSS and ACS Testing performed geotechnical testing services for the site improvements
construction phase of the project as requested on an on-call basis. This summary report is based
upon construction monitoring, QA/QC oversight of fill placement activities, and analytical
laboratory,nuclear gauge density.
Nuclear gauge density testing was performed during construction in accordance with ASTM
D6938 to document placement of structural lot fill, utility trench backfill, road fill, and asphalt
concrete. Nuclear gauge testing consists of measuring the density and moisture content of in-
place construction materials compared to the theoretical maximum density determined by the
Proctor moisture-density test or Rice density test. Project construction specifications, as
indicated on the approved civil plans, require achieving at least 95 percent relative compaction
for soil and aggregate and 91 percent relative compaction for asphalt concrete.
General Information and structural fill placement
As indicated on the grading plans produced by NW Engineers the Subdivision is a single-family
residential project consisting of 12 building lots, asphalt-paved roadways, underground utility
infrastructure, and storm water management facilities. The only lots of have fill placed upon
them were 5-9 and 10,12 where ACS Testing. Those test results have been sent before and
results were achieved with proof rolls and compaction tests. Topsoil was observed to have been
placed on lots following site improvements construction. The front portion of lots at the site may
contain soft soil resulting from excavation and backfill of power and communication utility
trenches. Bearing capacity of the lots are 1,500 psf.
Rapid 1
SoilSolwtionalc
503-816-3689 mia@rapidsoilsolutions.com
r .
Remaining Lots
RSS did not observe or test structural fill placed on remaining lots located within the
limits of subdivision. These lots were either cut below original grade or exist in their
approximate preconstruction state. These lots may be covered with a layer of organic
topsoil spread after construction. If evidence of undocumented fill or previously disturbed
soil is discovered during future foundation excavation, sub-grade assessment should be
conducted by a licensed geotechnical engineer or designated representative prior to footing
construction.
Utilities and Roads
RSS tested trench backfill for storm, water, and sanitary sewer utility infrastructure in
accordance with project plans and specifications. RSS also tested structural fill, crushed
aggregate base, and asphaltic concrete placed in proposed roadway alignments. Test
results generally met project specifications at locations and dates tested.
Recommendations
RSS's construction monitoring indicates future individual home construction is
compatible with tested soil conditions, provided the recommendations outlined below are
followed:
• Residential footings for all lots should extend through the topsoil/strippings layer or
soft surface soils and bear upon firm native soil or engineered structural fill. The estimated
bearing capacity for footings founded on soils as described above is 1,500 psf. Footings
should be embedded at least 18 inches below lowest adjacent exterior grade to increase
overburden resistance and reduce potential frost heave. Wet-weather foundation
construction will likely require sub-grade over-excavation and backfill with compacted
crushed aggregate.
• If fill placement is proposed or necessary to raise foundation subgrade elevations to
desired finished grades, RSS should provide verification of adequate subgrade support
conditions before fill placement, and conduct testing of structural lot backfill prior to
residential construction.
• Competent bearing surface and foundation support is recommended beneath
structural appurtenances (i.e.,driveways, patios, slabs, sidewalks, deck posts, etc.)to limit
potential cracking or damage.
• Residential structures should be provided with adequate foundation and crawl space
drainage. Failure to provide adequate drainage may result in unanticipated foundation
settlement, soil sloughing, or erosion. Drainage implementations may require future
monitoring and periodic modification to maintain functionality and efficiency.
• Finished grade for all lots should provide positive drainage away from structures.
Depressions or areas with potential to retain ponding surface water should be avoided.
• Some total and differential settlement of finished residential structures may be
expected. Most settlement is likely to occur during or soon after construction, but some
RaPid
SoilSolvti Lic 503-816-3689 mia@rapidsoilsolutions.com
long-term settlement is possible.
Conclusions and Limitations
Based on our observations and density testing of earthwork construction, it is our opinion that
earthwork grading was performed in general accordance of the approved engineering plans. It
should be noted that we were present only on a part time basis during construction operations, but
observed and tested periodically in accordance with Washington County Standards.
If you have any questions concerning our geotechnical services or materials testing, please contact
the undersigned at 503-816-3689.
Thank you,
40011 pRoft,
eikEtt
I19244i"E
Na
OREGON
EXP EB: -- '/
Mia Mahedy-Sexton,PE GE
Rapid
SoilSo1 LLC 503-816-3689 mia@rapidsoilsolutions.com
SP11.11.T
DATE: Sep 13,2017 ACS Testing,Inc
01..CRETE 7409 SW Tech Center Dr,Suite 145
PAGE 1 OF: 1 Tigard,OR 97223
OILS
TESTICG.!.\'C
Phone:503-443-3799 Fax:503-620-2748
503.443.3799 DAILY ASPHALT COMPACTION / IN PLACE SOIL DENSITY
(NUCLEAR METHOD)Asphalt ASTM D2950/Soil Density ASTM D6938 AASHTO T310
RAPID SOIL SOLUTIONS PROGRESS LANDING
3915 SW PLUM STREET 12050 SW 135TH AVE
PORTLAND,OR 97219-6018 TIGARD,OR 97223
Jurisdiction TIGARD
Permit#: N/A
INSPECTOR/CERT Cameron Ingersoll ODOT#49382 17-6962-24
ACS Job#
WEATHER
r OVERCAST f7 SUNNY r RAIN SOIL TEST METHOD:D 199 ❑D698 01180 ❑D1557
AGG: r 3/4"-r 1-1/2"- OTHER: CPN f— 8510 r 8036 r 8022 r 8021
rg NATIVE TYPE: Light Brown Silt r 8037 r 8658 r 8237 r 8511 r 7781
SUPPLIER: Existing TROXLER r 2064617 38579 r 38580 r 30560
CONTRACTOR LCD
ALL GAUGES CALIBRATED BY ODOT
r C MIX r B MIX r LEVEL II r LEVEL III
TEST MODE: ❑BACKSCATTER ❑X DIRECT go DEPTH STANDARD COUNT:
OPT.MOISTURE: 18.9 1) 642 2) 2250
RICE OR PROCTOR 10212 MAX.DRY DENSITY: 103.6 % OF DENSITY REQ. 95
TEST NO. LOCATION %MOIST. LIFT OR ELEV. DEPTH DENSITY.LBS %MAX DENSITY
1 Lot 4 13.6 El:240.3 8" 103.3 100
2 Lot 3 12.8 El:240.3 8" 103.7 100
3 Lot 10 15.4 El:229.15 8" 102.2 99
4 Street A 15.0 Subgrade 8" 101.0 97
5
6
7
8
9
10
11
12
13
RESULTS GIVEN TO: Robert Hem with LCD
COMMENTS:
Tests taken on existing native for roadway and lot fill.Proof roll performed using a fully loaded water truck.No deflection or yielding
observed.
Reviewed by: ` Date:Sep 14,2017 CC Mia Mahedy-Sexton
7, DOUG 4"•U L/VP Operations
ACCREDITED DE/KB
CS•I06J
:PHUT ACS Testin
DATE: Sep 15,2017 g,Inc
41111w oNcRETE 7409 SW Tech Center Dr,Suite 145
PAGE 1 OF: 1 Tigard,OR 97223
OILS
TESTI.,•(:.I:VC Phone:503-443-3799 Fax:503-620-2748
503.443.3799 DAILY ASPHALT COMPACTION I IN PLACE SOIL DENSITY
(NUCLEAR METHOD)Asphalt ASTM D2950/Soil Density ASTM D6938 AASHTO T310
RAPID SOIL SOLUTIONS PROGRESS LANDING
3915 SW PLUM STREET 12050 SW 135TH AVE
PORTLAND,OR 97219-6018 TIGARD,OR 97223
Jurisdiction TIGARD
Permit#: N/A
INSPECTOR/CERT Luis Cortez ODOT#42838 17-6962-24
ACS Job#
WEATHER r OVERCAST 17 SUNNY r- RAIN SOIL TEST METHOD:O T99 01)698 0T180 0D1557
AGG: r 3/4"-(— 1-1/2"- OTHER: CPN r- 8510 I— 8036 r- 8022 r- 8021
(X NATIVE TYPE: Brown Silty Clay r 8037 r 8658 r 8237 r- 8511 r 7781
SUPPLIER: TROXLER 17 20646 r 38579 r- 38580 r- 30560
CONTRACTOR LCD
unix (— B MIX ALL GAUGES CALIBRATED BY ODOT
(—
r LEVEL II r- LEVEL III
TEST MODE: OBACKSCA I tER D DIRECT Bra DEPTH STANDARD COUNT:
OPT.MOISTURE: 18.9 1) 2039 2) 666
RICE OR PROCTOR 10212 MAX.DRY DENSITY: 103.6 % OF DENSITY REQ. 95
TEST NO. LOCATION %MOIST. LIFT OR ELEV. DEPTH DENSITY.LBS %MAX DENSITY
1 Lot 5 16.4 El:239.30 8" 105.0 101
2 Lot 6 17.8 El:239.70 8" 100.0 97
3
4
5
6
7
8
9
10
11
12
13
RESULTS GIVEN TO: Matt Sly with LCD
COMMENTS:
Native fill for lots 5&6.A proof roll passed with loaded water truck.
Reviewed b C� Mia Mahedy-Sexton
Y: Date:Sep 18,2017
DOUG E , IVEL Operations
ACCREDITED DE/KB
ACS-1004
ACS Testing,Inc
Page 1 of 1 7409 SW Tech Center Dr.,Suite 145
srvr,cr Tigard,OR 97223
41111=0.%CIL Phone:503-443-3799 Fax:503-620-2748
DAILY SOILS REPORT Job# 17-6962-24
n:crus,rrr
503.443.3799
Date:Sep 18,2017 Permit# n/a
Mail To: Project:
RAPID SOIL SOLUTIONS PROGRESS LANDING
3915 SW PLUM STREET 12050 SW 135TH AVE
PORTLAND,OR 97219-6018 TIGARD,OR 97223
Inspector: John Meyer#50256 Weather: Overcast
Contractor: LCD Temperature: 52
Field Inspection:
ACS representative arrived on-site to review and probe native soil around and inside footing on West side of project
to contain cast in place walls for storm sewer.No deflection noted.Material appears to be tightly compacted despite
wet conditions. Proof roll inaccessible due to depth of pit and dimensions.
Results were given to/testing conducted for Roger Mern with LCD,on-site.
Our reports pertain to the material tested or inspected only.Information contained herein is not to be reproduced except in full,
without prior written authorization from this office.
Reviewed ate: 9/192417 Mia Mahedy-Sexton
DE/KBDo Es nivel,VP
\t'S-lis>.: ACCREDITED
CAL?ORTLANDT
09/21/2017
CONCRETE STRUCTURES LLC
PROJECT: PROGRESS LANDING
The enclosed concrete mix designs are being submitted for use on the above project. All mix designs are designed
based on specification information provided. These mix designs will be produced in conformance with applicable
codes and specification and shall be tested in accordance with ASTM,AASHTO,ODOT and/or WSDOT procedures.
ASTM C94 Section 4.6 states"...The purchaser shall ensure that the manufacturer is provided copies of all reports
of tests performed on concrete samples...Reports shall be provided on a timely basis."In accordance with the
specification,approval of these mix designs carries with it CalPortland's inclusion on the distribution list for all
concrete test reports.
ACI 301 16.7.4.3 states"to facilitate testing and inspection,the contractor shall provide and maintain for the sole
use of the testing agency adequate facilities for safe storage and proper curing of concrete test specimens on the
project site for the first 24 hours as required by ASTM C31." CalPortland does not guarantee field cured
cylinders. Proper curing for early strength is the responsibility of the contractor.
The cement used on this project will conform to ASTM C150,AASHTO M85,and are approved per ODOT and/or
WSDOT Standard Specifications.
Pozzolanic materials used on this project will conform to ASTM C618,AASHTO M295,and are approved per ODOT
and/or WSDOT Standard Specifications.
Ground Granulated Blast Furnace Slag used on this project will conform to ASTM C989,AASHTO M302,and are
approved per ODOT and/or WSDOT Standard Specifications.
Aggregates used on this project will conform to ASTM C33 and are approved per ODOT and/or WSDOT Standard
Specifications.
Air-entrainment used on this project will conform to ASTM C260 and are approved per ODOT and/or WSDOT
Standard Specifications.
All other chemical admixtures used on this project will conform to ASTM C494 and are approved per ODOT and/or
WSDOT Standard Specifications.
When ordering concrete,it is the customer's responsibility to order the approved mix number for the project and
application. When ice,hot water,accelerator,retarder,or high-range water reducer is needed to meet project
specifications,it is the contractor's responsibility and cost to order the proper materials.
CalPortland mix designs(strength,slump,air,and unit weight)are based on testing at the truck discharge per
ASTM standards. CalPortland will not be responsible for these plastic and hardened qualities due to pumping or
other methods of conveying.
If you have any questions please contact,Greg Hendrix at in our Technical Services Department.
CAL 'ORTLAND*
Concrete Design Submittal Summary
09/21/2017
To: CONCRETE STRUCTURES LLC
RE: PROGRESS LANDING
Thank you for the opportunity to provide materials for this project. The mixes chosen for this submittal
were based on the documents provided by and conversations had with the requesting party.
The mixes below have been included with this submittal for your review:
Mix Use Slump Air W/CM
1443FS FOOTINGS&WALLS 6"+/-1" 1.5% 0.42
4000/4500 PSI WITH MR
Concrete mix designs are submitted to meet project specifications. Acceptable material performance is
based on proper testing and protection of concrete and concrete samples.Concrete mix design
ingredients may be adjusted to maintain yield,consistency and performance. Similar materials,with
proven performance, may be substituted at the supplier's discretion.Concrete will be batched in
accordance with the applicable portions of the ASTM C94 standards unless otherwise agreed upon.
Additional Project Submittal Information:
Sincerely,
Greg Hendrix
ghendrix@calportland.com
This submittal contains proprietary,confidential,and legally privileged information.Disclosure,copying,and distribution
without express written permission are strictly prohibited.
I
C? Newberg
2808 NE Wynooski Road
Newberg,OR 97132
CALPORTLAND'
Concrete Mix Submittal
Submittal Information Mix Information
Submittal Name PROGRESS LANDING Mix ID 1443FS
Date Submitted 09/21/2017 Mix Name 4000/4500 PSI WITH MR
Customer CONCRETE STRUCTURES LLC Compressive Strength(f'c) 4000 psi @ 28 Days
Project Name PROGRESS LANDING Flexural Strength(f s)
Contract ID Aggregate Nominal Size 3/4"(19mm)
Project Location Air Entrained0
Use FOOTINGS&WALLS
Mix Properties
Slump 6"+/-1" Sack Content 6.66 94 lb/sack Total Mass 3975.8 lb
Air 1.5% Total Water 31.17 gal Total Volume 27.00 ft3
W/CM Ratio 0.42 Water/Sack 4.68 gal Unit Weight 147.25 Ib/ft3
Specific Mass Volume
Group Material Description Supplier Absorption Gravity lb ft3
Cement Portland Type I/II CALPORTLAND 3.15 532 2.707
CEMENT
Additive Slag Ash Grove 2.89 94 0.521
DURA SLAG
Aggregate Coarse Aggregate WINDSOR ISLAND 2.3 2.6 1850 11.403
3/4"-#4 ROUND ROCK\C-67 ROCK-#24-038-2
DRUW:105.6
Fine Aggregate WINDSOR ISLAND 3 2.54 1236 7.798
Concrete Sand ROCK-#24-038-2
DRUW:105.4 Ib/ft3
Water Potable Water CITY OF NEWBERG 1 260 4.167
WATER-1
Admixture Water Reducer Mid Range GCP Applied 1 3.910
DARACEM 55 MRWR Technologies
Dosage:60 fl oz/yd3
Air Air 0.405
Contact Greg Hendrix
Email ghendrix@calportland.com
03
CAL?ORTLAND®
Concrete Mix Evaluation Report
ACI 318 Required Average Strength
Mix ID 1443FS Number Of Tests 30
Mix Name 4000/4500 PSI WITH MR Average Strength 6169 psi
Design Strength(f'c) 4000 psi @ 28 Days St Dev 586 psi
Required Strength(f'cr) 4870 psi @ 28 Days
Comp Acceptance
Temp Air Strength Strength Moving
(Concrete) Slump Content (7-Day) (28-Day)Average
Test Date Mix Laboratory (°F) (in) (%) (psi) (psi) (psi)
12/07/2016 1443FS Carlson Testing 68 5 1.8 4330 6420
Lab
12/07/2016 1443FS CP 80 7.5 2 4750 6480
12/07/2016 1443FS CP 81 6.75 2.1 4290 6190 6363
12/08/2016 1443FS Carlson Testing 49 6 1.3 5010 5920 6197
Lab
12/08/2016 1443FS Carlson Testing 49 8 1 4540 5250 5787
Lab
12/13/2016 1443FS Carlson Testing 77 6.75 1.4 3810 6200 5790
Lab
12/13/2016 1443FS Carlson Testing 73 6.75 1.5 4140 6460 5970
Lab
12/15/2016 1443FS Carlson Testing 65 6 1.6 4690 5910 6190
Lab
12/16/2016 1443FS Carlson Testing 65 6.75 1.3 4210 6490 6287
Lab
12/21/2016 1443FS Carlson Testing 69 6 1.5 3610 5660 6020
Lab
12/27/2016 1443FS Carlson Testing 73 6 1.8 3830 5480 5877
Lab
12/28/2016 1443FS Carlson Testing 73 6 2.2 5430 6880 6007
Lab
12/29/2016 1443FS Carlson Testing 65 6.5 1.3 4520 6380 6247
Lab
01/09/2017 1443FS Carlson Testing 57 6 1.8 4930 7580 6947
Lab
02/17/2017 1443FS Carlson Testing 66 6.25 2.3 4330 5870 6610
Lab
02/20/2017 1443FS Carlson Testing 52 6.75 1.6 4890 6600 6683
Lab
02/22/2017 1443FS Carlson Testing 64 4.5 1.3 4350 6300 6257
Lab
02/23/2017 1443FS Mayes Testing Lab 66 4.5 4860 7480 6793
02/27/2017 1443FS Mayes Testing Lab 63 6.25 4050 6140 6640
02/28/2017 1443FS Carlson Testing 69 5 1.6 3740 6450 6690
Lab
03/04/2017 1443FS Carlson Testing 58 6.5 3 5590 6060
Lab
03/04/2017 1443FS Carlson Testing 66 5.25 2.8 5800 5947
Lab
03/06/2017 1443FS Mayes Testing Lab 58 4.75 4640 6700 6030
04/04/2017 1443FS Carlson Testing 60 7 1.9 4540 6290 6263
Lab
04/25/2017 1443FS Carlson Testing 68 6 1.3 4520 6490 6493
Lab
04/25/2017 1443FS Mayes Testing Lab 66 6.5 5 3970 5230 6003
05/01/2017 1443FS Carlson Testing 65 4.75 1.9 4330 5540 5753
Lab
05/05/2017 1443FS Carlson Testing 70 5 1.8 4180 6090 5620
CAL?ORTLAND®
Concrete Mix Evaluation Report
ACI 318 Required Average Strength
Mix ID 1443FS Number Of Tests 30
Mix Name 4000/4500 PSI WITH MR Average Strength 6169 psi
Design Strength(f'c) 4000 psi @ 28 Days St Dev 586 psi
Required Strength(f'cr) 4870 psi @ 28 Days
Comp Acceptance
Temp Air Strength Strength Moving
(Concrete) Slump Content (7-Day) (28-Day)Average
Test Date Mix Laboratory (°F) (in) (%) (psi) (psi) (psi)
Lab
05/19/2017 1443FS Mayes Testing Lab 55 5.5 1.5 3940 6090 5907
07/19/2017 1443FS Carlson Testing 82 6.25 1.7 3530 5110 5763
Lab
C1111
CAL?ORTLAND®
Combined Aggregate Blend Report
Mix ID 1443FS Nominal Max Size 3/4"(19mm)
Mix Name 4000/4500 PSI WITH MR Aggregate Volume 19.2
Design Strength(t'c) 4000 psi @ 28 Days Coarse Aggregate%
59.4
Fine Aggregate% 40.6
%Passing Gradations
Aggregate Type Coarse Fine
%Contribution 59.4 40.6
3/4"-#4 ROUND
Sieve/Test Spec Result ROCK\C-67 Concrete Sand
1"(25mm) 100.0 100.0 100.0
3/4"(19mm) 97.6 96.0 100.0
1/2"(12.5mm) 66.7 44.0 100.0
3/8"(9.5mm) 53.6 22.0 99.9
#4(4.75mm) 40.7 1.0 98.7
#8(2.36mm) 31.8 0.1 78.2
#16(1.18mm) 26.1 0.1 64.1
#30(0.6mm) 20.9 0.1 51.2
#50(0.3mm) 10.0 0.1 24.4
#100(0.15mm) 2.1 0.1 5.1
#200(75pm) 0.51 0.10 1.10
Pan 0.00 0.00 0.00
100
80
co
00Go
a
40
20- 4
0 -, II . I . I Ill I � II r I' I I . iII I`
° V TO 3 CO IPv TIP at
Sieve Opening(mm)
D10(ES):0.30 D30:1.89 D50:7.82 D60:10.85 D1S/D85:0.03 Cu:36.11 Cc: 1.10
CI?
1050 N River St
CALPORTLAN D" Portland,OR 97227
Ph#503 335-2600
Certificate of Analysis F#503 331-3700
Source: Ssangyong,So Korea
We hearby certify that CalPortland(Lot#17-196)Type UII Low Alkali cement meets the standard requirements of
ASTM C 150 for Type I and Type II low alkali cement.Additionally CalPortland Type I/H Low Alkali cement meets
the requirements of AASHTO M-85 for Type UII cement. Following are the chemical and physical testing results of this cement.
ASTM C-150 Requirements
Chemical Requirements Additional
Lot# 17-196 Champion Bay Type I Type II Results Data
Requirements Requirements Limestone
Silicon dioxide(Si02) --- --- 19.7 7.8
Aluminum oxide(A1203),max.% --- 6.0 4.8 3.1
Ferric oxide(Fe203),max.% --- 6.0 3.4 1.4
Calcium Oxide(CaO) --- --- 63.2 46.1
Magnesium oxide(MgO),max.% 6.0 6.0 2.5 3
Sulfur trioxide(S03),max.% 3.0 3.0 3.8 0.0
Loss on ignition,max.% 3.5 3.5 1.7
Insoluble residue,max.% 1.5 1.5 0.33 Base
Alkalies(Na20+0.658 K20),max.% 0.60 0.60 0.55 Cement
Tricalcium silicate(C3S)% --- --- 60 62
Dicalcium Silicate(C2S)% --- --- 10 11
Tricalcium aluminate(C3A),max.% --- 8 7 7
Tetracalcium aluminoferrite(C4AF) % --- --- 10 11
%CO2 --- --- 1.1
%CaCO3 in limestone min. 70 70 86
%Limestone max. 5.0 5.0 2.8
Physical Requirements
Air content of mortar,max.% 12 12 8
Passing 45 urn(#325)sieve% --- --- 97
Blaine Fineness,min ml/kg 260 260 408
Autoclave expansion,max.% 0.80 0.80 0.02
Compressive strength psi,Mpa,min.
1 Day psi --- --- 2480 psi
MPa --- --- 17.1 MPa
3 Day psi 1740 1450 4175 psi
MPa 12 10 28.8 MPa
7 Day psi 2760 2470 5015 psi
MPa 19 17 34.6 MPa
28 Day psi --- --- 6380 psi
MPa --- --- 44.0 MPa
Vicat set in minutes 45 to 375 45 to 375 130
*C-1038 expansion limit if S03>3.0% 0.020% 0.010
Date July 18,2017
10
Director of Tec al Services
Pacific NW and Canada Cement Division
Y
ASH GROG
Location Portland Slag Product Dura Slag Date 8-Feb-17
Certification No. Slag 4-16
STANDARD REQUIREMENTS
ASTM C989&AASHTO M302
CHEMICAL PHYSICAL
Spec. Test Spec. Test
Item Limit Result Item Limit Result
Slag Slag
Sulfide sulfur as S(%) 2.5 max 1.12 %Retained 325 mesh 20 max 2.9
Blaine fineness(m2/kg) A 415
Air Content of Slag Mortar(%) 12 max 4.1
Specific Gravity A 2.89
Reference Cement Reference Cement
Total Alkalies(%) 0.60 min 0.77 %Passing 325 mesh A 92.0
0.90 max Blaine fineness(m2/kg) A 361
Potential(%) Compressive strength MPa(PSI) min:
C3S A 60 7 Days A 33.3(4830)
C2S A 12 28 Days 35(5000) 41.6(6030)
C3A A 7
C4AF A 8 50-50 Blend of Slag and Reference Cement
C4AF+2(C3A) A 22 Compressive strength MPa(PSI) min:
C3S+4.75(C3A) A 93 7 Days A 29.2(4230)
28 Days A 49.7(7210)
Slag Activity Index
Grade 120 min:
Average of Last 5 Samples 7 Days A 88
Any Individual Sample 7 Days A 86
Average of Last 5 Samples 28 Days 115 120
Any Individual Sample 28 Days 110 116
ANot applicable
The Ground Granulated Blast-Furnace Slag meets the chemical and physical requirements
of the ASTM C989/C989M-14 and AASHTO M 302-13 specifications for Grade 120.
Signature: Title: Chief Chemist
Edward C.Rafacz
3801 E Marginal Way S,Seattle,WA 98134; Ph:(206)623-5596; Fax:(206)623-5355
PRODUCT DATA SHEET ��� gcp applied technologies
DARACEM® 55
Mid-range water-reducing admixture
ASTM C494 Type A and F
Product Description
Daracem® 55 is a mid-range water reducer specifically formulated to produce concretes with dramatically
enhanced finishing characteristics and normal setting times. Effective through a wide addition rate range,
Daracem 55 combines the benefits of normal and high-range water reducers allowing for the ultimate
control of the concretes placing and finishing properties.
Daracem 55 is an aqueous solution of complex organic compounds, each of which contributes uniquely
to the concretes final properties. It contains both patented dispersing and finishability agents that provide
performance superior to conventional water-reducing products. Daracem 55 is also formulated with
a catalyst which promotes more complete hydration of Portland cement to assure superior strength
performance. It is manufactured under rigid controls which provide uniform, predictable performance.
Daracem 55 contains no calcium chloride. Daracem 55 is supplied as a dark brown, low viscosity liquid,
weighing approximately 10.7 lbs/gal (1.28 kg/L).
Uses production at higher slumps with better water retention and
internal cohesiveness, providing a less "sticky' concrete with
Daracem® 55 produces a concrete with lower water content, improved placement properties.Formulated with proven finishing
improved placement properties and enhanced finishability.It yields enhancing components, Daracem 55 controls bleeding while
a less permeable and more durable concrete. Daracem 55 is used bringing the mortar to the surface.Finishers have stated that the
in ready-mix,job site and concrete paving plants for normal and concrete has improved trowelability.The influence of Daracem 55
lightweight concrete, in block and precast. It imparts a"slickness" on the finishability of lean mixes has been particularly noticeable.
to the surface of the concrete making it most appropriate for Floating and troweling, by machine or by hand, easily imparts a
concrete flatwork as well as slip form work. Daracem 55 is also smooth,close tolerance surface with less machine time and labor.
particularly effective in lean or fly ash and slag compensated mixes. • Neutral setting times
Formulated with a set control agent,Daracem 55 provides normal
Advantages setting characteristics throughout its addition rate range. This
Daracem 55 offers significant advantages over conventional water allows for increased water reduction and increased slump without
reducers.Field work has consistently demonstrated: significantly extended setting times. It also allows the flexibility
to vary addition based on specific job and weather requirements.
• Ultimate workability and finishability
The exceptional water-reducing capabilities allow for concrete ' Superior strength performance
The water reduction properties, up to 12`Yo, and dispersion
characteristics allow the production of lower water to cement
ratio concretes and more complete hydration. The combined
Product Advantages effect is increased compressive and flexural strengths at all ages.
• Ultimate workability and finishability
Addition Rates
• Neutral setting times
• Superior strength performance The addition rate range of Daracem 55 is 3 to 15 fl oz/100 lbs
(190 to 980 mL/100 kg)of cement.Typically excellent results are
achieved between 5 to 7 fl oz/100 lbs (325 to 460 mL/100 kg) .
of cement. Optimum addition depends on the other concrete
mixture components, job conditions and desired performance
characteristics.
Compatibility with Other Admixtures and Dispensing Equipment
Batch Sequencing
A complete line of accurate, automatic dispensing equipment is
Daracem 55 is compatible with most GCP admixtures as long as available. Daracem 55 may be added to the concrete mix on the
they are added separately to the concrete mix. In general, it is sand or in the batch water.
recommended that Daracem 55 be added to the concrete mix near
the beginning of the batch sequence but after the cement and water Specifications
are combined for optimum performance.Different sequencing may
be used if local testing shows better performance.Please see GCP Concrete shall be designed in accordance with Standard
Technical Bulletin TB-0110, Admixture Dispenser Discharge Line Recommended Practice for Selecting Proportions for Concrete,ACI
Location and Sequencing for Concrete Batching Operations for 211.
further recommendations. The water-reducing admixture shall be a mid-range water-reducing
Pretesting of the concrete mix should be performed before admixture such as Daracem 55 as manufactured by GCP Applied
use, as conditions and materials change in order to ensure Technologies, or its equivalent. The admixture shall not contain
compatibility, and to optimize dosage rates, addition times in the calcium chloride. It meets the requirements of Specification for
batch sequencing and concrete performance. For concrete that Chemical Admixtures for Concrete ASTM Designation C494 as a
requires air entrainment,the use of an ASTM C260 air-entraining Type A and Type F admixture. Certification of compliance shall be
agent(such as Daravair'or Darex'product lines) is recommended made available on request.The admixture shall be considered part
to provide suitable air void parameters for freeze-thaw resistance. of the total mixing water.
The admixture shall be delivered as a ready-to-use liquid product
Packaging & Handling and shall require no mixing at the batching plant or job site.
Daracem 55 is available in bulk, delivered in metered tank trucks
and drums.
Daracem 55 contains no flammable ingredients. It will freeze at
approximately 15°F (-9°C) but will return to full strength after
thawing and thorough mechanical agitation.
gcpat.com I North America Customer Service: 1-877-4AD-MIX1 (1-877-423-6491)
We hope the information here will be helpful.It is based on data and knowledge considered to be true and accurate,and is offered for consideration,investigation and verification by the user,but we do
not warrant the results to be obtained.Please read all statements,recommendations,and suggestions in conjunction with our conditions of sale,which apply to all goods supplied by us.No statement,
recommendation,or suggestion is intended for any use that would infringe any patent,copyright,or other third party right.
Daracem,Daravair and Darex are trademarks,which may be registered in the United States and/or other countries,of GCP
Applied Technologies Inc.This trademark list has been compiled using available published information as of the publication
• date and may not accurately reflect current trademark ownership or status.
4
O Copyright 2016 GCP Applied Technologies Inc.All rights reserved.
GCP Applied Technologies Inc.,62 Whittemore Avenue,Cambridge,MA 02140 USA.
In Canada,294 Clements Road,West,Ajax,Ontario,Canada L1S 3C6.
GCP0083 DW-12-1216 gcp applied technologies
e •
,Lr 7409 SW Tech Center Dr.Ste. 145
�:e�,,..,•.�T� Tigard,OR.97223
Ph:503-443-3799 Fax:503-620-2748
uns
TExnvc,IS(
503.443.3799
REPORT OF CONCRETE CYLINDER TEST
Project Number: 17-6962-24 Report Number: c8135
Project: PROGRESS LANDING
Client RAPID SOIL SOLUTIONS
Address: 12050 SW 135TH AVE
TIGARD, OR 97223
Attn: MIA MAHEDY—SEXTON
FIELD TEST CONDITIONS AND RESULTS (ASTM C 31)
Date Placed: 9/25/2017
Time Sampled: 2:30 PM
Location of Sample: FOOTINGS / RETAINING WALLS AT STORM WATER RETENSION POND
Supplier:CAL PORTLAND
Truck Number: 7235 Ticket Number: 1263907
Mix Number: 1443FS •
Design Strength: 3000 psi
Time Batched: 1:30 PM Time Placed:
Batch Size: 9.5 yds.
Slump: 4.5 in. (ASTM C 143) Air Content: 1.6 % (ASTM C 173)
Concrete Temp: 73 °F Ambient Temp: 63 °F
Water Added: 5 GALLONS gal. Technician:G CRAIN
LABORATORY TEST RESULTS (ASTM C 39)
Test Percent of Type of
Specimen Date Age Load Diameter Area Strength Design Fracture
A 10/2/2017 7 58720 4.00 12.57 4670 156% 4
B 10/23/2017 28 4.00 12.57
C 10/23/2017 28 4.00 12.57
D 10/23/2017 28 4.00 12.57
E=HOLD 0 4.00 12.57
Remarks: TYPES OF FRACTURE
PA
119411 Type 2 Type 3
Copies to:
MIA MAHEDY-SEXTON Type Types Types
Reported by:
ACS Testing,Inc
7409 SW Tech Center Dr Suite 145
SPHALr Tigard,OR 97223
t iosaterr Phone:503-443-3799 Fax:503-620-2748
OILS DAILY FIELD REPORT FOR STRUCTURAL MASONRY/CONCRETE
TEStI,(..IVC
503.443.3799
Permit:# N/A
RAPID SOIL SOLUTIONS Date: Sep 25,2017 PROGRESS LANDING SUBDIVISION
3915 SW PLUM STREET 12050SW 135TH AVE
PORTLAND,OR 97219-6018 IS THIS A RE-INSPECTION TIGARD,OR
DYES ENO
Inspector Greg Crain OBOA#856 ACS Job# 17-6962-24
Rebar Concrete ER Masonry High Lift 0 Low Lift ❑ CONTINUOUS Inl PERIODIC
Only
YES NO N/A ❑Spread Footings D Walls ❑CMU
Reviewed prior inspection
reports D ❑ ❑✓ Running Footings ❑Columns ❑CDF
Clean Outs Provided ❑ ❑ f❑ ❑Slab ❑Tilt Panels ❑Pilaster
Approved Plans D ❑ ❑ ❑Post Tension ❑Grade Beam ❑Other:See Below
Previous Non Compliance D 0 ❑ Yds.Placed <50 Supplier: CAL PORTLAND
Items Inspected
Embeds Per Plans ❑ ❑ D
Mix Design(s) 1443 FS Req. Strength(s) 3000
Approved Mix Design D ❑ ❑ #Sets Cast 1 # Specimens 5
Reinforcing Per Plans D ❑ ❑ CYL.CAST GROUT MORTAR PRISM
Concrete/Grout Vibrated D C ❑ 04X8 ❑Cubes ❑Cubes ❑Grouted
Foreman Notified of NCR ❑6X 12 ❑Prisms ❑Prisms El Hollow
Items ❑ ❑ D Method of Placement
Soils Have Been Approved D ❑ ❑ Q PUMP ❑CHUTE ❑WHEEL BARROW ❑BUCKET
Completed Work Complies D ❑ ❑ Rli'I
with Specifications RFI#'(s) RFI ISSUE DATE
0 Holdowns ❑CIP Anchors 0 0 D
Contractor DLC EXCAVATING/CONCRETE STRUCTURES
Inspection &Locations:
ACS Representative arrived on site to monitor/sample concrete placement at footings/retaining walls(monolithic)for
stormwater retention pond.
Note;wall/footing reinforcement previously inspected/partially approved by ACS(Jerry Frampton). Follow up inspection this
date to verify completion of rebar reinforcement per plan sheet-11 and Details/Schedules sheet-29(Revision 3).
Reviewed itul AAA.— Date: 9/26/2017 cc:
BB/Aw Bob Brown,President
-
1.
ACCREDITEn
ACS-1147
t
�Cff, 7409 SW Tech Center Dr.Ste. 145
OILS Tigard,OR.97223
503.443.3799 Ph:503-443-3799 Fax:503-620-2748
RAPID SOIL SOLUTIONS
3915 SW PLUM STREET
PORTLAND,OR 97219-6018
PROJECT: PROGRESS LANDING JOB NO: 17-6962-24
LOCATION: N/A WORK ORDER NO:
MATERIAL: . 3/4-0 LAB NO: 10223
SAMPLE SOURCE: Baker Rock SAMPLE DATE: 9/11/2017
MOISTURE-DENSITY RELATIONS OF SOILS USING A 5.5Ib RAMMER
AND A 12in DROP(ASTM D698C)
English Metric
(pcf) (kg/cu.m.)
Maximum dry density: 126.6
Optimum moisture(%): 6.8
130
129
128
127
126
c. 125
1, 124 7, — ,................. ..v
c 123
o
G 122
p 121
120
119
118
4 5 6 7 8 9 10
Moisture(%)
NOTES:
Reviewed by: .fy..,_ it .„..,,e.4,1„,4-
G ESQUIVEL,VP OPERATIONS
DEfjs
A, f
PIM r
7409 SW Tech Center Dr.Ste. 145
„ns Tigard,OR.97223
.trIN4/SC
503.443.3799 Ph:503-443-3799 Fax:503-620-2748
RAPID SOIL SOLUTIONS
3915 SW PLUM STREET
PORTLAND,OR 97219-6018
PROJECT: PROGRESS LANDING JOB NO: 17-6962-24
LOCATION: N/A WORK ORDER NO:
MATERIAL: . 3/4-0 LAB NO: 10223
SAMPLE SOURCE: Baker Rock SAMPLE DATE: 9/11/2017
MOISTURE-DENSITY RELATIONS OF SOILS USING A 5.5Ib RAMMER
AND A 121n DROP(ASTM D698C)
English Metric
(pcf) (kg/cu.m.)
Maximum dry density: 126.6
Optimum moisture(%): 6.8
130
129
128
127
126
c. 125
x+ 124
c 123
m
G 122
/7der 1.6%**"*%..%%\ s..........ss,..v
p 121
120
119
118
4 5 6 7 8 9 10
Moisture(%)
NOTES:
Reviewed by: .yam asl .„-att.4,44.-
G ESQUIVEL,VP OPERATIONS
•
DEfjs
M1 SMUT Page 1 of 1 ACS Testing,Inc
7409 SW Tech Center Drive
411=ANCRETE DAILY SOILS REPORT Suite 145
OILS Tigard,OR 97223
rgST,AG,,.l,- Phone: 503-443-3799
503.443.3799 Date: Oct 3, 2017 Fax: 503-620-2748
Mail To: Project:
RAPID SOIL SOLUTIONS Job# 17-6962-24 PROGRESS LANDING
3915 SW PLUM STREET Permit# 12050 SW 135TH AVE
PORTLAND, OR 97219-6018 TIGARD, OR 97223
Weather: Sunny
Temperature: 65
Inspector: Michelle Chacon ODOT#49380 Contractor: LCD
Field Inspection:
ACS representative arrived on site for proofroll on subgrade for"A" Street. Entire street was proofrolled with a fully
loaded dump truck.No deflection was noted. Results given to Robert Jones with LCD.
Photo Comments: Photo Comments:
i!C pi:: ._
Our reports pertain to the material tested or inspected only.Information contained herein is not to be reproduced except in full,
without prior written authorization from this office.
Reviewed G Date 10-04-2017 cc:
Doug squivel,VP •t gny�y
DE/MC OCT0 LU!!
ACS 1142 ACCREDITED
I.
.PII IST DATE: Oct 10,2017 ACS Testing,Inc
+ILII"O Ckl•Tl 7409 SW Tech Center Dr,Suite 145
PAGE 1 OF: 1 Tigard,OR 97223
Phone:503-443-3799 Fax:503-620-2748
TEATIV(,
IV(
503.443.3799 DAILY ASPHALT COMPACTION / IN PLACE SOIL DENSITY
(NUCLEAR METHOD)Asphalt ASTM D2950/Soil Density ASTM D6938 AASHTO T310
RAPID SOIL SOLUTIONS PROGRESS LANDING
3915 SW PLUM STREET 12050 SW 135TH AVE
PORTLAND,OR 97219-6018 TIGARD,OR 97223
Jurisdiction City of Beaverton
Permit#: N/A
INSPECTOR/CERT Cameron Ingersoll ODOT#49382 17-6962-24
ACS Job#
WEATHER
17 OVERCAST (- SUNNY I— RAIN SOIL TEST METHOD:E✓ T99 ❑D698 0T180 0D1557
AGG: r 3/4"-r 1-1/2"- OTHER: CPN E 8510 I— 8036 I— 8022 1— 8021
IX NATIVE TYPE: brown silt E 8037 E 8658 r 8237 I— 8511 r 7781
SUPPLIER: existing TROXLER E 2064617 38579 I— 38580 I— 30560
CONTRACTOR LCD
ALL GAUGES CALIBRATED BY ODOT
I— C MIX r B MIX I— LEVEL II r LEVEL III
TEST MODE: ❑BACKSCATTER E DIRECT 8" DEPTH STANDARD COUNT:
OPT.MOISTURE: 19.0 1) 650 2) 2240
RICE OR PROCTOR 10212 MAX.DRY DENSITY: 103.6 % OF DENSITY REQ. 95
TEST NO. LOCATION %MOIST. LIFT OR ELEV. DEPTH DENSITY.LBS %MAX DENSITY
1 Lot 9 13.5 El: 231.00 8" 108.6 105
2 Access road 14.7 El: 227.60 8" 106.8 103
3
4
5
6
7
8
9
10
11
12
13
RESULTS GIVEN TO: Robert with LCD.
COMMENTS:
Tests taken on existing native for lot fills.
Reviewed by: Date:Oct 10,2017 CC Mia Mahedy-Sexton
Aga DOUG SQUIV /VP Operations
/-11ACCREDITED DE/MC
3CS•lofo
e
'HALT 7409 SW Tech Center Dr.Ste. 135
Tigard,OR.97223
411=0IfeRT.TI.
Ph:503-443-3799 Fax:503-620-2748
1111
rt..+rrv:.tw
503.443.3799
REPORT OF CONCRETE CYLINDER TEST
Project Number: 17-6962-24 Report Number: c8135
Project: PROGRESS LANDING
Client: RAPID SOIL SOLUTIONS
Address: 12050 SW 135TH AVE
TIGARD, OR 97223
Attn: MIA MAHEDY-SEXTON
FIELD TEST CONDITIONS AND RESULTS (ASTM C 31)
Date Placed: 9/25/2017
Time Sampled: 2:30 PM
Location of Sample: FOOTINGS / RETAINING WALLS AT STORM WATER RETENSION POND
Supplier: CAL PORTLAND
Truck Number: 7235 Ticket Number: 1263907
Mix Number: 1443FS
Design Strength: 3000 psi
Time Batched: 1:30 PM Time Placed:
Batch Size: 9.5 yds.
Slump: 4.5 in. (ASTM C 143) Air Content: 1.6 % (ASTM C 173)
Concrete Temp: 73 °F Ambient Temp: 63 °F
WaterAdded: 5 GALLONS gal. Technician: G CRAIN
LABORATORY TEST RESULTS (ASTM C 39)
Test Percent of Type of
Specimen Date Age Load Diameter Area Strength Design Fracture
A 10/2/2017 7 58720 4.00 12.57 4670 156% 4
B 10/23/2017 28 69000 4.00 12.57 5490 183% 3
C 10/23/2017 28 70690 4.00 12.57 5630 188% 3
D 10/23/2017 28 67280 4.00 12.57 5350 178% 3
E=HOLD 0 4.00 12.57
Remarks: TYPES OF FRACTURE
X X A A, dT
TyPe 1 TYpe 2 TyPe 3
Copies to: [I]
MIA MAHEDY-SEXTON Type4 Types Type6
Reported V4iOr
ACCREDITED
'P'I"T DATE: 10-11-2017 ACS Testing,Inc
. °NCRETE 7409 SW Tech Center Dr,Suite 145
PAGE 1 OF: 1 Tigard,OR 97223
°!E' Phone:503-443-3799 Fax:503-620-2748
TESTING.INC
503.443.3799 DAILY ASPHALT COMPACTION / IN PLACE SOIL DENSITY
(NUCLEAR METHOD)Asphalt ASTM D2950/Soil Density ASTM D6938 AASHTO T310
RAPID SOIL SOLUTIONS PROGRESS LANDING
3915 SW PLUM STREET 12050 SW 135TH AVE
PORTLAND,OR 97219-6018
Jurisdiction City of Tigard TIGARD,OR 97223
Permit#:
INSPECTOR/CERT Reed Degagne 17-6962-24
ACS Job#
WEATHER r OVERCAST r SUNNY 17 RAIN SOIL TEST METHOD: ❑T99 ED698 ❑T180 ❑D1557
AGG: 17 3/4"-r 1-1/2"- OTHER: CPN r 8510 r 8036 r 8022 r 8021
r NATIVE TYPE: r 8037 r 8658 r; 8237 r 8511 r 7781
SUPPLIER: Baker Rock TROXLER 17 20646 E 38579 r 38580 r 30560
CONTRACTOR Lamphere ALL GAUGES CALIBRATED BY ODOT
r C MIX r B MIX r LEVEL II r LEVEL III
TEST MODE: ID BACKSCATTER QX DIRECT gl' DEPTH STANDARD COUNT:
OPT.MOISTURE: 6.8 I) 612 2) 2126
RICE OR PROCTOR 10223 MAX.DRY DENSITY: 126.6 % OF DENSITY REQ. 95
TEST NO. LOCATION %MOIST. LIFT OR ELEV. DEPTH DENSITY.LBS %MAX DENSITY
1 First driveway back 100 yards 6.2 am visit 8" 106.5 84
2 First driveway back 100 yards 6.8 pm visit 8" 101.8 88
3
4
5
6
7
8
9
10
11
12
13
RESULTS GIVEN TO: Fernando Paz
COMMENTS:
Contractor aware of results.
Reviewed by: Date: 10-11-2017 CC
DOU SQUIVEL/VP Operations
ACCREDITED DE/KP
FIELD MEMO
Project: Progress Landing Date: 11/8/17
Location: Tigard, OR Developer: Riverside Homes Permit#: PFI2017-
00034
Rapid Soil Solutions (RSS) has reviewed the drawings shown below and finds there is an error in the asphalt
section. There shown be just 3in of AC. The extra '/z"of elevation will be added to the 3/4"minus rock section to
make sure all the grades work out on site. Taken from sht. 3/29 of contract drawings
I
a
.... 25
125,
P.U.E. I I P.UE
50' 5.0' 14' 14 5.0' 5.0'
I05*WMUI PSLNP 2.0'
PAPITER 9DEMMLN
'0.5' I . S1RP 0.5
`
tCUTTE
8 OIlT1EA
LIU ,r
`77\�\ @vv+i\‘i� i-\.... s 1i1 ao\\\\\v\ r�+'i4+v+
' ,\\\,7'vWSrii1/r;,,,„„,, v >q/, „rrri,„*.+fir-, � ....
NOTE
3-1/t.EE141 5.AC.C91P” TOR MET.c IHER CCMS1RUCIOR ADD AN AD01112M I.r
10 931E CA AASNTO T-204 OF 1-f'-0 BASE ROM ID A#IE'M ROAD SEC9pt
Y 3JP-0'00.4191Fn ROp( 000 E MINI t EN PE1SE MAT 0�NMEND 1H0 Amnia,
DDNc1CIE0 TO SW 1OF AAS4TO T-180 OF YNATI SOON OE01EX*E FABRIC(0R APPRb1Eh
Y 1-1/Y-0.BASE ROCK.
EQUAL) DEAFHO00 UPON TIC
001PACiED ID 05*OF AAS1T0 7-180 RESULTS OF TIE(ROOT ROIL
STREET A TYPICAL SECTION
NTS
A
20
4 IO' 10'
1' r r 7'
Y 10' 2'
GRAVEL SHOULDER I I GRAVEL
/SS 1 A... j' SEE SHEET
%�/%A;0, .a.,t... o; ..* ..4 � 11 t 14
/„.4.,,,,//,/4„„W r//Y/r44,4 4,,M %)
PP. FAA 3.AC,ODI, 1./j 4',..4'.r////rj
10428 OF AASIIIO T-204 \\\\,\\
r 3JP-0'00U51FD 0004:
ACRO 10 858'OF AASN10 1-180
Y 1-I/2'-'BASE RDCk__...
0StP TEO 010 458 OF AMMO 7-180
ACCESS RD TYPICAL SECTION
If you have any questions with this field report please contact me at the below numbers.
_g9 Plat
FookEtt
4*- i.„,p, ,d
OREGON
4
EXPIRES: ti--
SO1SO1wboflsLLc
503-816-3689 mia@rapidsoilsolutions.com
i ti.t
mow,5PILILT DATE: Nov 3,2017 ACS Testing,Inc
V{J,yCRF.TE 7409 SW Tech Center Dr,Suite 145
PAGE 1 OF: 1 Tigard,OR 97223
G`f'' Phone:503-443-3799 Fax:503-620-2748
TESTING.l.4C
503.443.3799 DAILY ASPHALT COMPACTION / IN PLACE SOIL DENSITY
(NUCLEAR METHOD)Asphalt ASTM D2950/Soil Density ASTM D6938 AASHTO T310
RAPID SOIL SOLUTIONS PROGRESS LANDING
3915 SW PLUM STREET 12050 SW 135TH AVE
PORTLAND,OR 97219-6018 TIGARD,OR 97223
Jurisdiction TIGARD
Permit#: N/A
INSPECTOR/CERT Dan Hamilton#44273 17-6962-24
ACS Job#
WEATHER r OVERCAST r SUNNY r RAIN SOIL TEST METHOD:0 T99 OD698 0T180 JD1557
AGG: 17 3/4"-r 1-1/2"- OTHER: CPN r 8510 r 8036 r 8022 r 8021
r NATIVE TYPE: r 8037 r 8658 r 8237 r 8511 r 7781
SUPPLIER: Baker rock TROXLER r 206461— 38579 17 38580r 30560
CONTRACTOR Lamphere
r C MIX r B MIX r LEVEL II r LEVEL III ALL GAUGES CALIBRATED BY ODOT
TEST MODE: ❑BACKSCATTER D DIRECT 6" DEPTH STANDARD COUNT:
OPT.MOISTURE: 8.7 1) 696 2) 2130
RICE OR PROCTOR 10037 MAX.DRY DENSITY: 127.0 % OF DENSITY REQ. 95%
TEST NO. LOCATION %MOIST. LIFT OR ELEV. DEPTH DENSITY.LBS %MAX DENSITY
1 Lot CRNR 5/6 7.2 Top 6" 128.0 100.8
2 Lot CRNR 1/2 7.4 Top 6" 127.2 100.2
3 Cultasack at center 7.3 Top 6" 126.7 99.8
4
5
6
7
8
9
10
11
12
13
RESULTS GIVEN TO: The Contractor
COMMENTS:
Shots taken on base aggregate for road way
Reviewed by: Date:Nov 4,2017 CC Mia Mahedy-Sexton
DOUG ES IVEL/VP Operations
ACCREDITED DE/AW
Ncs-I()h4