Specifications /25-7- ,2o 17-oosoe 1O3g. sW etelbeicry GREEN MOUNTMIN structural engineering Memorandum June 4,2018 To: Wes Boisvert, Riverside Homes From: Corina Muntean, P.E Re: Plan 3383 at Progress Landing Lot 7 I understand that a question was raised about the location of the horizontal rebar in the concrete stem wall. Detail 9 on S2 shows the floor joists being pocketed,though that is not how it is assembled. Instead the joists are bearing on top of the sill plate. I take no exception on the placement of the rebar, however in the future, if joists are not pocketed it should be located 3 inches from the top of the concrete stem wall. If you have any questions, don't hesitate to ask. �Rto PROFFs 14, 49 78PE cc OREGON ,1 , q4 0,‘ 12, MO +P" Expires: 12"dN'tg greenmountainse.com-info@greenmountainse.com-4857 NW Lake Rd.,Suite 260,Camas,WA 98607