Loading...
Specifications //4 To-of7-cosa9' GREEN MOUNTV1IN 42aq .sw b .? structural engineering Memorandum June 4, 2018 To: Wes Boisvert, Riverside Homes From: Corina Muntean, P.E Re: Plan 2885 at Progress Landing Lot 8 I understand that a question was raised about the location of the horizontal rebar in the concrete stem wall. Detail 9 on S2 shows the floor joists being pocketed,though that is not how it is assembled. Instead the joists are bearing on top of the sill plate. I take no exception on the placement of the rebar, however in the future, if joists are not pocketed it should be located 3 inches from the top of the concrete stem wall. If you have any questions, don't hesitate to ask. •s .a r •497 E j'\\-Y ,t i 73: 12'31.18 greenmountainse.com-info@greenmountainse.com-4857 NW Lake Rd.,Suite 260,Camas,WA 98607