Loading...
Report (41) • s f T 0 O/6 - 6°° " 2 cit 7 (2./+.J,eit Qg-t./) ,TS 173- 179 GEODESIGNi FIELD REPORT Page 1 of 1 GDI Project: Polygon-129-03 Prepared By: i Travis Micho Project Name: River Terrace East Date: May 16, 2018 Location: SW Scholls Ferry&Roy Rogers, Bvrtn. Report#: 225-B Arrival: 0800 Departure: 0830 Weather: Overcast, 60's Permit#: TBD Site Visit Requested By: Brian (Polygon Northwest) Met With (on site): , Brian (Polygon Northwest) Purpose: Observe subgrade at Lots 173-175 for stairway and sidewalk Outstanding Issues: Proof roll road and curb base rock and repair as needed before paving FR-58 (12/06) - Decommission temporary storm and sewer lines through Tract E FR-177-Soft fill from slope cut in lots 153, 1 54 and 155 FR-223 - Large roots/organic wooden debris within lot 165 subgrade Upon arrival, I met with Brian (Polygon Northwest), who directed me to the prepared subgrade for stairways and sidewalks at Lots 173-175 (see site plan). I observed Lots 176-179 still being excavated to finish grade. At time of visit, Lots 173-175 did not have any crushed rock placed. I observed the subgrade to generally consist of brown SILT, some sand. I used a%Z'-diameter steel foundation probe to evaluate the consistency of the subgrade. Resistances to penetrations indicated medium-stiff to stiff subgrade conditions, with exception to a soft area located at the corner of Lot 173 (see site plan).The area was approx. 6 square feet and was observed to have water atop it. Subgrade conditions became medium-stiff at approx. 12-in of penetration. Based on observations and resistances to penetrations with the foundation probe, the subgrade observed today and as indicated on the attached site plan, with exception to the soft area at Lot 173, is being prepared in general accordance with our geotechnical recommendations. We recommend the soft material at Lot 173 be removed and backfilled with granular structural fill. We recommend a GDI field representative be scheduled to evaluate the subgrade at Lots 176-179 when prepared. Distribution: Attachments: Site Plan (1) Reviewed by: SMD This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of our representative.Our work does not include supervision or direction of the contractor,the contractor's employees or agents. Our firm is not responsible for site safety.This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations.The report can only be considered final upon review of the GeoDesign project manager,as indicated by initials in the"Reviewed By"section. Signature: T;allis Ai"; 9450 SW Commerce Circle,Suite 300 I Wilsonville,OR 97070 1503.968.8787 I www.geodesigninc.com 4. 5/16/2018 Polygon-129-03 FR-175B 1 of 1 _---------- -<,„"c,--- -------------,, .. -,-,___--•-,---,,,,-- __ 0,,,,eit Tetvw.ce. —0 .--- _--------'---- Soft subgrade obse - rved '-'-'----;-4,-----ff-?- __ ------- - 1--7-- — ------------ (6s0 -''''It ' '-: .‘ , ' L.7,.; Pig _.----• „ _.-- .. __ _ , -- .,,.Z...,- , , -------'—' ..,-", I. 1 ,, ,--T ,----------- 22„.....,*.12---'--- '---'---' 1 7-'7:--'-',71;il-'. '.--.----: -- ''\' ; ‘11 ....' i I 3 1 1 1 pc„,,c,4 fya.c.faapAaay '''''''altar:o. Iff fa i :—'as 1 af•!faa' aaf I :i11 1 „...e'r'..7 a...! 1:1 r—••--.1 . •Se •51 ! •a• ' . • all ! .sa ...'" ••••••.' ! ' i • '; " ''''T --k:',;°,71:::7:• I ...,,,...J.. ,,..________., -------„:„-Ji- •- - T-1-- — Subgrade observed:Med. '. . -j--r,:7, , Stiff to stiff brown SILT, .031,,,ien. I t : .— ' some sand 11 —.1).LI/, : i','- H-; „,:::' i ... - ,I;LH.,,X-""""'"'"7:., l''''''' 144 : / DCI,IgIl "%•:•;---•••""•-;;;;;C- ••••••••_-••„;"*"*7;"•,,, •••-;-;;;77,* „1 '7,_„2 0-7,; ; .,- „,. --,--, „ .. , ; ; '-'" -'r— ' -6.' -------- — 1:•-i----- -- ...-1 t IN V ";--if '-rt,;',',,1*- r.........% Das DESCIIPION „ „ „ 4:'' g .1 • „ SI yi S3 I ! I'',I";; ;',.;; .;I; • 't A ; 41 ';;;I:1,,,,' .:::, .„•;--•• ; ' ' , • I :1 . . . ' . ' „ ! . „ . ! . 1 „ „ ; ,; •'i:4:::.: :''''IL '' : '' '' .4' ;:'-r-'7.--.----'-‘:-.1 I 4 : _kr.;7,... : 4 ,,,,/ ''' ' ........ —„_Am:,-.if ' „ , , I % .-.6-,„.1- -', a,...:„.„ - ' ;;; ; 1....=',...,,,,1 '- =-e..,;---,-;;,.-.;,-,°` „ 1. ,. .,_ .... ,.,,, „T,„,_,,,.._ _ ,,,,,....,„.....,y .,..,„ ,,,,..L ., ,„(( -, 10\1+,1. .. ... , , -A 1 - I - c. „ u , 63 ea , . „2 73 1 '” i-,.--... - River Terrace !Ki l' "' , : ,... 1 1 _I ,t.11 \,. ,..di v East ---,.. - , .. -- I '' ' 1i ....... . . ., . II V Corm:ruction Documents , " ' ''•-' 1 . . ' ' : : • ..,te.c+ ,v • '-'-,,;',', I r- 1 :. .!.1 1 '.: " ! " " 1 " "_,,,,7 " ! " " ++ ,,. , A _,_ f"' .1 1, . ,-, 0 ' ,• •,,, ; i 1,1,,, • V. - SITE : ' -4. 1 ‘.--:-_,,,....---r--",----' :'i -7;17-...: 7° '.__.74,' -:::_4,---17:'r PLAN , •••••••Nom 2•Nom m•sm.••mom•• ' j• • -..- --'-- — — `—11,— — ---- —'----- •le Isms'. 18 I.monif ii mai-A Alma El I.•••• , oo mil nj,,,,,,,kili••Nam•a •••••••• NORTH INATCHLINE 1 LTGENR SITE PLAN SHEET 4.2 •: ...,—,re.,,..., i SI K.......L.I... (i) ,.. 4. 1 ELEVATION DATUM:NGVD 29 *Not to scale. Locations are approx. boo 1 r r,29/7-.'7 /2l uzA. u/9 175 7 G EODESIGN FIELD REPORT Page 1 of 1 GDI Project: Polygon-129-03 Prepared By: l Travis Micho Project Name: River Terrace East Date: May 16, 2018 Location: SW Scholls Ferry&Roy Rogers, Bvrtn. Report#: 225-B Arrival: 0800 Departure: 0830 Weather: Overcast, 60's Permit#: TBD Site Visit Requested By: Brian (Polygon Northwest) Met With (on site): Brian (Polygon Northwest) Purpose: Observe subgrade at Lots 173-175 for stairway and sidewalk Outstanding Issues: Proof roll road and curb base rock and repair as needed before paving FR-58 (12/06) - Decommission temporary storm and sewer lines through Tract E FR-177-Soft fill from slope cut in lots 153, 154 and 155 FR-223 - Large roots/organic wooden debris within lot 165 subgrade Upon arrival, I met with Brian (Polygon Northwest), who directed me to the prepared subgrade for stairways and sidewalks at Lots 173-175 (see site plan). I observed Lots 176-179 still being excavated to finish grade. At time of visit, Lots 1 73-175 did not have any crushed rock placed. I observed the subgrade to generally consist of brown SILT, some sand. I used a%2"-diameter steel foundation probe to evaluate the consistency of the subgrade. Resistances to penetrations indicated medium-stiff to stiff subgrade conditions,with exception to a soft area located at the corner of Lot 173 (see site plan).The area was approx. 6 square feet and was observed to have water atop it. Subgrade conditions became medium-stiff at approx. 12-in of penetration. Based on observations and resistances to penetrations with the foundation probe, the subgrade observed today and as indicated on the attached site plan, with exception to the soft area at Lot 173, is being prepared in general accordance with our geotechnical recommendations.We recommend the soft material at Lot 173 be removed and backfilled with granular structural fill. We recommend a GDI field representative be scheduled to evaluate the subgrade at Lots 176-179 when prepared. Distribution: Attachments: Site Plan (1) Reviewed by: This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of our representative. Our work does not indude supervision or direction of the contractor,the contractor's employees or agents. Our firm is not responsible for site safety.This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations.The report can only be considered final upon review of the GeoDesign project manager,as indicated by initials in the"Reviewed By"section. Signature: T�amic/aa 9450 SW Commerce Circle,Suite 300 I Wilsonville,OR 97070 1503.968.8787 I www.geodesigninc.com .. .,-, 5/16/2018 Polygon-129-03 FR-175B 1 of 1 , ------ , isigior a ... ,--- --,----_ Soft subgrade observed ,.LUT 1,-...„..=....___if..„_.-• ,....__. ._. .•-••• (6sf) j...44'44, .- /•••"6"66'..-- ..„,„.... .......... . ., ”-6-6.6-" .6,.., '11111.' ' .• 4 ' i Tr';'.67. .''' '''..i.'.;*''::;;:''''''''''' '' '';66, '''• •, \\N Pt ,• , •_._,_•I ee,,,., ,,,_, •,66:--."',,r,,T.,i,:1._. , 1 11,,1 6: ,,,, :2.1.1::r:.,fr.,2".: :„.16,,,,,':''':\l't.i.1...:1/111111L x,.7H,,; !IP',, l'..,,, 1 ,::: 1,,i,Ti`;1 r:.E it:TIL,,„.%. i -61 SI:, '‘, nOLYCC111,IV LI.VAPANI '''Th!.•M,,... ,.,,,,,,:,:zr,m; __, , 1__,_ __ 1 ii-.'' ,,_ _:,. ...,,.. 4: ,11 f ; F .,..."-`',*1 TI', i •i ('mlinitinity 1),T" „,,,,,,,,„„___.._: 1. ' !I ' -"I-7- - ' Subgrade observed:Med. i ',i „.,--Ti-Ir-,...,•,, 1 1 , e ! , = 1 ,:., 1 ' 1. „, Stiff to stiff brown SILT, i :-,:. 1jr..1}..i4 : - - 7 1 ..-r'' [ rn --' ,. • ') 12., .--;:-."--••••••••.::::" --Tf--;:72; ,.. ... i. l'T 7 -*T.,°:"......7- "'" IS, '" _ „„„„.„„ -_'° _ :,".... -„,„ --------•%," „r.,,,,--1— ;• 1 f : --- ,.;.1,;:,-t-1,- 1 ,„ 1.•:,'.: '-`,',, . t ,„..1.;'....r.._ :......,.:.-1...:-:„.. f.„4,1,,•,:-.;.b., ,,,..__..f . : : . . .•. , it ,-,,ft:': , r': : ':• I \. ' ' ,... .... ,5..: '11! (11 ,,,,,,,,,,.,:-To.,4 „,........„$,, ---..---- , -,,-,- :::.,,,\ * 4!,,, ,, i.t ,:I I I -1 ,-1,...." ' ,,,..j, . _..1),,,,-7 . 1 f,.,. 't,, River Terrace , ,-,„: .• ,,,,`-,--7 East . : ,t .„ Construction Documents !? : . : _..._........____ . f...n,! ! ! {..!!!„ SITE ,, :;' * . 1 Nt._ -... --- '1'1 7:'::::-.7,.:LHT2':_74..,-:77--.1'±-t-.4-, l',----'-7:.'r PLAN ' Math'II( 111.1111 •• ••=MN velrmo,rorrirmrtintarinr• ••ino••-• ••••••iiirariiiim••:ma...••••••1410ANCIMMAAWIlfdt . •• •• •••••••••••••• 1 les 1114111M NORTH MATCHLINE ! !,!cF,t4p SITE PLAN SHEET 4.2 irk,r,er...rwry 1.r.r rr-rrr tr„-ixuarrutrorx+um , fa war tr.:rirre.o x,x. r I.,191•05E0 A:FIN. , (;) 1 . """:F•1,11141 A:PAN,N0 4. 1 c SCALE '.. , nn fl In .1 I , II ELEVATION DATUM:NOV//DO *Not to scale. Locations are approx. , 00 A 3/T 0 i s- 0 0 0 i 1 i q I 7 g 7 0.eiv- Ti2frst 4-e-C—.. g(—LID .,, e—rc / 57 3 - / 7 9 , 3 e'S t ?-,,,e i-- pk, ,......__ -frA) •......ye.6.,,,,,:,...1 --4 _ ...- PAVEMENT TANCUT.UP.- ---,.,-, EANTOIN I11 WW1121 INACT FACI1 ay i. may — 14,0* ii', ,73 i ,———i--2'' 1 ,,,,,,,crt,— ENACt --lIEN- CPA [ , r _ 1166 1 157 155 159 1691 I r Q194 995 1 196 195 199 200 2o, xta zra m 9._1, i, ,,,,„, i 154 .„„.. 1 I ‘., ; 'w i Tir , 4 .t. 4, -, __ ,6,, , — 4,ar i 1 o i" 1 s~ : _„„,,„,_._., , ,/, I,tw 1 II, ' ...t. t 1 i I Id o. ' 1 ' 11 la C64 153 I 1 162 . VET ,,,,,, 1 11 4 {,.. - ; '''''";,,,, i ; t--.MO ALE555E.2 ENT N99 '41 14 147717 ' f'*'" '"'"-1 P.i 1 I "a ,,. ______ u!_........ ___..,___ f_ ..7: --- 0---:..,-------------4.- .... — ,, it , I 1 I 49 50 '1 51 51 53 1 - - —— --i kl ,1 .” 1 i ..,...._11 !i .3, , "" 44.r. ,A 1 ,,,,, , 1 —,.,1 ,, 5W11141111-ANE - Ti i 1 ''''''" , 1 1 11 - 11 1 '' 1 1 67 1 61 59 55 57 56 54 134 1..,.1 1 91.1110 1 6 1 "' I WA 8 1 1 t 1 v 0,,,,,,.........,7_,2,..., 7 ..,, ", ,., __,_ .. ,. , ,,, ,, , - m. ,, - E-u, ., .....,,,.. .-z,r, - z=. ,..., ,- -- ,5 1 ,..., —'" - ' —,-- . : i , )1 : „„,,— , ils: ,--------,--;—;E-1---,—, 1 1:7.4'"'"''''''' I! r-- -1—1--- .--'------'-' 'WAIT -'---- ----*- , 1 1 -.-t,v4mr...1== =zi - 1-4.1---4,1,... . , % 1 r ,, A.. 1 — , -- ,, i to,t I I 1 — 3,---1 g! 1 0.tT. . I r r r . a at ro n n 71 I i 29 I ii i 130 €, --- 0 ,-- •i lii . Ili,, 1 .1 1115 15 li 10 AT Ai 79 711 st 76 75 2,4 r ' f-- inclumi! I .V.,kl, 1 _.:14, 119 12 If 1115111 127 *NI I 1 1 i 1 '' '; JI q a --,.. 35 i 4 I or a NI SWAN-a man IR• 111* •vi we an=ir it .. N' -0, Ic4L4, iv..s" APP/wk'64(ii-f..ior,ws.) MATCHLINE LEGEND ' SITE PLAN SHEET 4.2 —--—PROPOSED Focifr Of WAY EOM.RIGHT OF WAY # #KP • 44.11MINIII* 1 •grommo I onsomm. I 14.--6 3 ',5e 94 1 r 1 k... 22C- eis A4( 4 A( i .4 . '..4* .&IOW rillrAri e ree le 400 irrirjrAfti Of rAlior4611:11011010rA0 I 1,7:40"4 4 0 r WA"0 r.,drA I ir.A i r 4 . Alto'17:4011.49 MirAor r #111111111120*.,•IMI#11111•1 Mb* ,•• 6.00' OINIMMOM PUE, TYP. I*. 4a. 1i 105 . i 01101M . ft . 1., . . °. , . 1114110. 4 . 4 1 • .4 f.,L.(is+44t to.4 1 I 1 106 107 ....„ I :. .. #.,..341. : KE3I .. . •--._f;=.41,,,,,,J;11 . . woo 444.014..G ....,........ .. ...I...............4 4.....4°".4". • • 411". '' 4 I"..(401 C 144 40.# •' 4‘,56.4,e 41` , 4= pal,,,,,,... ............ ......,opal}ON•.•• • • . . .0,0•1° 4 yip,...... 1 li •• s mil=rm.r