Report • 0 Oldcastle Precasts Delivering Reliability
10'-7" -
9,_9"
y 1,_9r 3'-6" 3'-6" _—"-I 1'—gp f
-t—2-8" 2'-2r re Sump
(3 Places)
T .,,,,,,",,,.".r�." '_' 4 1 Costing Not Shownii i4-I _' �( s\ /0I "';. = This Vie*
w `i '�+ li =A = 2" Vent
uiiiTerm—A—Duct in Top
a (1 Eoch End)
Op
a L -• " iiiii — —1` )„,
rt
n J (5 ;
L 4---
(3)— No. 30 x 4 Costings Hook Lift Anchor
(Bolt—DoWn and Gosketed) (4 Places in Top & Bose)
30" Dia. Clear Access
PLAN VIEW
3 J
v OUTLET ci
0 30" Grode Rings Available W/Flexible Boot o
INLET (Recommended 12" Maximum) Connector E
E EE yr/Flexible Boot for 4" & 6" Pipe
Connector Risers Available
'^"' for 4" & 6" Pipe Butyl Resin Sealont v I
I
IN N
T ' K
j- -
tE
C a '"' p
101
3 is o
J -i
o h O U
I
'x Baffle Wall J; "� i�
-ti___, -..===T--I I
In 1
—d6"L' 7'-64" 1.--2'-2" --15"1-.--\\_Outlet Bay
Grease Interceptor: SIDE VIEW
— Designed in accordance With IAPMO/ANSI Z1001, Monufoctured per ASTM C1613
— Loading per ASTM C890 for AASHTO HS20-44 vehicle loading and maximum soil cover of 5'-0"
— Maximum allowable DFUs (Drainage Fixture Units) = 172 (equivalent to 1,500 gallon size)
— Corrosion resistant cooting/liner available to extend the life of the tank.
Manufacturer's recommendations:
— Fill lift anchor pockets With grout.
— Ventilate each end to open atmosphere.
— Prior to "Start Up" of System, fill With clean Water through inlet boy to bottom of flow channel (opprox. one foot deep).
— FolloW Regular Inspection, Cleaning, & Maintenance Schedule (See Clean Out & Maintenance Instructions).
C.1992-2016 Oldcostte Precast, Inc.
opauburn.com