Plans (10) --7----' 1—mt ar's rei.rcuishke 7=
75" 14
r Ct
1 v•I 4--1-1
I S. • 1 5
i 1
1 ' 0 • - * IS tock-0 V{CXD
i -bar(eine_412..* r
, I
1 I , WOO SW-r-e4orsFer6i ed
-VI be,4R-4-24.1,
..,. 05..)-4-62_&-leksse6Vyauxt
1 ett 1 (Ga5)91:54- (040(1)0,"kitt
ft, I eTh
11 •
1 -,...
1------;----1-ki
1
K‘ 1 ...e
,c, 1
1 14
1 \
1
I t v
, -
Ir ,1i 14
g 3 ?
. ;
i 'rex- $, .
,'
1..
•
1
CITY OF TIGARD
Approved by Planning
Date: ._....lima__________
Initials: "ri--
G
I.
Tckkvu_s F-ezt,i ij
1 ,J
I "= 20-r-. 1(--
,....
Pi
T'
-.
.
Cy '' I 5
. --b. ..._. ........ ...... ...MP Ilb....041 . 4# ......... .
0 i 1
* 1$ilm.SDIV010°
r
. iShaliken c, 4
. .
telbo svi-re4.6 CS k al ied
I t
I , 7.-viottellts2.1. _
4:1 r 05)B2.013155614073
I R. 44, rbv 1 601),-1:54-lotqc.
1 t I 1 n
I i I 1
I . r
,
1 I r
C 4
$ I
I
Ye t,t) but ilti
I
,s1 I
I i 14
1E'
I 1 1
1 ct
I V 0 i i
I
k
% P
5,' t
!Fit.f.r-
I i 41
0 4
I
) I
i
i CITY OF TIGARO
Approved by Planning
1_,
Date:
0IInitials: 'IL-
..___ql_do
I
• 1cf. 1
, --
, I
G 11
1
I 20-Ce- -
RECEIVED
McGINNIS & ASSOCIATES MAY 1 2018 JOB: TS Accessory Building
Consulting Engineers, Inc. #160-792805 NO. 24598
• 1110 Westmark Drive CITY OF TIGARD SHEET NO. 1 OF 14
Saint Louis, Missouri 63131-1735 BUILDING DIVISION CALC. BY SC DATE 4/20/2018
Structural Calculations for:
Shawn Clark& Darlene Geiger Project Location: Portland, OR
Tuff Shed Project No. 160-792805 Building Code: 2015 IBC
Building Dimensions: Overall Building Width: 15:= 16ftj Building Overhangs:g le'over:= 12•irf� (Laver:= 121
Overall Building Length: IL:= 30M (nb. ridge runs parallel to Length)
Plate Heights: Finished Floor Elevation: Ihfloorl := 81
Top of Plate Elevation: Ih :=7ft+ 911
floo 2 I h late = h
hplate floor
I hfloor := 10ft+ 911 h late
p 2 := hfloor3 — hfloor2
Roof Pitches: (pitch := 120 Roof Angle: O:= atan(pitch) 0= 39.81 deg
Peak Roof Height: Ihpak:= 18ft+ Oir
Mean Building Height: hmean:= floor eak 0.
(h3 + h P ) 5 (hmean = 14.38 ft I
Consider Vertical Loads:
Dead Loads: Roof Dead Load: IDLI g U C T Vroof:= lOps� �� R
il
DLloft:= 10
Loft Dead Load: I ps 0.0�� O1�
RR
Wall Dead Load: IDL @�,\Ctir', X41
wall�= 8Ps \ @_
t, 'T
tom/ 73PA'
Live Loads: Roof Live Load: ILLi
roof= 20•psi
Loft Live Load: }
ILLloft 40Ps1 ORE4" C
Snow Loads: Roof Snow Load: ,,
ISLroof:=
40ps1 ✓/e ''
414RR_ E 0
I Roof Load Summary I Roof End Reactions:
Roof Support: Trusses @ 24 in.c/c EXP( ES: f,4_ �3 I A3
Truss Span(ft): 16 Dead Load: B 1 l
roof DL=
2 + Bover 'DLroof+ Sft•DLIoJ•rtspacing
Roof Dead Load(psf): 10
Roof Live Load(psf): 20 IRroof_DL= 280 lb I
Roof Snow Load(psf): 40.00 _
Governing Total Load(psf): 50 Live Load: •
(--
5 \ / SLroof lSee Calculations to Follow oof LL= + Bover max + LLloft spacing
LL,
oof// _
IRroof_LL = 1440 lb I
I P:\0_PROJECTS\24000\24500\24598_TS160-792805
I
McGINNIS & ASSOCIATES JOB: TS Accessory Building
Consulting Engineers, Inc. #160-792805 NO. 24598
1110 Westmark Drive SHEET NO. 2 OF 14
Saint Louis, Missouri 63131-1735 CALC. BY SC DATE 4/20/2018
3'-6"Foot Opening Headers
Beam Design Data
Member: 2x8 Beam Span (ft): 3.5 Effective Length Factor: k= 1.84
#of Memb: 2 Unbraced Length (ft): 3.5 (Ref NDS Table 3.3.3)
Adjustment Factors NDS Table 2.3.1 Le := k•L, Le = 6.44 ft
CD CM Ct CL C; C,
1.15 1.00 1.00 See Below 1.00 1.00
Selected Member Properties
Commercial #of b d Area SX lX E
Species Grade Member Size Mem. (in) (in) (in2) (in3) (in4) (ksi)
Hem-Fir No.2 2x8 2 1.5 7.25 21.75 26.28 95.27 1200
Concentrated Load Data
DL LL a dist. P
Number (kips) (kips) (ft) Description ra
P1 0.00 0.00 0.00
P2 0.00 0.00 0.00 "a
P3 0.00 0.00 0.00 II" L
4
P4 0.00 0.00 0.00 RL RR
P5 0.00 0.00 0.00
P6 0.00 0.00 0.00
Uniform Load Data
DL LL a dist. c dist. trib.wt.
at
b
Number (kiplft) (kip/ft) (ft) (ft) (ft) Description 1
w1 0.09 0.36 0.00 0.00 9.00 Roof Load 11111 l 1111
w2 0.05 0.20 0.00 0.00 5.00 Loft Load rrPrr
w3 0.00 0.00 0.00 0.00 0.00 . L .1
w4 0.00 0.00 0.00 0.00 0.00 RL RR
w5 0.00 0.00 0.00 0.00 0.00
w6 0.00 0.00 0.00 0.00 0.00
Calculated Adjustment Factor CL= 0.9936 Shears,Moments,&Deflections
Maximum Shear Stress(psi) 86
Allowable Shear Stress(psi) 173 OK
Reactions Maximum Bending Stress (psi) 498
DL LL TL Allowable Bending Stress(psi) 971 OK
(kips) (kips) (kips) Max Dead Load Deflection(in) 0.004 9351
Left End 0.27 0.98 1.25 Max Live Load Deflection(in) 0.017 2539
Right End 0.27 0.98 1.25 Max Total Load Deflection(in) 0.021 1997
USE 2-2x8
P:\O_PROJECTS\24000\24500\24598 TS160-792805
McGINNIS & ASSOCIATES JOB: TS Accessory Building
Consulting Engineers, Inc. #160-792805 NO. 24598
. 1110 Westmark Drive SHEET NO. 3 OF 14
Saint Louis, Missouri 63131-1735 CALC. BY SC DATE 4/20/2018
_ 6 Foot Opening Headers
Beam Design Data
Member: 2x12 Beam Span (ft): 6 Effective Length Factor: k= 1.84
#of Memb: 2 Unbraced Length (ft): 6 (Ref NDS Table 3.3.3)
Adjustment Factors-NDS Table 2.3.1 Le := k•L, Le = 11.04 ft
CD CM Ct CL C1 Cr
1.15 1.00 1.00 See Below 1.00 1.00
Selected Member Properties
Commercial #of b d Area S„ 1, E
Species Grade Member Size Mem. (in) (in) (in2) (in3) (in°) (ksi)
Hem-Fir No.2 2x12 2 1.5 11.25 33.75 63.28 355.96 1200
Concentrated Load Data
DL LL a dist. P
Number (kips) (kips) (ft) Description I--..--
P1 0.00 0.00 0.00
P2 0.00 0.00 0.00 ' 'r "
P3 0.00 0.00 0.00 1. L I
P4 0.00 0.00 0.00 RL RR
P5 0.00 0.00 0.00
P6 0.00 0.00 0.00
Uniform Load Data
DL LL a dist. c dist. trib.wt. -Q I b I_
Number (kip/ft) (kip/ft) (ft) (ft) (ft) Description
w1 0.09 0.36 0.00 0.00 9.00 Roof Load 1111111111
w2 0.05 0.20 0.00 0.00 5.00 Loft Load "4'r
w3 0.00 0.00 0.00 0.00 0.00 I. L .1
w4 0.00 0.00 0.00 0.00 0.00 RL RIR
w5 0.00 0.00 0.00 0.00 0.00
w6 0.00 0.00 0.00 0.00 0.00
Calculated Adjustment Factor CL= 0.9789 Shears,Moments,&Deflections
Maximum Shear Stress(psi) 96
Allowable Shear Stress(psi) 173 OK
Reactions Maximum Bending Stress(psi) 613
DL LL TL Allowable Bending Stress(psi) 957 OK
(kips) (kips) (kips) Max Dead Load Deflection(in) 0.011 6644
Left End 0.48 1.68 2.16 Max Live Load Deflection(in) 0.038 1883
Right End 0.48 1.68 2.16 Max Total Load Deflection(in) 0.049 1467
USE 2-2x12
•
P:\0_PROJECTS\24000\24500\24598 T5160-792805
McGINNIS & ASSOCIATES JOB: TS Accessory Building
Consulting Engineers, Inc. #160-792805 NO. 24598
1110 Westmark Drive SHEET NO. 4 OF 14
Saint Louis, Missouri 63131 1735 CALC. BY SC DATE 4/20/2018
12 Foot Opening Headers
Beam Design Data
Member: 2x12 Beam Span(ft): 12 Effective Length Factor: k= 1.84
#of Memb: 2 Unbraced Length (ft): 12 (Ref NDS Table 3.3.3)
Adjustment Factors-NDS Table 2.3.1
Le := k•L, Le = 22.08 ft
CD CM Ct CL C. Cr
1.15 1.00 1.00 See Below 1.00 1.00
Selected Member Properties
Commercial #of b d Area S,, I. E
Species Grade Member Size Mem. (in) (in) (in2) (in) (in4) (ksi)
Hem-Fir No.2 2x12 2 1.5 11.25 33.75 63.28 355.96 1200
Concentrated Load Data
DL LL a dist. P
Number (kips) (kips) (ft) Description r..
P1 0.00 0.00 0.00
P2 0.00 0.00 0.00
P3 0.00 0.00 0.00 L
P4 0.00 0.00 0.00 RL RR
P5 0.00 0.00 0.00
P6 0.00 0.00 0.00
Uniform Load Data
DL LL a dist. c dist. trib.wt.
_Q b � � 1
Number (kip/ft) (kip/ft) (ft) (ft) (ft) Description
w1 0.02 0.08 0.00 0.00 2.00 Roof Load l l 11111111
w2 0.02 0.08 0.00 0.00 2.00 Loft Load
w3 0.00 0.00 0.00 0.00 0.00 1- L 1
w4 0.00 0.00 0.00 0.00 0.00 RL RR
w5 0.00 0.00 0.00 0.00 0.00
w6 0.00 0.00 0.00 0.00 0.00
Calculated Adjustment Factor CL= 0.9365 Shears,Moments,&Deflections
Maximum Shear Stress(psi) 58
Allowable Shear Stress (psi) 173 OK
Reactions Maximum Bending Stress (psi) 747
- DL LL TL Allowable Bending Stress(psi) 915 OK
(kips) (kips) (kips) Max Dead Load Deflection(in) 0.064 2244
Left End 0.35 0.96 1.31 Max Live Load Deflection(in) 0.175 824
Right End 0.35 0.96 1.31 Max Total Load Deflection(in) 0.239 603
USE 2-2x12
P:\0_PROJECTS\24000\24500\24598 15160-792805
McGINNIS & ASSOCIATES JOB: TS Accessory Building
Consulting Engineers, Inc. #160-792805 NO. 24598
1110 Westmark Drive SHEET NO. 5 OF 14
Saint Louis, Missouri 63131-1735 CALC. BY SC DATE 4/20/2018
Lateral Loads: Project Location: Portland, OR
Determine Wind Loads: Building Code: 2015 IBC
Risk Category II (Table 1.5-1)
Basic Wind Speed (3 second gust): Vwind:= 120mph (Figure 26.5-1A, B or C)
Exposure Category: Exposure : "B"
Height and Exposure Coefficient: X= 1
Basic Wind Pressures: nb. intermediate roof angles are interpolated
Main Windforce Resisting System Loads:ps30 (ASCE 7-10 Figure 28.6-1)
Horizontal Loads(psf) Vertical Loads(psf)
Interior Zone: Wall Roof Interior Zone: Windward Roof Leeward Roof
Transverse 20.4 14.0 Transverse 8.6 -13.4
Longitudinal 15.1 -7.0 Longitudinal -19.1 -12.1
Calculated Wind Pressures: Opsf minimum roof lateral load -Figure 28.6-1 footnote 7.
• Calculated Wind Loads
Horizontal Loads(psf) Vertical Loads(psf)
Interior Zone: Wall Roof Interior Zone: Windward Roof Leeward Roof
• Transverse 20.4 14.0 Transverse 8.6 -13.4
Longitudinal 15.1 0.0 Longitudinal -19.1 -12.1
Wind Loads Transverse Direction: 5= 16ft L= 30 ft hpeak= 18ft
Trib_arearca t hpeak- hfloor3 Trib_arearooft= 7.25 ft
Trib_arearoof_i := 0.5(hpeak- hfloor3) Trib_arearoofi = 3.63 ft
Tri b_areawaii := hfloor3- 0.5•hfloor2 Trib_areawall = 6.88 ft
Transverse wind forces: Load Combination Factor: LCw:= 0.6
Distributed forces at roof: Fwntr= 14.psf pwhtw= 20.4.psf
Fdwind_t
LCW•max(Fwht Trib_arearooft+ pwhtwTrib_areawaii,8psf Trib_arearoof_t+ 16psfTrib_areawaii)
Force at roof: Fwind_t:= Fdwind_t'L Fwindt= 4352 lb Fdwind_t= 145.05•plf
Wind Loads Longitudinal Direction: 5= 16ft L= 30ft hmean= 14.38 ft
Longitudinal wind forces: pwhiw= 15.1•psf
Distributed forces at roof: Fdwind_i := LCWmax(Pwhiw,16psf)•(Trib_areawall + Trib_arearoof_i) Fdwind_I = 100.8•plf
Force at roof: Fwind_I Fdwind_r13 Fwind_I = 1613 lb
P:\O PROJECTS\24000\24500\24598 15160-792805
McGINNIS & ASSOCIATES JOB: TS Accessory Building
Consulting Engineers, Inc. #160-792805 NO. 24598
1110 Westmark Drive SHEET NO. 6 OF 14
Saint Louis, Missouri 63131-1735 CALC. BY SC DATE 4/20/2018
Determine Seismic Loads:
Occupancy Category: Occupancy:= "II„ Redundancy Factor: p:= 1.3
Max Considered Earthquake Coefficients: S := 0.877 S1 0,398 Load Combination LCE:= 0.7
modifer(service load)
Seismic Site Class: Site_Class:= "D"
Seismic Importance Factor: I 1.0
E•=
Site Coefficients: {tables 1613.5.3(1-2)} Fe= 1.15 Fv= 1.6
Adjusted Max considered Earthquake: Sms= 1.01 Sm1 = 0.64
Design Spectral Response Acceleration: Sds= 0.67 Sd1 = 0.43
Structural System: Basic_Structural_System := "Bearing Wall System"
Se ism ic_Resistmg_System := "Light Framed Walls w/Wood Shear Panels"
Response Modification Factor: R:= 6.4 {ASCE 7 table 12.2-1}
( 75
hpeakl
Approximate Fundamental Period: Te:= .020 •sec Ta= 0.17s
ft
Ts (Sd1 - Sds)'sec Ts = 0.63 s
Seismic Response Coefficient: Sds Sds 0.5•S1��
{Per ASCE 7 12.8} Cs if Si <0.6,max 0.01, R_ I ,max 0.01, R — I ,R— I Cs = 0.1
E/ E E//
Seismic Design Category: SDC= "D"
Determine Structural Dead Load: Ws
Area of Roof& Floor: Area:= L•5 Area = 480 ft2
Total Roof Dead Load: Wroof:= Area.DLroof+ DLIoft'300ft2 Wroof 7.8 kip
SLroof ( SLroof
Wroof shear f psf >30,Area \DLroof+ 5 Wroof
Exterior Wall Dead Loads Wall load tributary to roof:
Length of wall: Lwall:= L+ 5+ L+ B L 92 ft
wall =
Wall Dead Load: hmean
Wwall_shear:= DLwall'Lwall' Wwall_shear= 5.29•kip
Wwall of DLwall'Lwall'hmean Wwall_ot= 10.58-kip
Total Structural Dead Load: Ws_shear:= Wroof shear+ Wwall_shear+ 0.25.20psf•300ft2 Ws_shear= 15•kip
Ws_ot Wroof+ WwalLot W5_ot= 18.38-kip
Determine Total Base Shear Forces: FEQ:= LCE.p•Cs•WS shear
FdEQ t:= FEQ _ L FdEQ 1:= FEQ ± B
P:\0_PROJECTS\24000\24500\24598 TS160-792805
•
McGINNIS & ASSOCIATES JOB: TS Accessory Building
Consulting Engineers, Inc. #160-792805 NO. 24598
1110 Westmark Drive SHEET NO. 7 OF 14
Saint Louis, Missouri 63131-1735 CALC. BY SC DATE 4/20/2018
Compare Seismic Forces at Roof:
Wind and Seismic Forces: FEQ= 1.5.kip Fwind_t= 4.4•kip Fwind_I= 1.6•kip
FdEQ_t= 48.38•plf Fdwind_t= 145.05•plf Fdwind_I= 100.8•plf
FdEQ I = 90.71•plf
Use Maximum Forces: Froof t:= max(FEQ,Fwind_t) Frooft= 4351.5 lb
Froof I := max(FEQ,Fwind_I) Froof_I = 1612.8 lb
Fdrooft:= max(FdEQ_t,Fdwind_t) Fdrooft= 145.05•p l.(
FdroofI := max(FdEQ_I,Fdwind_I) Fdroof_I = 100.8•pli
Wind Governs Transverse Load. Seismic Governs"Longitudinal Load.
Roof Diaphragm Design:
Controlling Lateral Load: Transverse Load Govems Diaphragm Design. R R
• Strut Reaction, R: Rroof Fdrooft'0.5L Rroof= 2176 lb V L
< >
2 T
Fdrooft'L
Chord Forces (T = C): Tchord:=
8.13 Tchord = 1020 lb
/v
Fd 0.5L Roof
roof_t'
Diaphragm Shear, v: /roof = B vroof= 136•pli / Dlaphoag \ B
/
Diaphragm and Fasteners Design Strength: C
Roof deck is 7/16"wood floor sheathing with yr allow:= 214pli > <
8d common nails @6" o.c. at edges. Use 8d „ _ - - - — 1' -
common nails @12" o.c. for interior nailing.
Since yr 8110W= 214 lb/ft ' >= vroof = 136 lb/ft'OK V`'
P:\0_PROJECTS\24000\24500\24598 15160-792805
•
McGINNIS & ASSOCIATES JOB: TS Accessory Building
Consulting Engineers, Inc. #160-792805 NO. 24598
1110 Westmark Drive SHEET NO. 8 OF 14
Saint Louis, Missouri 63131-1735 CALC. BY SC DATE 4/20/2018
Consider Diaphragm Chord/Drag: chord:= "Double 2x4 Hem Fir Top Plate"
Area of Chord: Achord:= 10.5•int Fastener type: fastener:= "16d nails"
Chord Modulus of Elasticity: Echord:= 1200000•psi Allowable shear per fastener: Vfastener 89•Ib
Allowable Tension in Chord: Ft:= 400•psi Tchord
Load duration factor: CD:= 1.6 Number of Nails Required: Nfasteners:= v
fastener'CD
Pa:= Ft 0.5•Achord'CD Pa= 3360 lb
Use Double 2x4 Hem Fir Top Plate with 10- 16d nails each side of splice minimum_
Consider Drag Strut: dragspacing:= dragspadng= 7.85•in
'`roof_ Vfastener
Check Diaphragm Deflection:
lb
Panel Shear Modulus: Gtpanei := 38000— Nail Deformation: en = 0.002•in
(15/32" sheathing) in
Allowable Deflection: Aaiiow:= 0.025 hp
iatel
Deflection Amplification: Cd:= 4 {for WSP shear walls} Dallow= 2.33•in
5 VrooF L3 Vroof'L 0.188
Deflection: Ad:= + + •L.en
1.4 8•Echord'Achord'B 1.4 4•Gtpanel in
Cd'Od
Amplified Deflection: Od_ampi := I Od_ampl = 1.12•in
E
Since Ad_amPI= 1.1 in. <- = 2.3 in. OK
P:\0_PROJECTS\24000\24500\24598 TS160-792805
McGINNIS & ASSOCIATES JOB: TS Accessory Building
Consulting Engineers, Inc. #160-792805 NO. 24598
1110 Westmark Drive SHEET NO. 9 OF 14
Saint Louis,Missouri 63131-1735 CALC. BY SC DATE 4/20/2018
Consider 2x Wood Studs- Member:= "2x4" Number of Members: n:= 1
Selected Member Properties
Commercial #of b d Area SX l. E
Species Grade Member Size Mem. (in) (in) (in2) (in3) (in4) (ksi)
Hem-Fir Stud 2x4 1 1.5 3.5 5.25 3.06 5.36 1200
Plate Height: ht:= hfloor — 4.5in Unbraced Length k:= 1•C Unbraced Length: kl := k•ht k( = 7.38ft
2
Factor:
Compression Parallel to Grain
Non-Adjusted Design Value: F0= 800-ps
Grading Adjustment Factor: KcE:= 0.3 (See NDS Section 3.7.1)
Coefficient Used for Column c:= O. (See NDS Section 3.7.1)
- Stability Factor:
Maximum Bending Effective Length Factor:
Unbraced Length: Lu'= 12in (Ref NDS Table 3.3.3) k:= 1.84 Le := k Lu Le = 1.84 ft
Determine the allowable axial compressive stress per NDS Section 3.6
Adjustment Factors-NDS Table 2.3.1
CM Ct CF Ci Cr CT
1.00 1.00 1.00 1.00 1.15 1.00
Modified Modulus of Elasticity: E':= E•CM•Ct•C:CT E'= 1200000-psi
Stress used for column KcE•E'
stability factor: FcE FOE= 563.06-psi
r kl �2
�ddressed(id)/
(FcE\ (FcE -2
FcE
1 + — 1 + —
Fc Fc Fc
Column stability factor: CP:= 1 - c CP= 0.56
Zc 2c
Allowable axial compression
design stress w/ no lateral load: CD'= 1.15 F' .=•= F0•CD-CM•Ct CF Ci CP F'G No
_LL= 516 psi
Maximum Allowable
Axial Load w/ no lateral load: Fallow_No_LL A(id)•F'c_No_LL Paiicw_�Q LL= 2708 lb
Allowable axial compression
design stress with lateral load: CD 1.f Fc_w_LL •= FC-CD CF•Ci-CP F'c_w_LL = 718-psi
P:\0_PROJECTS\24000\24500\24598 15160-792805
McGINNIS & ASSOCIATES JOB: TS Accessory Building
Consulting Engineers, Inc. #160-792805 NO. 24598
1110 Westmark Drive SHEET NO. 10 OF 14
Saint Louis, Missouri 63131-1735 CALC.BY SC DATE 4/20/2018
Determine the allowable bending stress per NDS Section 3.3
i
Determine the slenderness Le-ddressed(id)
ratio: RB:= if L, >0•ft, ,1 RB= 5.86
bdressed(id)
2
Coefficient used for beam
stability factor: KbE:= 0.439 Stress value used for beam KbE'
E
stability factor: FbE 2 FbE= 15.34•ksi
RB
Tabulated bending design Fb_material = 675•psi
value from Table 4A:
Tabulated bending design Fbstar Fb_material•Cm-Ct.C1-CD-Cr
value multiplied by applicable
adjustment factors: - -
/ FbE \ / FbE \-2 FbE
l + 1 +
Fbstar Fbstar/ Fbstar
Beam stability factor: CLi L >0•ft, - -
,1.0 CL = 1
1.9 1.9 0.95
Allowable bending stress: Fb_allow Fb_material.CL.Cm.Ci-CD-Ct Cr Fb-allow- 1237•psi
Lateral pressure: Pwhtw= 20.4•psi Tributary width of member: twi • l6in
.dth
Maximum moment due
to lateral pressure: Mmax:= 0.75.(0.6.Pwhtw).twidth.ht2.0.125 Mmax= 83 ft•lb (ASCE LC ASD 6a)
Mmax
Maximum bending stress: fb:= Sx(Id) fb= 326-psi
I
Find the maximum compressive stress to /
satisfy the bending and axial compression lc,
\2
+ fb < 1.0 (NDS equation 3.9-3)
interaction equation. (NDS equation 3.9-3) F'oi fo
Fb_allow' 1 - -
Solving for the compressive
stress results in: fo = 363 psi
Maximum allowable
axial load w/ lateral load: Pallow_w_LL A(id) fo fallow w I L= 1908 lb
Controlling allowable axial load: eauow= 1908 lb Axial load w/lateral load governs
Rroof-DL+ O•75RroofLL
Required axial load capacity: Prequired
rtspacing_ twidth
Frequlred= 906.67 lb
4
5Pwhtw twidth'ht ht
Stud deflection @ midheight:
' `lateral= Olateral= 0.28 in = 314
384E•Ix(id) Aaterai
P:\0_PROJECTS\24000\24500\24598 TS160-792805
•
McGINNIS & ASSOCIATES JOB: TS Accessory Building
Consulting Engineers, Inc. #160-792805 NO. 24598
1110 Westmark Drive SHEET NO. 11 OF 14
Saint Louis, Missouri 63131-1735 CALC. BY SC DATE 4/20/2018
•
Shear Wall Design: Consider Walls A&C: Fr°°f_t= 4351.5 lb WindGoeems Transverse Load.
Consider wall A elevation as a "moment frame": Length of wall used in calculations: 'frame:= 14ft
Ma
Percentage of lateral force ""` _ _ _ _
taken by walls A&C:
JPercent:= 50701
Distributed load along frame:
Froof t•percent -
9
'frame
lb
= 155.41•—
ft
Worst case moment in continuous header(use(2)-2x12):
M := 1.002-kip-ft Sx:= 63.28•in3 f Mmax
max p� b:= S fb = 190.01•psi OK
S),
Worst case moment in plywood/stud "column":
At base: M 7.407•kip ft Sx:= 192 in3 fb_base
max_base — •— fb_base = 462.94•psi OK
Sx
At top: Mmax_top
Mmax_top •= 1.002 kip ft fb_top := fb_top = 62.63•psi OK
Sx
Hold down anchors required to resist moment at base:
Tension load from moment: T Mmax_base
base 20 in Tbase= 4444.2•Ib
Use Simpson HDU8 hold downs WI SSTB28 Anchor Bolts.
Tension straps required at top:
Tension load from moment at top: T := Mmax_top
Ttop 24in Ttop = 501.1b
Number of nails required to develop tension: N Ttop
nails•— 113.1b.1.6 Nnails= 2.77
Use Min. 20 Ga. Simpson Straps.
P:\0_PROJECTS\24000\24500\24598_TS 160-792805
McGINNIS & ASSOCIATES JOB: TS Accessory Building
Consulting Engineers, Inc. #160-792805 NO. 24598
1110 Westmark Drive SHEET NO. 12 OF 14
Saint Louis, Missouri 63131-1735 CALC. BY SC DATE 4/20/2018
Shear Wall Design: Consider Wall B:
Percentage of lateral force taken by wall B: Percent:= 50%
Total Wall Length: Iwall:= 24-ft+ 6in Length of Shear Wall:
Ishearwatl 24.ft+ 6ir
Seismic Force: FEQ= 1451.44 lb Longitudinal Wind Force: Fwlnd I = 1612.8 lb
Fastener type(penny weight): nail_size := 8 Sheathing grade: sheathing:= "Smart Panel"
Fastener spacing at edge: ed e_s acin 3
g p g:= 6.in Sheathing thickness: thickness:= —•in
Code provisions: 8
{18% reduction if hem-fir studs are used} {Reduction for panels applied over gypsum}
{40% allowable increase for wind design permitted} {Aspect ratio reduction for seismic}
Adjustment for perforated shearwall: max_height_opening;,:= 0.ft Minimum panel: ipanel 8.5ft
Perfortated multiplier: Co= 1 SDPWS Table 4.3.3.5
Shear Stress: FEQ•Percent Fwind rPercent
seismic vseismic = 30•plf vwind vwind = 33'Of
Ishearwall Ishearwall
For 0.375 in. Smart Panel applied directly to framing w/8d nails @ 6 in. edge spacing.
Seismic Design: Since "seismic = 30 lb/ft <_ vailow= 148 lb/ft OK
Wind Design: Since 'Vwind = 33 lb/ft <= wallow= 148 lb/ft OK
Check Uplift:
Roof Tributary Area: At 0'55
Overturning Moment: Mot EQ•:= FEQ•Percent•hfloor2= 5.62.kip•ft Mot_wind Fwind_I•Percent.hfloor2= 6.25•kip•ft
Resisting Moment: Iwall2 (wall
Mres_EQ (0.6— 0.14•Sds).�DLroof 2 •At+ DLwatrIshearwalrhfloor2• 2 Mres_EQ= 21.56•kip•ft
/ 2
Iwall (wail
Mres_wind:= 0.6. DLroof 2 'At+ DLwall•Ishearwalrhfloorz• 2 M 25.57•ki ft
es wind= p'
Chord Forces: tension := max(v h v
seismic plate> windh
plate tension = 255 lb OK
1Mot_EQ— Mres_EQ Mot_wind — Mres_wind\
Uplift Anchorage uplift:= max
at shear wall ends: IwalI lwall I uplift= —6511b
No Anchors Required
P:\0_PROJ ECTS\24000\24500\24598_TS 160-792805
McGINNIS & ASSOCIATES JOB: TS Accessory Building
Consulting Engineers, Inc. #160-792805 NO. 24598
1110 Westmark Drive SHEET NO. 13 OF 14
Saint Louis, Missouri 63131-1735 CALC. BY SC DATE 4/20/2018
Shear Wall Design: Consider Wall D:
Percentage of lateral force taken by wall D: Percent 50% {Note: Shearwall length is lower for
perforated walls.}
Total Wall Length: (wall:= 9•ft+ 6in Length of Shear Wall: ishearwall 6.ft+ Oln
Seismic Force: FEQ= 1451.44 lb Longitudinal Wind Force: = 1612.8 lb
Fastener type(penny weight): nail_size := 8 Sheathing grade: sheathing "Smart:= Panel"
Fastener spacing at edge: ed es acin 3
_
g p g := 4•in Sheathing thickness: thickness:= —•in
8
Code provisions:
{18% reduction if hem-fir studs are used} {Reduction for panels applied over gypsum}
{40% allowable increase for wind design permitted} {Aspect ratio reduction for seismic}
- Adjustment for perforated shearwall: max_height_opening = 4•ft Minimum panel:
panel ;_ 3f1:1
Perfortated multiplier: Co= 0.83 SDPWS Table 4.3.3.5
Shear Stress: FEQ•Percent Fwl
ind 'I'ercent
"seismic Vseismic = 145•plf Vwind:= "wind = 162•plf
Co•Ishearwall Co'Ishearwall
For 0.375 in. Smart Panel applied directly to framing w/8d nails @ 4 in. edge spacing.
Seismic Design: Since "seismic = 145 lb/ft <= valiow`= 171 Ib/ft OK
Wind Design: Since Ynrind = 162 ' lb/ft <_ "allow= 221 '' lb/ft OK
Check Uplift:
Roof Tributary Area: At'= 0.55
Overturning Moment: Mot_EQ:= FEQ•Percent hfloor2= 5.62•kip•ft Mot_wind Fwind_l-Percent hfloor2= 6.25 kip it
f
Resisting Moment: I'wall lwall
Mres_EQ:_ (0.6— 0.14-Sds) �DLroof' 2 At+ DLwall'Ishearwall'hfloor2' 2 Mres_EQ= 2.72 kip ft
2
Iwai) iwall
Mreswind:= 0.6 DLroof 2 'At+ DLwall'Ishearwall'hfloor2'2 Mres_wind= 3.23-kip-ft
f
f,
Mot_EQ Mot_wind
Chord Forces: tension := max
Co-Ishearwall Co-Ishearwall/ tension = 1252 lb OK
f
Uplift Anchorage Mot_EQ Mres_EQ Mot_mnd Mres_wind
at shear wall ends: uplift:= max — — uplift= 913 lb
Co.Ishearwall (wall Co'Ishearwall (wall
Provide HDU2 Holdowns
Unifom uplift force on sill anchor: Tsill max(vseismic,vwind)'3ft Tsill = 485 lb OK
P:\0_PROJECTS\24000\24500\24598 T5160-792805
•
McGINNIS & ASSOCIATES JOB: TS Accessory Building
Consulting Engineers, Inc. #160-792805 NO. 24598
1110 Westmark Drive SHEET NO. 14 OF 14
Saint Louis, Missouri 63131-1735 CALC. BY SC DATE 4/20/2018
Overall Overturning:
Driving Forces:
Overturning Moments:
Moti:= 0.6L(i'whtw'Trib_areawall'hfloor2+ pwhtr'Trib_arearoof_t'hfloor3) Mott= 39.21•kip•ft
Mote FEQ.hfloor2 Mote= 11.25 kip ft
B2 B2\
Uplifting Moment: Mupi;ft:= 0.6 \pw,tw•L•3. 8— — I' tl L• 8 / Muplift= —7.14•kip•ft
Combined Driving Moment: Mdrwing:= max(Moti,Moti + Muplift+Matz) Mdriving= 39.21•kip•ft
Resisting Moment: (Ws_ot•
B
Mres= 2 •0.6 Mres= 88.22•kip•ft
Since Mres 88.2Mdriving '' 39.2 OK
Foundation Design: Consider Continuous Wall Footings:
Maximum allowable bearing pressure: Fb:= 1000•psf
Roof Tributary Width: twraof:= 2 + hover
Wall Height: hfloor = 10.75 ft
3
Maximum axial load per foot of wall:
Rroof_DL+ .75Rroof_LL lb
Amax + DLwall'hfloor I'max= 766—
rtspacing 3 ft
Minimum footing width required:
Amax
bfooting F bfooting = 9.2.En
b
dfooting 12-in
Use 12" wide x 12" deep footing.'
P:\O_PROJECTS\24000\24500\24598_TS160-792805
TUFF SHED Truss: GO 1
1777 SOUTH HARRISON STREET JobName: 160-1212745-CLARK-GEIGER
SUITE 600 Designer TB
DENVER,CO 80210 Date: 04/09/18 09:46:08
Page: 1 of I
SPAN PITCH QTY OHL OHR CANT L CANT R PLYS SPACING WGT/PLY
16-0-0 10/12 2 0-10-0 0-10-0 0-0-0 0-0-0 2 36 in 95 lbs
17-8-0
3-0-0
2-5-11
OF10I 3-0-0 I 5 6-5 I 8-0-0 110 51111 13-0-0 I 16-0-0 Or10 0
3x4-
X 1 '
234- _ 4- .t���q��®�1��Z
10 112 ®�� 9-R-1°FE-
12 110
0 2X4 . 0.7_ . 24I �'�, G`NEt SO
0.1
2 C�
31[16/ 76-0 3x6 t 3
2 Il ... ' .
T 1, 5-0-3 ' 3
q '
i _ A , `tea'
11. .
10
9
02-0-I 5x8 I 5x8 I 04- . 'p11�si RVA
I3-0-0 10-0-0 3-0-0
3-0-0 I 13-0-0 1 16-0-0
All plates shown to be Eagle 20 unless otherwise noted. EXPIRES:
(1`,- jy(bd
Loading(psf) General CSI Deflection L/ (Loc) . ,Allowed _,.
TCLL: 40 Bldg Code. IRC2015/ TC: 0.85(4-5) Vert TL: 0.46 in L/405 (9-10) L/240
TCDL: 10 TPI1-2014 BC: 0.69(9-10) Vert LL: 0.25 in L/727 (9-10) L/360
BCDL: 0 RepMbr ber :No Web: 0.30(7-9) IlorzTT.: 0.01 in 8 RECEIVED
BCDL: 10 Lumber D.O.L.DOL: 115%
Reaction MAY 1 2018
JT Brg Combo Brg W dth Rqd Brg Width Max React Max Gray Uplift Max MWFRS Uplift Max C&C Uplift Max Uplift Max Horiz
11 1 3.5 in 2.05 in 2,491 lbs 195 lbs -18016x -19516x -414 lbs t�I'�ty d` c YC (�C9®
8 1 3.5 al 2.05 in 2,491 Lbs -I95 Lbs -1801bs -19516s lJ C E V f 1 Y1:Il
Material Bracing BUILDING DIVISION
TC: HF#2 2 x 4 TC: Sheathed or Purlins at 6-3-0,Purlin design by Others.
BC: HE#2 2 x 8 BC: Sheathed or Purlins at 10-0-0,Purlin design by Others.
Web: HF Stud 2 x 4
Loads
I)This truss has ken designed for the effects of wind loads in accordance withASCE7-10 with the following user defined input 135 mph(Factored),Exposure C,Enclosed,Gable/Hp,
Risk Category II,Overall Bldg Dims 16 ft x 20 ft,h=15 ft,End Zone Truss,Bods end webs considered.DOL=1.60
2)Unbalanced roof live loads have not been considered.
3)Minimum storage attic loading has been applied in accordance with IRC 301.5 -
Member Forces Table indicates:Member ID,max CSI,max axial Mice,(mix coupe melee if diffemnt Emma=axial fome).Only forces greater than 3001bs am shown in this table.
It 1-2 0.681 -849 lbs 5-6 0.630 -701 lbs
2-3 0.630 -701 lbs 6-7 0.681 -849 lbs
BC 9-10 0.693 555 lbs (-13 Lbs) - ...... ,.
Web 1-11 0.282 -1,371 lbs 3-5 0.148 -679 lbs 7-8 0.282 -1,371 lbs I
1-10 0.296 785 lbs 7-9 0.296 785 lbs
Notes
I)Unless noted otherwise,do not cut or alter any truss member or plate without prior approval from a Professional Engineer.
2)Attic floor area has been designed as a living area with 40 psf floor live load and a 10 psf floor dead load,and the interior vertical webs and ceding has been designed fora 5 psf dead load
3)The fabrication tolerance for this roof truss is 0%(Cq=1.00).
4)Brace bottom chord with approved sheathing or purlins per Bracing Summary.
5)Acreep factor of 1.50 has been applied for this truss analysis.
6)The forces shown for this multi-ply truss are per ply and the reactions are for ad plies Two identical trusses shall be built and attached as follows,per ply.12d Nails or Gun Nails[min.135'x3 1)8")TC 1 row @ 12 in cc,BC-2 staggered
rows@ 12 inoc,Vibbs-1 row@ 12 inoc.
7)When applied loads are on one side of girder,do not flip girder during girder connector installation,install connectors on the girder side where supported loads are applied.When applied loads are on both sides of girder,double the spacing
and install half of the connectors on one side of girder and then flip the girder to install the other half of the connectors on the opposite side(at double the connector spacing).Connectors on opposite sides of the girder shall be offset.
8)Lateral bracing shall be attached to each ply.
9)All fasteners minimum 2-1/2"long unless otherwise noted.
10)Nails in 1st and 2nd ply shall be offset from successive plies by 1/2 the nail spacing.
11)Listed wind uplift reactions based on MWFRS&C&C loading
12)Bottom chord in the open area of this truss meets 11360 for live load and 11240 for total load deflection criteria.
•
ALL PERSONS FABRICATING,HANDLING,ERECTING OR INSTALLING ANYTRUSS BASED UPON THIS TRUSS DESIGN DRAWING ARE INSTRUCTED TO REFER TO ALL Software v5.6.0.223
OF THE INSTRUCTIONS,LIMITATIONS AND QUALIFICATIONS SETFORTH IN THE EAGLE METAL PRODUCTS DESIGN NOTES ISSUED WITHTHIS DESIGN AND Eagle Metal Products
AVAILABLE FROM EAGLE UPON REQUEST.DESIGN VALID ONLY WHEN EAGLE METAL CONNECTORS ARE USED. Dallas,1x 75234
TUFF SHED
1777 SOUTH HARRISON STREET JobName:
Truss: GO 1
e: 160-1212745-CLARK-GEIGER
SUITE 600 Date: 04/09/18 09:46:22
DENVER,CO 80210 Page: 1 of 1
SPAN PITCH QTY OHL OHR PLYS SPACING WGT/PLY BRD FT/PLY
16-0-0 10/12 2 0-10-0 0-10-0 2 36 in 951bs 58.0
410I 17-8-0
3-0-0 2-6-5
2-5-11
3-0-0 I 5-6-5 I 8-0-0 I 0-5-111 I 3-0.0 I 6 0 000-103x6- I
4
211- AIL. 24_
10112 12110
2 2 I 0 7 '. 2x4 I
6
0
N
0 3x6111L3__1
111111
31
1 _ B1 ...
41Q
2x:_ 5x8 I 5X8 I 2x4 I
0-0-0
I
3-0-0 I 10-0-0 I 3-0- 0
3-0-0 13-0-0 16-0-0
Heel to Peak Top to Peak Overall Buss Height Overhang Rake Distance
Left Right g Left Right 10-2-0 Left Right
12-11-0 12-11-4 10-4-15 10-4-15 1-1-0 1-1-0
Plates
Notes ' - BDFT Loading(psi)
Qty Size Qty Size TC-1 row of 12d Nails or Gun Nails[min.135"x3 1/81 @ 12 in oc. Top Chords: 16.00 TCLL: 40
48 2x4 24 3x6 BC-2 staggered rows of 12d Nails or Gun Nails[min.135"x3 1/81 @ 12 in oc. Bottom Chords: 21.33 TCDL: 10
16 5x8 Webs-1 row 12d Nails or Gun Nails[min.135"x3 1/81 @ 12 in oc. Webs: 20.67 BCLL: 0
*Camber of 0.10 recommended. Non Structurals: 0.00 BCDL: 10
' T1,T2 OL: 11-8-14 B1 OL: 16-0-0 Wl OL: 2-9-2
2-6-3
39.8// 11-5-15 ^ /39.8/ 01 16-0-0 v 01 01 2-7-10 \39.8\
2-9-2
(8) 2 X 4 HF #2-12.00 (4) 2 X 8 HF #2-16.00 (8) 2 X 4 HF Stud-3.00
W2 OL: 3-8-1 W3 OL: 5-0-3 W4 OL: 4-0-7
3-5-4 4-9-4 3-4-1
3.2/ / 3-6-11 \36.7\ 01 4-10-12 \39.8\ 50.2// 3-8-4 -\50.2\
3-8-1 5-0-3 4-0-7
(8) 2 X 4 HF Stud-4.00 - (8) 2 X 4 HF Stud-6.00 - (4) 2 X 4 HF Stud-5.00 -
C i "-St <4.1
17
y c 72>73FIE y►
. tig° c- (AI,
1 ' 4BERA .
4RRE4 -
EXPIRES:(d /?i/"
I
TUFF SHED Truss:L01
1777 SOUTH HARRISON STREET JobName: 160-1212745-CLARK-GEIGER
SUITE 600 Designer: TB
DENVER,CO 80210 Date: 04/09/18 09:46:35
Page: 1 of 1
SPAN PITCH QTY OHL OHR CANT L CANT R PLYS SPACING WGT/PLY
16-0-0 10/12 2 0-10-0 0-10-0 0-0-0 0-0-0 1 24 in 129 lbs
17-8-0
•
4,0,0 8-0-016-0-0
6 0 Ot10 0
46-
FA
45 78 g
10 112 3 12!10
,15
N 2 10
O
1 11
22 s 23
1 i
4
m
A
•2
0 0-0 3x'1 3x.1 x.1 x.1 3x.1 3x.1 0-0-0
3x6 I 16-0-0 3x6 I
16-0-0
All plates shown to be Eagle 20 unless otherwise noted.
Loading(psi) General CSI Deflection L/ (roc) Allowed
TCLL: 40 Bldg Code: IRC2015/ TCi 0.74(6-7) Vert TL OinUP L/999 12 L/180
TCDL: 10 TPI 1-2014 BC: .0.01(16-17) Vert LL ..Oin L/999- 12 L/240
- BCLL: 0 Rep Mbr Increase:No Web: 0.64(1-21) HorzTL �.Oin - .
BCDL: 10 Lumber D.O.L.: 115% -
_ : Reaction
Brg Combo Brg Width Max React Ave React Max Gray Uplift Max MWFRS Uplift Max C&C Uplift Max Uplift Max Horiz
1 4791bs 159 p1f -2851bs -236Ibs -2851bs 1481bs
Material Bracing
TC -HF#2 2 x 4 TC: Sheathed or Purlins at 6-3-0,Purlin design by Others.
BC: HF#2 2 x 8 BC: Sheathed or Purlins at 10-0-0,Purlin design by Others.
Web: HF Stud 2 x 4 except.
._ -HF#2 2x 4: 1-21,11-12
Loads
1)This truss has been designed for the effects of wind loads in accordance withASCE7-10 with the following user defined input: 135 mph(Factored),Exposure C,Enclosed,Gable/I-hp,
Risk Category lI,Overall Bldg Dims 16 ft x 20 ft,h=15 ft,Frnl Zone Truss,Both end webs considered.'DOL=1.60
2)Unbalanced roof live loads have not been considered.
Member Forces Table. indicates:MertberID.MIX ca sax axial force,(max comer force if different&omm ix axial tome).Only forces Beater than 3001bs ale shown in this table.
TC .. 2-3 0.148 327 lbs (.66 lbs)5-6 0.740 349 lbs (-107 lbs)8-9 0.269. 491 lbs 4-581bs)I ,
3-4 0.269 491 lbs (-58 lbs)6-7 0.740 349 lbs (-107 lbs)9-10 0.148 327 lbs (-66 Ls)
4-5 0.424 625 lbs 7-8 0.424 625 lbs
ac
Web 2-20 0.093 310 lbs (-222 lbs) 10-13 0.093 310 lbs (-222 lbs)I
5-17 0.609 -450 lbs
7-16 0.609 -450 lbs „a
® Li ii
Notes
1)Unless noted otherwise,do not cut or alter any truss member or plate without prior approval from a Professional Engineer. - lI
2)Gable requires continuous bottom chord bearing. k'4. "'FA-6
3)Gable webs placed at 24"OC,U.N.O. 0..'"!...:,774 .11.,-"'A
4)Attach gable webs with 2x4 20ga plates,U.N.O. +;'C, ,,,,40 r' fes./ ,®
5)Bracing shown is for in-plane requirements.For out-of-plane requirements,refer to BCSI-B3 published by the SBCA. R'Z J " �/
6)The fabrication tolerance for this roof truss is 0%(Cq=1.00).
7)Acreep factor of 1:50 has been applied for this truss analysis (, �. ®
8)Listed wind uplift reactions based on MWFRS&C&C loading. " ! .y
'4 `'%3 ORE t•• ,�--
,
61RRE%
- EXPIRE ! / /1r?
ALL PERSONS FABRICATING,HANDLING,ERECTING OR INSTALLING ANYTRUSS BASED UPON THIS TRUSS DESIGN DRAWING ARE INSTRUCTED 10 REFER TO ALL Software v5.6.0223
OF THE INSTRUCTIONS,LIMITATIONS AND QUALIFICATIONS SETFORTH IN THE EAGLE METAL PRODUCTS DESIGN NOTES ISSUED WITTHTHIS DESIGN AND Eagle Metal Products
AVAILABLE FROM EAGLE UPON REQUEST.DESIGN VALID ONLY WHEN EAGLE METAL CONNECTORS ARE USED. Dallas,Tx 75234
TUFF SHED Truss:LO 1
1777 SOUTH HARRISON STREET JobName: 160-1212745-CLARK-GEIGER
SUITE 600 Date: 04/09/18 09:46:48
- DENVER,CO 80210 Page: 1 of 1
SPAN PITCH QTY OHL OHR PLYS SPACING WGT/PLY BRD FT/PLY
- 16-0-0 10/12 2 0-10-0 0-10-0 1 24 in 1291bs 77.3
17-8-0
41010 8-0-0 8-0-0 Or 010
- 8-0-0 I 16-0-0
4x6-
6
48
10 12 3 5 7 12 110
9
42 10
N
O
1 II
M 11
m
1 • 1 1 ii 81 ii 1 i •
2 3x. r.3x.13 I 3 I 3x.I 3x.10- 0 0 0
16-0-0
16-0-0
Heel to Peak Top to Peak Overall Truss Height Overhang Rake Distance
Left Right Left Right 10-2-0 Left Right
12-11-4 12-11-4 --- 10-4-15 10-4-15 1-1-0. 1-1-0
Plates Notes .., BDFT Loading(psi)
Qty Size Qty Size *Gable block plate size 2x4,typical. Top Chords: 16.00 TOLL: 40,
" 48 2x4 32 3x6 Bottom Chords: 2133 TCDL 10
4 4x6 Webs: 40.00 BCLL: 0
Non Structurals: 0.00 BCDL: 10
T1,T2 OL: 11-8-14 B1 OL: 16-0-0 A OL:. 2-9-2
2-6-3
39.8// 11-5-15 ^ /39.8/ 01 16-0-0 v 01 01 2-7-10 \39.8\
2-9-2
(4) 2 X 4 HF #2-12.00 (2) 2 X 8 HF #2-16.00 (4) 2 X 4 HF #2-3.00
B OL: 4-3-10 C OL: 5-11-10 D OL: 7-7-10
4-0-12 5-8-12 7-4-12
01 4-2-3 ... 39.8\ 01 5-10-3... \39.8\ 01 '7-6-3 _.-\.39.8\
4-3-10 5-11-10 7-7-10
(4) 2 X 4 HF Stud-5.00 (4) 2 X 4 HF Stud-6.00 (4) 2 X 4 HF Stud-8.00
E OL: 7-11-3
7-8-9
01 7-9-12 \39.8\ -
7-11-3
(4) 2 X 4 HF Stud-8.00 -
'i��.1:,r 4 0 RigC
Qr+
C ._' 72 73PE �Q
c.,,, ,
r•:0 OREG cLb-
IRRE%
4
- EXPIRES: /-t-/3/fit
i
TUFF SHED Truss: TO 1
1777 SOUTH HARRISON STREET JobName: 160-1212745-CLARK-GEIGER
SUITE 600 Designer: TB
- DENVER,CO 80210 Date: 04/09/18 09:45:25
Page: 1 of 1
SPAN PITCH QTY OHL OHR CANT L CANT R PLYS SPACING WGT/PLY
- 16-0-0 10/12 11 0-10-0 0-10-0 0-0-0 0-0-0 1 24 in 95 lbs
17-8-0
0-0
2-5-11
OF10I 3-0-0 15-6-5 I 8-0-0 1 10 5111113-0-0 I 16-0-0 �10{0
I4x1-
r_i
214- _y-
10 112 12 110
211 I ' 0-7— 214
0
ci
0 3x8/I 7-6-0 3x87 \
T12 / 5-0-3
Al 1
3
0
M lak.,.. 10-0-4
2x' I 58 5x8 x
41
0-0- P.
z0-0-0
3-0-0 10-0-0 3-0-0
I 3- 0-0 I 13-0 -0 16-0-0 I
All plates shown to be Eagle 20 unless otherwise noted.
'Loading(psi) General CSI - Deflection L/ . :Moe). . :Allowed
`TCLL': 40 Bldg Code: IRC 2015/ TC: 0.98(4-5) Vert TL: 0.61 in L/304 (9-10) ` L/240
TCDL:;10 TPI 1-2014 BC: 0.81(9-10) Vert LL:.. 0.34 in L/545 (9-10). L/360 _.
- -. BCLL 0 Rep Mbr Increase:Yes Web: 0.47(7-8) Horz TL: 0.01 in
BCDL: 10 Lumber D.O.L.: 115%
.:Reaction
if Brg Combo Brg Width Rqd Brg Width Max React Max Gray Uplift Max MWFRS Uplift Max C&C Uplift Max Uplift Max Horiz
11 1 3.5 in 2.73 in 1,661 lbs -130 lbs -120Ibs -130 lbs 276lbs
8 1 3.5 in 2.73 in 1,661 lbs • -130 lbs -120 lbs 130 lbs
Material Bracing
TC: HE#2 2 x 4 TC: Sheathed or Purlins at 4-7-0,Purlin design by Others.
BC: HE#2 2 x 8 BC: Sheathed or Purlins at 10-0-0,Purlin design by Others.
Web:•HFStud 2x4
Loads .
1)This truss has been designed for the effects of wind loads in accordance withASCE7-10 with the following user defined input 135 mph(Factored),Exposure C,Enclosed,Gable/Hip, - -
Risk Category II,Overall Bldg Dims 16 ft x 20 ft,h=15 ft,End Zone Truss,Both end webs considered.DOL=1.60 - -- -
2)Unbalanced roof live loads have not been considered.... .... ... .
3)Minimum storage attic loading has been applied in accordance with IRC 301.5
Member Forces Table indicates:Member 1D,max CSI,mu axial Tome,(max comer farce if different tom max axial tome).Only tomes greater than 309Ibs:am shown in this table.
TC 1-2 0.790 -1,132 lbs 56 0.731 -935 lbs
2-3 0.731 -933 lbs 6-7 ...0.790 -1.132 lbs _ _
BC 9-10 0.805 740 lbs (-171bs) - _... ._,..
Web 1-11 0.465 -1.828 lbs 2-10 0.167 358 lbs (-291 Ibs)6A 0.167 3581bs (-291 Ibs)I7-0 0.465 1,828 lbs I. .
I-10 0.394 1.047 lbs 3-5 0.330 -906 lbs 7A 0394 1,047lbs
Notes
1)Unless noted otherwise,do not cut or alter any truss member or plate without prior approval from a Professional Engineer. • ;.
2)Attic floor area has been designed as a living area with 40 psf floor live load and a 10 psf floor dead load,and the interior vertical webs and ceiling has been desig ed for a 5 psf dead load.. .__y_
3)The fabrication tolerance for this roof truss is 0%(Cq=1.00). v
4)Brace bottom chord with approved sheathing or purlins per Bracing Summary. r�- 1 C 1.-A.J R n
5)Acreep factor of 1.50 has been applied for this truss analysis. .�, '"1
6)Listed wind uplift reactions based on MWFRS&C&C loading - c`* P
7)Bottom chord in the open area of this truss meets L,360 for live load and L/240 for total load deflection criteria. "\X,S.3.'ti.:,t°' re-
7 73PE
Cip
OR:GO ��
`' .��� �lfBE�'.°'��
IrkARRE% '
EXPIRES: /ca.. b,/'a
ALL PERSONS FABRICATING,HANDLING,ERECTING OR INSTALLING ANYTRUSS BASED UPON THIS TRUSS DESIGN DRAWING ARE INSTRUC 1F)TO REFER TO ALL Software v5.6.0223
OF THE INSTRUCTIONS,LIMITATIONS AND QUALIFICATIONS SETFORTHIN THE EAGLE METAL PRODUCTS DESIGN NOTES ISSUED WITHTHIS DESIGN AND Eagle Metal Products
AVAILABLE FROM EAGLE UPON REQUEST.DESIGN VALID ONLY WHEN EAGLE METALCONNECTORS ARE USED. Dallas,TX 75234
•
TUFF SHED Truss: TO 1
1777 SOUTH HARRISON STREET JobName: 160-1212745-CLARK-GEIGER
SUITE 600 Date: 04/09/18 09:45:41
• DENVER,CO 80210 Page: 1 of 1
SPAN PITCH QTY OHL OHR PLYS SPACING WGT/PLY BRDFr/PLY
16-0-0 10/12 11 0-10-0 0-10-0 1 24 in 95 lbs 58.0
17-8-0
0 10 0 3-0-0 2-6-5 2-5-11 2-5-11 2-6-5 3-0-0 0 10 0
I 3-0-0 I 5-6- 5 I 8-0-0 110-5-1 1 I 13-0-0 I 16-0-0 f
4x6-
4
211- _ 254—
3..�rne�..
10112 12 10
211 0-7— 211.1
4
0 31/ 7-6-0 3x8\
T
M . s 5-0-3 11/` 4)
��� 100°
M ■ A
2xllill
)I Szpp 8 5x8 2x4
0-0-0 - 0-0-
3-0-0 10-0-0 3-0-0
3_0_0 I. 13-0-0 I 16-0 -0 I
Heel to Peak Top to Peak Overall Truss Height Overhang Rake Distance
Left Right Left Right, 10-2-0 Left Right
12-11-4 12-11-4 10-415 -_ _10-445 1-1-0 1-1-0 --
Plates
Plates Notes BDFT Loading(Ps1)
Qty Size Qty Size *Camber of 0.13 recommended. Top Chords: 16.00 TCLL: - 40
132 2x4 44 3x8 Bottom Chords: 21.33 TCDL: 10
22 4x6 44 5x8 Webs: 20.67 BCLL: 0
Non Structurals: 0.00 BCDL: 10
T1,T2 OL: 11-8-14 131 OL: 16-0-0 W1 OL: 2-9-2
2-6-3
39.8// 11-5-15 ^ /39.8/ 01 16-0-0 v 01 01 2-7-10 \\39.8\
2-9-2
(22) 2 X 4 HF #2-12.00 (11) 2 X 8 HF #2-16.00 (22) 2 X 4 HF Stud-3.00
W2 OL: 3-8-1 W3 OL: 5-0-3 W4 OL: 4-0-7
3-5-4 4-9-4 3-4-1
3.2/ L 3-6-11 - \\36.7\ 01 4-10-12 \\\39.8\ 50.2//.. 3-8-4 \\50.2\ '
3-8-1 5-0-3 4-0-7
(22) 2 X 4 HF Stud-4.00 (22) 2 X 4 HF Stud-6.00 (11) 2 X 4 HF Stud-5.00
c) PROPeo -
•.�i`
/F 01//sRA`, ' cP
WARRE
EXPIRES: /-' l r/'a