Permit (95) CITY OF TIGARD SITE WORK PERMIT COMMUNITY DEVELOPMENT Permit#: SIT2018-00002 TIC A P.T) 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 05/16/2018 Parcel: 2S102AC00203 Jurisdiction: Tigard Site address: NO ADDRESS Project: Fanno Creek Improvements Subdivision: BURNHAM TRACT Lot: 3 Project Description: Fanno creek restoration in Fanno Creek Park to restore habitat and improve water quality in the Tualatin River Basin. The project will stabilize new stream banks to improve channel function,floodplain connectivity,and aquatic habitat. Access off of SW Ash Ave,and located behind 9040 SW Burnham Street. Contractor: HENDERSON LLC Owner: CITY OF TIGARD 200 N STATE ST STE 103 13125 SW HALL BLVD LAKE OSWEGO, OR 97304 TIGARD, OR 97223 PHONE: 503-699-8999 PHONE: FAX: FEES Description Date Amount Specifics: Permit Fee-Site Work 04/04/2018 $5,299.42 Plan Review 03/05/2018 $3,444.62 Type of Use: COM 12%State Surcharge-Building 04/04/2018 $635.93 Class of Work: ALT Info Process/Archiving-Lg$2.00(over 04/04/2018 $48.00 Project Valuation: 11x17) $1,100,000.00 Info Process/Archiving-Sm$0.50(up to 04/04/2018 $10.00 11x17) Erosion Control w/Development 04/04/2018 $911.40 Site Specifics: Excavation Volume: 10164 cu.yd. Fill Volume: 7879 cu.yd. Impervious Surface: 13396 sq.ft. Engineered Fill: Yes Soil Report Required: Yes Paving: Yes Grading: Yes Landscaping: Yes Site Prep: Yes Storn Drains: Retaining Wall: No Fire Underground: No Accessible Parking: No Fence: Total $10,349.37 Required Items and Reports(Conditions) 1 Ersn Cntrl 503-639-4175 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: Permittee Signature: .i1,L?//���. Call 503.639.4175 by 7:00 a.m.for the next availabl• inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application Rfct ivE .. ,_ s. Site Work FOR OFFICE USE ONLY - City of Tigard Received W _ II 'I 13125 SW Hall Blvd.,Tigard,OR 97223 1018 Date/B : .411 f W. ; MU. Permit No.: . j ,� �t„‘ Phone: 503.718.2439 Fax: 503.598.19fi ,R J Date/By: —i A M,,..4 TI GA RD Inspection Line: 503.639.4175 / Y � �� b Other Permit: +✓ 1 kJ! 1.1 tIAAL7 Date Ready/By: 7 Juns: 0 See Page 2 for Internet www.tigard-or.gov BUILDING ' �) i No ified/Method: (� 1 L.)//�„It/ "1" ...0 Supplemental Information IV . C J'r " arrM iia` ,. .. C , 0 New construction ®Demolition Permit fees*are based on the value of the work performed. 121 Indicate the value(rounded to the nearest dollar)of all Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the 1 o r } 1 ` l i work indicated on this application. ❑ 1-and 2-family dwelling ❑Commercial/industrial Valuation: $ LIAccessory building El Multi-family Number of bedrooms: ❑Master builder 6z Other:Stream&Trail Construction Number of bathrooms: ` ,i 4:.,,,,,. TE ' �M ®a 7i;l a.1 , i Total number of floors: Job site address: NA New dwelling area: square feet City/State/ZIP:Tigard,OR 97223 Garage/carport area: square feet Suite/bldg./apt.no.: NA Project name:Fanno Creek Improvements-Ash to Main Covered porch area: square feet Cross street/directions to job site:Southwest of SW Burnham St.,South of SW Main St.,access Deck area: square feet from SW Ash Ave.Site is located behind 9040 SW Burnham Street. Other structure area: square feet Subdivision: - � .', ''',-!,,,1--,71-1'40,--1 Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.: 2S102AC00203;2S102AC00204;2 102AD02800;2. 102DB00500 Indicate the value(rounded to the nearest dollar)of all r m,1_ 41,,,,_ equipment,materials,labor,overhead,and the profit for the °-., '., a It - _,, .1,1,:„,,,n,,,11, 4 , ,, work indicated on this a..lication. **Please see attached Project Description Valuation: S ' 1' 1 -r Existing building area: square feet New building area: square feet . - i , Number of stories: ot t Name: City of Tigard Type of construction: ; * ' Address: 13125 SW Hall Blvd Occupancy groups: - ' City/State/ZIP: Tigard,OR 97223 Existing: New: Business name: Clean Water Services ' - - ' ' - - - - All contractors and subcontractors are required to be Contact ' licensed with the Oregon Construction Contractors Board - •, Hwy under ORS 701 and may be required to be licensed in the jurisdiction in which work is being performed.If the •• •' ' applicant is exempt from licensing,the following reasons Phone: apply: • . . a Business name: -% • ille4 Address: A UD 44,,,]-C 5m- 7`T 57`r eel— /0_.? � �� City/State/ZIP: Structural plan review fee(or deposit): d Sci��p/ 0`Q 770.2 ' FLS plan review fee(if applicable): Phone:( ) Fax:( ) CCB lie.: ��] Cli t,i Total fees due upon application: Authorized signature: /� Amount received: C " „ This permit application expires if a permit is not obtained Print name: Matthew Brennan Date: within 180 days after it has been accepted as complete. -�':/ ///f * Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\SIT-PermitApp.doc 08/02/2016 440-4613T(11/02/COM/WEB) City of Tigard: Site Work Permit Checklist Page 2- Supplemental Information Commercial,Multi-Family and One-and Two-Family Dwellings: No permit is required if fill is less than 50 yards(5 dump truck loads),or less than 3 feet deep and will not be supporting a structure. If a building will be constructed on the fill, it must be engineered fill. If fill is in a flood plain,drainage way, or wetland,the applicant must apply for a sensitive lands review (SLR). Please complete all items below,unless otherwise noted. Excavation Volume: (See attached Fill/Removal Impact Table) cu.yds. Grading Volume: (Soils report required for>5,000 cu.yds.) 10,164 cu.yds. Fill Volume: (Fill exceeding 12"in depth shall be compacted to 90%of maximum density) 7,879 cu.yds. Retaining structure? (Check one) ❑ Rock ❑ CMU ❑ Concrete ❑ Other: *Total new impervious area including all buildings, sidewalks,and pavin13,396 sq. ft. . l'' ` :=iOV '0;,,i-i--7,'-.± X 1. = ': !.•,'.'167.-0 ='6 I`"`; TM'rte_ q% ��." Iw „ � 1 „� Site Utilities Plumbing Work: Complete the Plumbing Permit Application for site utilities plumbing work. Plans Required: See"Site Work Permit Application-Plan Submittal Requirements"attached. The following must accompany this application: ❑ Site Plan with Vicinity Map showing ADA ❑ *Parking(including ADA)and Lighting compliance Plan ❑ Grading Plan and details ❑ *Landscaping Plan ❑ Erosion Control Plan and details ❑ Soils Report(if required) ❑ Retaining Structures *Does not apply to One-and Two-family dwellings. Plan Submittal: �i O �P - T A ' a 1--' - Permit Fee: moi' d� � �����G i� �14*'A ahrI 1 >4'� t ire t'= i i i E ti rash � pi�� �' ipp. "`ti° M 1 1� ,-r h ,,�" ����:: ng. , ,ii �� ��L "a dpi► _ w� :�4 1'004,1,t .00 e r �,.- p. 'AL'Air Ii $.00 to$500.00 $51.09 minimum permit fee Commercial 3 $500.01 to$2,000.00 $51.09 for the first$500.00 and $2.69 for each additional$100 or fraction thereof,to and including$2,000.00. Multi-Family R-1 Occupancy 3 $2,000.01 to$25,000.00 $91.44 for the first$2,000.00 and $10.76 for each additional$1,000 or fraction thereof,to and including One-&Two-Family Dwelling 3 $25,000.00. $25,000.01 to$50,000.00 $338.92 for the first$25,000.00 and $8.06 for each additional$1,000.00 or fraction thereof,to and including $50,000.00. $50,001.00 to$100,000.00 $540.42 for the first$50,000.00 and $5.38 for each additional$1,000.00 or fraction thereof,to and including $100,000.00. $100,000.01 and over $809.42 for the first$100,000.00 and $4.49 for each additional$1,000.00 or fraction thereof. I:\Building\Permits\SIT-PermitApp.doe 12/30/05 440-4613T(11/02/COM/WEB) City of Tigard " COMMUNITY DEVELOPMENT DEPARTMENT 1,1 i TIGARD Building Permit Review — Commercial - No Land Use Building Permit #: 51.7- f mac;t:a - 2S 102 peoo oU Site Address: 2,5102AC00LO" 28`UzAFCOJZ '9J 2.S102 4i002g00' / Suite/Bldg#: — Project Name: Farm& (reek Impa/ernel (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: 'En6Ste kkAN ( rt- r re-rov4tri 4'k [rttLi (C((ag 64A tt si-1 j. p. r^ / b h rjt i4II (L/ tolor4L,(.,t crtAk & Aix..) malli-,* WI Existing Business Activity: _ ,Pg. Proposed Business Activity: f g //3 Verify site address/suite#exists and active in permit s�yste . LSI,River Terrace Neighborhood: ❑ Yes LIQ No [VP/ d/Zoning: Pk —/ LU' Permitted Use: [fl Yes 0 No 0 Spec Space 10 Confirm no land use required. 104 Business License: Exists: 0 Yes ❑ No,applicant notified to obtain business license Notes: �)(•t.rn j ram Iwf Jyt,,„pt.— Ci17 dia 7gt:trr D&it p. -c . 9'.SIO,02.0,C.2- Approved by Planning: 4_6,4 urix, Date: 3-S---)f Revisions (after Building Submittal only) Reviewer Date Revision 1: 0 Approved ❑ Not Approved Revision 2: 0 Approved 0 Not Approved Revision 3: 0 Approved 0 Not Approved Building Permit Submittal Original Submittal Date: # 3/577/b.' Site Plans: Building Plans: Building Permit#: PEater building permi #above. Workflow Routing: ��/Pl ning ermit Coordinator ding 19� o.y a,, { Workflow Sign-off: 'Sign-off for Planning(include notes from planning review) Route Application Documents: [i�g: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: ,` . r __ Date: /7/11 BBuildingTormsTldgPermitRvw COM_NoLandUse 060116.docx Engineering iReviewad -1 ' pe at ng p : �J ❑ PFI Permit#: VA- O Conditions"Met"prior to issuance of building permit ❑ Easements (encroachments)per engineering conditions of approval and plat(not typical on SDIt/CUP) O Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: 0 Yes 0 No Assess Water Quantity Fee in-lieu: 0 Yes 0 No LIDA Facility on lot: 0 Yes 0 No ❑ NOT Approved by Engineering: Date Notes: Approved by Engineering: AlfKf-1,,- U.) - Date: 6 Revisions (after Building Submittal only) Reviewer Date Revision 1: 0 Approved 0 Not Approved Revision 2: 0 Approved 0 Not Approved Revision 3: 0 Approved 0 Not Approved Permit Coordinator Review ❑ Conditions"Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: DC Fees Entered: Wash Co Trans Dev Tax: 0 Yes T""/A Tigard Trans SDC: 0 Yes N/A Parks SDC: 0 Yes jiii N/A OK to Issue Permit 7- Approved by Permit Coordinator: Date: 3 /8// . ..--------------- I:1BuildingWorms\BldgPennitRvw_COM_WithLandUse_070915.docx MAR N18 8 CITY OF T GA PROJECT DESCRIPTION � l a I)l V S Oj CLEAN WATER SERVICES FANNO CREEK IMPROVEMENTS-ASH TO MAIN PROJECT#6474 This project would enhance Fanno Creek,Stream B, and the three adjacent wetlands.This design is being driven by the City of Tigard Fanno Creek Park Master Plan and Clean Water Services'intent to restore habitat and improve water quality in the Tualatin River Basin, including Fanno Creek.The project would re-meander a previously straightened reach and stabilize new stream banks to improve channel function,floodplain connectivity, and aquatic habitat.The project would also interconnect the historic Fanno Creek channel as a backwater and reconnect Stream B and Stream C(tributaries to Fanno Creek), replace invasive vegetation with native plant communities, replace an existing bicycle/pedestrian bridge and reconfigure the multiuse path to maintain trail connectivity,and install two new culverts under the multiuse path to connect the previously disconnected oxbow channel and connect the reconfigured Stream B channel to Fanno Creek.The reconfiguration of the multiuse path would add 13,396 square feet of new impervious surface and remove 8,966 square feet of impervious surface. 2.35 acres would be temporarily disturbed to implement the project. See Project Plan Set for details. 4 Y v MAR STORMWATER TREATMENT STRATEGY lti i ' AF FANNO CREEK IMPROVEMENTS-ASH TO MAIN CITY § v a PROJECT#6474 51 A I ( I)IVIS The Fanno Creek Improvements—Ash to Main project involves removal of 8,966 square feet of existing impervious area, and construction of 13,396 square feet of new impervious area (approximately 2,677 square feet of the new impervious area would count as "modified impervious area", as it is in the location of removed pavement).The paved trails to be removed and constructed are immediately adjacent to wetlands and waters, making implementation of on-site water quality treatment of stormwater not practicable. Per Section 4.05.5 of Clean Water Services (District's) Design and Construction Standards (D&C Standards), the total new and existing impervious areas (13,336 square feet) on site are required to be treated. Treatment of off-site runoff(Section 4.05.4 of the D&C Standards)from the private lot to the north of the project site was investigated as an alternative to on-site treatment.The untreated parking lot currently discharges stormwater to the project area through dispersed sheet flow. However,the parking lot area is much larger than that allowed by the Vegetated Corridor Filter Strip BMP (Section 4.06.11 of the D&C Standards). For this reason the District requests to pay Fee-In-Lieu as provided for under Section 4.05.2 of the D&C Standards for 13,336 square feet of proposed new impervious surface (Pedestrian Trail-See sheet CS-01 of Plan Set). Additionally, as provided for under Chapter 2, Section 4, Sub Section 2m of Clean Water Services Design and Construction Standards,the District requests that the requirement for submittal of a Drainage Report be waived for the Ash to Main project.The project is a stream construction/enhancement project and post development impervious surfaces will constitute less than 25%of parcel. In addition, runoff from the paved portions of the site will remain dispersed rather than concentrated for conveyance. For this reason, calculation of stormwater discharge peak flows does not serve a design purpose. I (10) CITY/COUNTY PLANNING DEPARTMENT LAND USE AFFIDAVIT • (TO BE COMPLETED BY LOCAL PLANNING OFFICIAL) I have reviewed the project described in this application and have determined that: 0 This project is not regulated by the comprehensive plan and land use regulations. F(F) This project is consistent with the comprehensive plan and land use regulations. v9) .. This project will be consistent with the comprehensive plan and land use regulations when L3the following local approval(s) are obtained: OR 5 C018 In Conditional Use Approval CITY OF TIG ARD 0 Development Permit El Other Permit(see comment section) BUILDING DIVISION El This project is not consistent with the comprehensive plan. Consistency requires: 0 Plan Amendment 0 Zone Change 0 Other Approval or Review (see comment section) An application 0 has 0 has not been filed for local approvals checked above.(N/A) Local planning official name(print) Title City/County (circle one) Lina Smith Assistant Planner City of Tigard Signature Date --....: &e/4,_ 2/13/17 - Comments: This project is exempt from the provisions in Chapter 18.775 Sensitive Lands of the City of Tigard Community Development Code, as outlined in Section 18.775.020.C.2. (11) COASTAL ZONE CERTIFICATION If the proposed activity described in your permit application is within the Oregon coastal zone,the following certification is required before your application can be processed.A public notice would be issued with the certification statement, which would be forwarded to the Oregon Department of Land Conservation and Development(DLCD)for its concurrence or objection. For additional information on the Oregon Coastal Zone Management Program,contact DLCD at 635 Capitol Street NE, Suite 150, Salem, Oregon 97301 or call 503-373-0050. CERTIFICATION STATEMENT I certify that,to the best of my knowledge and belief, the proposed activity described in this application complies with the approved Oregon Coastal Zone Management Program and would be completed in a manner consistent with the program. Print/Type Name Title Signature Date 15 March 2014 CE MAR 5 2018 CITY OF TIGARD PROJECT DESCRIPTION :BUILDING DIV SION CLEAN WATER SERVICES FANNO CREEK IMPROVEMENTS-ASH TO MAIN PROJECT#6474 This project would enhance Fanno Creek, Stream B, and the three adjacent wetlands.This design is being driven by the City of Tigard Fanno Creek Park Master Plan and Clean Water Services' intent to restore habitat and improve water quality in the Tualatin River Basin, including Fanno Creek.The project would re-meander a previously straightened reach and stabilize new stream banks to improve channel function,floodplain connectivity, and aquatic habitat.The project would also interconnect the historic Fanno Creek channel as a backwater and reconnect Stream B and Stream C(tributaries to Fanno Creek), replace invasive vegetation with native plant communities, replace an existing bicycle/pedestrian bridge and reconfigure the multiuse path to maintain trail connectivity, and install two new culverts under the multiuse path to connect the previously disconnected oxbow channel and connect the reconfigured Stream B channel to Fanno Creek.The reconfiguration of the multiuse path would add 13,396 square feet of new impervious surface and remove 8,966 square feet of impervious surface. 2.35 acres would be temporarily disturbed to implement the project. See Project Plan Set for details. i_101114 _ . STORMWATER TREATMENT STRATEGY MAR 5 %fill` FANNO CREEK IMPROVEMENTS-ASH TO MAIN CITY OF TIGARD PROJECT#6474 BUILDING DIVISION The Fanno Creek Improvements—Ash to Main project involves removal of 8,966 square feet of existing impervious area, and construction of 13,396 square feet of new impervious area (approximately 2,677 square feet of the new impervious area would count as "modified impervious area", as it is in the location of removed pavement).The paved trails to be removed and constructed are immediately adjacent to wetlands and waters, making implementation of on-site water quality treatment of stormwater not practicable. Per Section 4.05.5 of Clean Water Services (District's) Design and Construction Standards (D&C Standards),the total new and existing impervious areas (13,336 square feet) on site are required to be treated. Treatment of off-site runoff(Section 4.05.4 of the D&C Standards)from the private lot to the north of the project site was investigated as an alternative to on-site treatment.The untreated parking lot currently discharges stormwater to the project area through dispersed sheet flow. However, the parking lot area is much larger than that allowed by the Vegetated Corridor Filter Strip BMP (Section 4.06.11 of the D&C Standards). For this reason the District requests to pay Fee-In-Lieu as provided for under Section 4.05.2 of the D&C Standards for 13,336 square feet of proposed new impervious surface (Pedestrian Trail-See sheet CS-01 of Plan Set). Additionally, as provided for under Chapter 2, Section 4, Sub Section 2m of Clean Water Services Design and Construction Standards,the District requests that the requirement for submittal of a Drainage Report be waived for the Ash to Main project.The project is a stream construction/enhancement project and post development impervious surfaces will constitute less than 25%of parcel. In addition, runoff from the paved portions of the site will remain dispersed rather than concentrated for conveyance. For this reason, calculation of stormwater discharge peak flows does not serve a design purpose. (10) CITY/COUNTY PLANNING DEPARTMENT;LAND USE AFFIDAVIT (TO BE COMPLETED BY,LOCAL PLANNING.OFFICIAL)„ I have reviewed the project described in this application and have determined that: ❑This project is not regulated by the comprehensive plan and land use regulations. TrI This project is consistent with the comprehensive plan and land use regulations. C )/ , This project will be consistent with the comprehensive plan and land use regulations when the following local approval(s) are obtained: MAR 5, n18 ®Conditional Use Approval CITY OF T GA D Development Permit ❑Other Permit(see comment section) BUILDING DIVISION' This project is not consistent with the comprehensive plan. Consistency requires: ❑Plan Amendment ID Zone Change 0 Other Approval or Review(see comment section) An application IJ has 0 has not been filed for local approvals checked above. (N/A) Local planning official name(print) Title City/County (circle one) Lina Smith Assistant Planner City of Tigard Signature Date 1. 2/13/17 Comments: This project is exempt from the provisions in Chapter 18.775 Sensitive Lands of the City of Tigard Community Development Code, as outlined in Section 18.775.020.C.2. (11) COASTAL ZONE CERTIFICATION ,..2 .. „ If the proposed activity described in your permit application is within the Oregon coastal zone,the following certification is required before your application can be processed.A public notice would be issued with the certification statement, which would be forwarded to the Oregon Department of Land Conservation and Development(DLCD)for its concurrence or objection. For additional information on the Oregon Coastal Zone Management Program,contact DLCD at 635 Capitol Street NE, Suite 150, Salem,Oregon 97301 or call 503-373-0050. CERTIFICATION STATEMENT I certify that,to the best of my knowledge and belief,the proposed activity described in this application complies with the approved Oregon Coastal Zone Management Program and would be completed in a manner consistent with the program. Print/Type Name Title Signature Date 15 March 2014