Loading...
Permit (97) CITY OF TIGARD SITE WORK PERMIT INa . COMMUNITY DEVELOPMENT Permit#: SIT2018 00009 T i GFF;C3 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 05/31/2018 A Parcel: 2S1138000600 Jurisdiction: Tigard Site address: 16320 SW 85TH AVE Project: CLEAN WATER SERVICES Subdivision: None Lot: None Project Description: Secondary Treatment System:Site work for expansion of the secondary treatment system,including new aeration basin,new secondary clarifier,electrical building,odor control,and expansion of tunnels. Contractor: MCCLURE&SONS INC Owner: CLEAN WATER SERVICES 15714 COUNTRY CLUB DR 2550 SW HILLSBORO HWY MILL CREEK,WA 98012 HILLSBORO, OR 97123 PHONE: 425-316-6999 PHONE: FAX: FEES Description Date Amount Specifics: Permit Fee-Site Work 05/17/2018 $7,230.12 Plan Review 04/23/2018 $4,699.58 Type of Use: COM 12%State Surcharge-Building 05/17/2018 $867.61 Class of Work: ALT Info Process/Archiving-Lg$2.00(over 05/17/2018 $36.00 11x17) Project Valuation: $1,530,000.00 Erosion Control w/Development 05/17/2018 $1,286.40 Site Specifics: Excavation Volume: 92000 cu.yd. Fill Volume: 50600 cu.yd. Impervious Surface: 61000 sq.ft. Engineered Fill: Yes Soil Report Required: Yes Paving: Yes Grading: Yes Landscaping: Yes Site Prep: Yes Storn Drains: Retaining Wall: No Fire Underground: No Accessible Parking: Fence: No Total $14,119.71 Required Items and Reports(Conditions) 1 Ersn Cntrl 503-639-4175 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules at opted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-00 0. ou may obt•' a cop, rules or direct questions to OUB b calling 3.232.1987 or 1.800.332.2344. / Issued By: 11.. �. �r Permittee Signature: �,./ Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application Site work FOR OFFICE USE ONLY Received „1,,/ Permit No.. S t+� ��l, City of Tigard DateBy: / t_t� �`L , 14 - 13125 SW Hall Blvd.,Tigard,OR 97223 Plan Review— Other Permit: �lw it • Phone: 503.718.2439 Fax: 503.598.1960 , ,, ;i, '` Date/By: "•� ' Inspection Line: 503.639.4175 ., /• , Juris: ® See Page 2 for Date Ready/By: 7 TIGARD p , Notified/Method: 5/ fi jd Supplemental Information Internet: www hgazd or gov af P= ° � �J: i n " t 5 liut4 ,°ia, ? ` *-rr� -rs iK= 4V.w+1iVt'cl.,. * lb ®New construction 0 Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ❑Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the ,: 5 , lu: �� work indicated on this application. 11 t r�RAJ '� .. .�K �P, � Valuation: $ ❑ 1-and 2-family dwelling ®Commercial/industrial Number of bedrooms: ❑Accessory building 0 Multi-family Number of bathrooms: 0 Master builder 0 Other: o ,t u * 9* Total number of floors: Job site address:16320 SW 85th Ave New dwelling area: square feet City/State/ZIP:Tigard,OR 97224 Garage/carport area: square feet Suite/bldg./apt.no.: Project name:Phase 5 Secondary Covered porch area: square feet Cross street/directions to job site: Treatment System Expansion Deck area: square feet Durham Road and SW 85th Ave Other structure area: square feet 0.4 ` ►fix *1r a"97-4,;,,..,, „,,:,),,,c,,,, L .r, psi” R t,e4 a y, - 1 m,. 7i' Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Tax map/parcel no.: equipment,materials,labor,overhead,and the profit for the r�� ie " * work indicated on this application. -07-4-9,719,944N144, 4 � , it .;� is 4 4 o Valuation: $1,530,000.00 Expansion of the secondary treatment system,including new aeration basin,new Existing building area: square feet secondary clarifier,electrical building,odor control and expansion of the tunnels. ;`_ f 4TH --- ` a r a u.- �`s� v, 1stories: II Name:Clean Water Services Type Address:16060 SW 85th Ave Occupancy groups: City/State/ZIP:Tigard,OR 97224 Existing 6 Phone:(503)547-8043 Fax ( ) / 4F1 -,',.,17.-;,, 4P � = .,.,. . � i_�� < fi ( � Cr,-; ` t �"s ° Business name:Clean Water Services All contractors and subcontractors are required to be licensed with the Oregon Construction Contractors Board -/ Contact name:Dan Garbely under ORS 701 and may be required to be licensed in the Address:16060 SW 85th Ave jurisdiction in which work is being performed.If the applicant is exempt from licensing,the following reasons City/State/ZIP:Tigard,OR 97224 apply: Phone:(503)547-8043 Fax::( ) E-mail:garbelyd@cleanwaterservices.org Business name: A l..c.1.(� / �. , ttf., Address: < L^u��1 / ._„1„ Structural plan review fee(or deposit)4ii y C11.53 City/State/ZIP: ��,,( cc rC L /4�J Qty l,. FLS plan review fee(if applicable): Phone:(i.126) 5' - 6 co 1 Fax:( j) 5'I 7<‘41 Total fees due upon application: CCB lic.: 7/' 7 Amount received: Authorized signatures: � This permit application expires if a permit is not obtained _.....;",,,e2,/ �/ �e-r_J within 180 days after it has been accepted as complete. Print name: /Z1ellAt'-4_, &,.r ayl Date: A* * Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\SIT-PermitApp.doc 08/02/2016 440-4613T(11/02/COM/WEB) City of Tigard: Site Work Permit Checklist Page 2 -Supplemental Information Commercial,Multi-Family and One-and Two-Family Dwellings: No permit is required if fill is less than 50 yards(5 dump truck loads), or less than 3 feet deep and will not be supporting a structure. If a building will be constructed on the fill, it must be engineered fill. If fill is in a flood plain, drainage way, or wetland,the applicant must apply for a sensitive lands review (SLR). Please complete all items below,unless otherwise noted. Excavation Volume: 92,000 cu.yds. Grading Volume: (Soils report required for>5,000 cu.yds.) 2,500 cu.yds. Fill Volume: (Fill exceeding 12"in depth shall be compacted to 90% of maximum density) 50,600 cu.yds. Retaining structure? (Check one) ❑ Rock ❑ CMU ❑ Concrete ❑ Other: *Total new impervious area including all buildings, sidewalks, and 'avin 61,000 se ft. 41' Site Utilities Plumbing Work: Complete the Plumbing Permit Application for site utilities plumbing work. Plans Required: See"Site Work Permit Application-Plan Submittal Requirements"attached. The following must accompany this application: ❑ Site Plan with Vicinity Map showing ADA ❑ *Parking(including ADA)and Lighting compliance Plan ❑ Grading Plan and details ❑ *Landscaping Plan ❑ Erosion Control Plan and details ❑ Soils Report(if required) ❑ Retaining Structures *Does not apply to One-and Two-family dwellings. ti a Plan Submittal: Permit Fee: TYPE OF S ITTAL of Plans r °m• t a (1e*10diito0 it s iRequ0cl:r t 7 $.00 to$500.00 $51.09 minimum permit fee � It r tioai 4' x # ^` mitta $500.01 to$2,000.00 I� � y , �� ,� $51.09 for the first$500.00 and Commercial 3-A 71111 $2.69 for each additional$100 or fraction thereof,to and including$2,000.00. $2,000.01 to$25,000.00 $91.44 for the first$2,000.00 and Multi-Family R-I Occupancy 3 $10.76 for each additional$1,000 or fraction thereof,to and including One-&Two-Family Dwelling 3 $25,000.00. $25,000.01 to$50,000.00 $338.92 for the first$25,000.00 and $8.06 for each additional$1,000.00 or fraction thereof,to and including $50,000.00. $50,001.00 to$100,000.00 $540.42 for the first$50,000.00 and $5.38 for each additional$1,000.00 or fraction thereof,to and including $100,000.00. $100,000.01 and over $809.42 for the first$100,000.00 and $4.49 for each additional$1,000.00 or fraction thereof. I:\Building\Permits\SIT-PermitApp.doc 08/02/2016 2 City of Tigard ® COMMUNITY DEVELOPMENT DEPARTMENT I T l c n u n Building Permit Review — Commercial - No Land Use Building Permit #: sL_ Olr a)U(9 q Site Address: & ,2e, S10 ac-4 hize Suite/Bldg#: Project Name: (7 iL)24,. �S2e ,;a, 1 (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: Q/74,4:2 417 Existing Business Activity: U( -Cla30r �r; 717nfii.i— --1--i/iy___, Prop d Business Activity: // // // Verify site address/suite# exists and active in permit syste '"' er Terrace Neighborhood ❑ Yes LJ No u oning: 1 riPermitted Use: ltd Yes ❑ No ❑ Spec Space nfirm no land use required. Business License: Exists: LIQ Yes ❑ No,applicant notified to obtain business license Notes: Approved by Planning: _ 7/I Date: 4 9/ Revisions (after Building Submittal only) Reviewer Date Revision 1: El Approved El Not Approved Revision 2: 0 Approved 0 Not Approved Revision 3: 0 Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: . j % '� / / .— Site Plans: # 3 Building Plans: # Building Permit#: building permit#above. Workflow Routing: ming Ia..-PusFmit Coordinator ceding Workflow Sign-off: B—Sign-off for Planning(include notes from planning review) Route Application Documents: 1:g-1r 1'ding: original permit application, site plans,building plans, engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: Date: y�7�8 I:\Building\Forms\BldgPemiitRvw COM NoLandUse 060116.docx Engineering Review Slope at building pad: 30 2PFI Permit#: 49 2-Conditions "Met"prior to issuance of building permit ®"Easements (encroachments) per engineering conditions of approval and plat(not typical on SDR/CUP) 2-Vater Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes B No Assess Water Quantity Fee in-lieu: ❑ Yes ®'No LIDA Facility on lot: ❑ Yes 2--No ❑ NOT Approved by Engineering: Date Notes: Approved by Engineering: 6v- fYSi-ff-A, Date: j-/---(0 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: + SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes /A Tigard Trans SDC: ❑ Yes N/A Parks SDC: ❑ Yes N/A rOK to Issue Permit Approved byPermit Coordinator: / Date: b i ft t 1:\Building\Forms\B1dgPennitRvw_COM_W ithLandUse_070915.docx CleanWater Services April 19, 2018 s a { TO: City of Tigard Building Department • RE: Building Permit Site Work Application for BUP2018-00087 For Jobsite Address: 16320 SW 85th Avenue Tigard, OR 97224 For Durham Secondary Treatment Expansion project 6757. We are sending you: Two sets of Civil Drawings. Mike Idehara, Senior Engineer Clean Water Services 16060 SW 85th Avemue Tigard, OR 97224 16060 SW 85th Avenue,Tigard,Oregon 97224 p:503.547.8150 f:503.547.8151 cleanwaterservices.org