Loading...
PFI2018-00112 +� CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT COMMUNITY DEVELOPMENT Permit#: PF12018-00112 13125 SW Hall Blvd., Tigard OR 97223 503.718.2421 Date Issued: 05/15/2018 Parcel: SEG3716 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: PGE PFI Project Description: Install Circuitry for 2-47W leotek on 35' DB FG PL Gray W 8' connect to 240V Owner: FEES Description Date Amount PHONE: Contractor: PHONE: FAX: Applicant: JOSE GRAJEDA 10800 SW AVERY ST TUALATIN, OR 97223 PHONE: 503-617-5602 Total $0.00 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant SLE A-MU+710k), Signature: J Issued By: Y Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12018-00112 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition, American Traffic Safety Services Association [ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time, without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire& Rescue) and to 503-962-8140 (Tri-Met) and 503-431-2345 (Tigard School District) and other service providers impacted by such closure. PFI_Utilities 08 -TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 09-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 10-TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 11 -TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 12- UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 13-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work (pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work. Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 14-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI—Utilities 15- REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities (roads, ditches, etc.) as may be necessary, as determined by the Inspector, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 16- PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name> at<Insert Phone#>, to establish a preconstruction meeting. PFI_Utilities 17- NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24) hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI_Utilities 18- PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 19- MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 20- EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing, the names and 24 hour emergency telephone number of two (2) persons who have authority to resolve problems, take corrective action and, in general, will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 21 - OTHER Applied Notice RECEIVED MAY 10 2018 City of Tigard CITY OF TIGARD PUBLIC WORKS —ENGINEERING PLANNING/ENGINEERING Public Facility Tinprovel-nent (PFI) Permit TYPE OF WORK7 DESCRIPTION OF WORK(in the right-of-way) / �TYPE 1—Franchise Utility Work Check one: U Utilities ❑Sidewalk/driveway approach ❑Streetimprovements performed by NlVN, PGE Detailed description: INSTALL CIRCUITRY FOR 2-47W LEOTEK and/or utility agency. ON 35' DB FG PL GRAY W 8' MA-CONNECT@ 240V ❑ TYPE 2—Sidewalk/Driveway/Sewer f: Work performed for the purpose o PGE Job M2405643 • Sidewalk installation or repair. Property address/location(s): 11215 SW 70th Ave • Driveway approach installation i and/or repair Tigard, OR 97223 • Sanitary sewer lateral installation and/or main line tap Portland General Electric Submitted b Am Swean ❑ TYPE 3—Full scale Development Applicant: C Y Y Y� Work performed with Land use Address: 10800 SW Avery Street approval which includes any of p E City/state: Tualatin, OR Zip: 97062 the following: Phone: 503-612-2935 Email: prere coord@pgn.c m • Subdivisions or Partitions f Contact name: Jose Grajeda Phone: 503-672-5602 • Streetwidening I • Mainline installation for Sanitary i Contractor: Portland General Electric sewer, Storm sewer, Tigard water and/or Tigard Water Service Area i CCB#: 103663 Expiration: Address: SUBMIT COMPLETED APPLTCAMN TO: i City/state: "Lip: City of Tigard Pi.nming/Engineering Phone: Email: 13125 SW Hall Blvd. Contact name: Phone: 503-464-7777 Tigard,OR 97223 Applications for"minor work in right-of-way" En ineer: NIA only may be emailed to: 1 g _ro3y2ernnits@tigaa rd or.goy Address: s IOR STAFF USE ONLY City/state: Zip: Phone: Email: Case No.: � 1 ,_ O I LL , Contact name: Application submittal fee(.007%of j i Engineer's Estimate) $ Estimated value of work is required(if over$5,000):$ 6,355.00 Additional fees: ' (within the public right-of-way) Application accepted: ,r By: Date: Is work related to a LAND-USE DECISION? ❑ Yes N�No catio reviewed: `r>t If so,please specify (l�-�.P,SDR,SUB,etc.) case#: Appli By. Date: 4e Is work related to a BUILDING PERMIT. ❑ Yes rif No Applicant notified: If so,please specify(BUILDING PERMIT)case#: By: Date: L•\ENG\PermitApplications`pfi_application Rev.10/16/2017 �`��73'i yri.,�:,r-4y-xsF� ':YL°Ztiza'...�;i. _ - z.:ia�:�-scv.-A.a�:_•.�,.lP�n-s.. .,.t�.�.. _.�,. City ofTigard 13125 SW Hall Blvd. Tigard,Oregon 97223 wwwtigard-or.gov 503-715-2421 Page 1 of 4 APPLICANTS NOTE: Person specified as"applicant"shall be designated"Permittee"and shall provide financial assurance for,,vork,if required by the city pursuant to TMC 15.041.140. With the exception of a utility operating pursuant to a valid franchise widi the City of Tigard,when die owner and die applicant are different people,the applicant must be the purchaser of record or a lessee hi possession wide written authorization frons die owner or an agent of the owner. The owner(q)must sign this application in die space provided or submit a written audiorization wide this application. Franchised Utilities are not required to obtain die owner's signature on die application BY SIGNING BELOW,THE APPLICANTS) SHALL CERTIFY THAT: • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject ro ei . • If the application is granted,the applicant will exercise the rights granted ui accordance with the terms and subject to all the conditions and limitations of the approval. • All of the above statements and the statements in any plot plan,attaclunents,and exhibits transmitted herewith,are true;and the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such statements are false. • The applicant has r the entire contents of die application,including the policies and criteria,and understands die requirements for Sroving or denying die application. � v G A licant/Authotized Agent's signatui.e Print name Date SIGNATURES of each owner of the subject property, if required. Owner's signature Print name Date Owner's signature Print name Date Owner's signature Print name Date PUBLIC FACILITY IMPROVEMENT PERMIT City ofTigard • 13125 SSV Hall Blvd. • Tigard,Oregon 97223 • Ntnv%v tigard-or.gov 503-718-2421 • Page 2 of 4 2011 Edition Page 93 Oiling and Chip Seal Operations Diagram 345 FKAD WOORK T I NOTE: 0 I • Continue"LOOSE GRAVEL" Iand"DO NOT PASS" 500 I I signing throughout the NOT T I area at spacing shown. PASS jt '/2 mi. I i Loose sand or gravel area I I LOOSE WAVEL I I I mi. I ::::: I 1/2 mi. I I DODO NOT T I NOT PASS I PASS I I I LOOSE LOOSE °Q a I I I I '/2 mi. 1/2 I I I I PASS I :: :: PASS mi. '/2 mi. I I L008E GRAVEL I I I I I I I '/2 mi. Loose sand 1i1 or gravel area I 11 Do I y NOT PASS I 500' I I 11 September 2016 Chapter 5 Page 94 2011 Edition Self-Regulating Lane Closure Diagram 350 Use this detail for closures of one lane of a low-speed, two-lane, two-way road. 1. Use this diagram only if all of the following are true: a. Work space is less than 200 feet. b. The posted speed is 40 mph or less (unless not posted and speed governed by basic rule). c. Average Daily Traffic (ADT)is less than 400. d. Sight distance (in feet) is more than 750 at each end. 2. Use truck-mounted flashing warning lights on work and protection vehicles. See Section 4.3— Lights and Lighted Signs for exceptions. 3. For added visibility, a truck-mounted arrow panel or PCMS in caution mode may be used. 4. A"Lane Ends (Right)" (W4-2R) symbol sign, or"RIGHT LANE ENDS" (W9-1 R) sign, may be placed inside the cone taper for more emphasis. Sign Spacing and Buffer Lengths (feet) Posted Spacing Between Signs "Buffer" Speed A B C Space 20 50 25 100 100 100 75 30 100 35 350 350 350 125 40 150 45 180 50 500 500 500 210 55 250 60 285 65 700 700 700 325 70 365 Chapter 5 September 2016 7150 LIGHTING LEGEND 12023 t INSTALL 1-1/0 AL-TX ST LT CIRCUIT IN 1-2"SCH40 PVC CONDUIT,PROVIDED&INSTALLED BY CUSTOMER - _ ---- 34 ) INSTALL 1-#10 CU_TX ST LT CIRCUIT/N 1-1"SCH40 PVC 25'-Unknown Q I ®®®®� CONDUIT,PROVIDED&INSTALLED BY CUSTOMER Q I CUSTOMER INSTALLED 1324 STREETLIGHT JUNCTION BOX i , 1 }f INSTALL 67W LED LEOTEK GRAY ON 35'DB FIBERGLASS x_92 o GREY POLE(30'MTG H7)WITH 8'MAST ARM i i N CONNECT A T 240 V x U I 2 PGE TO PROVIDE BOTTOM PIECE POLE STUB J i Qm CUSTOMER TO INSTALL i 35'-Unb _ --'own :i 2012 e� i x 1-2"STUB FOR FUTURE ii W m 131 , Cl � ��• 11, 36-Unknown Q + None ( o ( CONSTRUCTION NOTES: SLCST U-) `-IC 1 1. CUSTOMER TO PROVIDE ALL TRENCHING AND BACKFILLING.JOINT USE TRENCH ! -- --' --- -----------__- M-' ! (® WITH GAS,TRENCH TO BE 48 INCHES DEEP AND 30 INCHES WIDE,MEASURED FROM VT-130 120' 12123 V FINAL GRADE. 2. ALL PGE CONDUCTORS TO BE INSTALLED IN GRAY,SCHEDULE 40,ELECTRICAL f tlJ GRADE,PVC CONDUIT WITH NYLON PULL STRINGS(MIN.500 LBS.TEST). ABC 300 30801 _ I ABC 2 AL ' PGE TO DETERMINE THE SIZE AND NUMBER OF CONDUITS REQUIRED. � i �� s®,�� t _ MAINTAIN 12 VERTICAL INCHES AND 24 HORIZONTAL INCHES CLEARANCE BETWEEN I x GAS AND OTHER UTILITIES.ALL ELBOWS 4 INCH&SMALLER TO BE 36 INCH RADIUS. ALL BENDS MUST BE FACTORY MADE.ALL ELBOWS LARGER THAN 4 INCH TO BE ~ J 60 INCH RADIUS.RIGID STEEL OR PGE APPROVED,FIBERGLASS BENDSARE REQUIRED Q i ' ! FOR RUNS OF 151 FEET OR LONGER,OR FOR ANY LENGTH RUN WITH MORE THAN + I1 180 DEGREES IN BENDS.PVC SCHEDULE 40 BENDS ARE ACCEPTABLE FOR RUNS OF O 225 150 FEET OR LESS.THE MAXIMUM TOTAL BENDS IN ANY CONDUIT RUN IS 270 DEGREES. lj ¢ 3. ALL CONCRETE FOOTINGS NEED TO BE INSTALLED WITH TOP OF BASE 1217 FLUSH TO CURB I SIDEWALK 4. CUSTOMER RESPONSIBLE FOR ROAD CROSSINGS.ALL CROSSINGS MUST ECTEND n C 25 6 FROM PROPERTY LINE TO PROPERTY LINE.CROSSINGS TO BE 48 INCHES DEEP, 35 AL MEASURED FROM FINAL GRADE. 1 1 I j 25'-Unknown 5. DIRECTIONAL BORING REQUIREMENTS BLACK HDPE(HIGH DENSITY POLYETHELINE)DUCT f I PD-1226 OR SCHEDULE 40 PVC WITH A MECHANICAL CONNECTION(CERTA-LOK OR LIKE MECHANICAL i 1 I CONNECTION PRODUCT)ASAN ALTERNITIVE TO HDPE DUCT,HDPE SHALL MEET THE 7105 1 1' REQUIREMENTS OF PGE SPECIFICATION LC20515(AVAILABLE ON REQUEST FROM PGE PROJECT 1 7085 I I l I jl 1 EXTRUDED RED STRIPES(WHICH IS A SPECIFICATION REQUIREMENT).MANDREL TEST OF HDPE PIPE IS REQUIRED AFTER INSTALLATION WITH PGE INSPECTOR PRESENT. i 6. TRANSFORMER PADS ARE TO BE SET SO THAT THE TOP IS 2 INCHES ABOVE x FINAL GRADE.CONDUIT IS TO BE INSTALLED IN PAD AS INDICATED IN DETAIL 1 1 + AND TO EXTEND 1 INCH ABOVE THE PAD. 1 1 ; J _ _ --� 132 t I Q— j 7. ALL PGE TRANSFORMERS TO BE INSTALLED 8 FEET(MIN)FROM ANY COMBUSTIBLE 35-Unknown 1 I I 12190 I BUILDING,WALL OR OVERHANGAND 4 FEET(MIN)FROMANY FIRE HYDRANT. i t'r I I Nt PGE TRANSFORMERS MUST BE WITHIN 15 FEET OF ADRIVEABLEAREA. ( 'None i l 'U VT-57 ( ALWAYS MAINTAIN 10 FEET CLEARANCE IN FRONT OF ALL TRANSFORMERS. t I i I t I ! ) I 8, STEEL BARRIER POSTS ARE REQUIREDAROUND TRANSFORMERS THATARE EXPOSED + f� 1134 iO VEHICLES — -- 5'=Unknow R .AS NEEDED-FRONT LOT PUBLIC UTILITY EASEMENT(P.U.E.)TO BE 8 FEET(MIN), 454V_ 11_j 10 FEET(PREFERRED). Non 1 /' \ 10.CONSULT WITH PGE REPRESENTATIVE 2 WEEKS BEFORE STARTING MAIN POWER f \_ 4 '-4 -20' '. ----._.....--150' •1 _.__,,._.___.�--_---�----- ----- -----.---..._`_y.----� +' I E.INCLUDED IN THIS CONFERENCE T P STRUCTION CON I TRENCHING FOR RECON CONFERENCE. WILL BE EXCAVATOR,PGE,TELCO,CATV,AND GAS. 19 I VT-133 — — I - --- 11.CUSTOMER TRENCH AND ELBOW CONFIGURATIONS,ALL CONDUIT,VAULT AND PAD INSTALLATIONS MUST BE INSPECTED BY PGE PRIOR TO BACKFILLING.WHEN YOU ARE BOX INSTALLATIONS �f(� /�I /� c READY FOR PGE TO INSPECT(AFTER INSTALLATION IS COMPLETE)CALL 503-3235700 JUNCTION OeB O/� I R.d TALLAA�TeI�O/Nd INSTALL 30AMP FUSES IN SECONDARY PEDESTALS OR 503-463A348(SALEM AREA).ALLOW UP TO 2 WORKING DAYS FOR INSPECTION TO OCCUR, FOR 1 V T9 3EET LIGHT ONLY L 6 OR SECONDARY VAULTS(WHICHEVER IS ST LT POINT STREET LIGHTING IGHTING N®TICE 12. REFER TO THE PGE ELECTRIC SERVICE REQUIREMENTS BOOKLET FOR SPECIFIC REQUIREMENTS. CONTACT PGE FOR APPROVED MANUFACTURERS ) THIS STREETLIGHT DESIGN BY OTHERS OF ATTACHMENT FOR EACH STREET LIGHT PER T&D DESIGN IS BASED ON STANDARD UNDERGROUND EQUIPTMENT.NONSTANDARD UNDER- FINAL GRADE IF HARD SURFACE(FLUSH) CONSTRUCTION STANDARD LC-11550 PGE DOES NOT ACCEPT DESIGN RESPONSIBILITY GROUND EQUIPTMENT MAY BE AN OPTION ATAN ADDITIONAL COST TO THE CUSTOMER. ___----_--- GRADE IF SOFT SURFACE 2 PIECE FIBERGLASS(COMPOSITE)POLE PGE CONSTRUCTION DRAWING —' — — 1FINAL VIATION FROM THIS DESIGN MUST Pull String Top Section Slips 8'GROUNDROD Taped to _ Over Stub AS-BUILT VERIFICATION&NESC VIOLATIONS CORRECTED 1 PROVIDED BY PGE I Side olCandu I BE APPROVED BY THE PGE PROJECT MANAGER This document accurately represents FIELD Construction INSTALLED BY 7"X30k18 DEEP OR I I 3" CUSTOMER 17 k30'k18"DEEP Pole Stub Section I I Foreman. Date: PGE APPROVED JUNCTION I 4'Above 2" 80X,DETERMINED BY PGE Finish General Foreman: Date: See Note 2 H I 0 Vl 36"RADIUS 90 BEND* For Installing (Signature only required for field construction changes.) Sheet Metal s"MIN Screws -Leave Empty SAFETY SDPWENG REVIEW ASBUILT BY DESIGNER. 1' 1'Bebw Finish Grade 314"MINUS BACKFILL I -Leave Extra AROUND AND UNDER 1"PVC SCH 40 ELECTRICAL GRADE %�` Racktor8ackhu DATE: SCALE: ACCOUNT AW J B NO. SPLICE Box ✓ TO OPTIONAL ST LT POLE 1 2/2/2018 1 in : 57 ft 1070001 1000004600 M2405643 h; TITLE TRIANGEL PARTNERS I TIGARD/RED ROCK BUSINESS CENTER See Note 1 SCH 40 GREY PVC W/FACTORY BENDS 314'-Minus y j CIRCUIT SIZE 2"OR 3"PVC 40 (STEEL OR PGEAPPROVED FIBERGLASS Crushed Rock 4 "' CALL 811 BEFORE YOU DICT - 36'RadrusElbows ATTENTION: WEST PORTLAND-WEST PORTLAND 13 11 x 17 FOR RUNS ELECTRICAL GRADE OR MOREIOBENDS)VER 150',OR 180 DEGREES jY De pend ng oninsfellatan OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED ° LOCATION (DETERMINED BY PGE) BY THE OREGON UTILITY NOTIFICATION CENTER. 11215 SW 70TH AVE,TIGARD, 97223 DESCRIPTION I"CONDUIT TO TOP VIEW `., STREET SIDE BOTTOM PIECE POLE INSTALLATION THOSE RULES ARE SET FORTH 1N OAR 952-D01-0010 THROUGH 952-Dol-0090 You MAY osrarN COPIES of - INSTALL CIRCUIT 2-47W LEOTEK ON 35' DB FG PL W 8'MA SHEET STREET LIGHT POLE t,. Notes: THE RULES BY CALLING THE OREGON UTILITY COUNTY SECTIONS WORK WITH ®CUSTOMER TOINSTALL 1. Tamquiredaped roundch nusnusandock backfill NOTIFICATION CENTER ADMINISTRATION @(502-232-1987) GROUND ROD AND CONDUIT is required around oalln poles andintinfootings WASHINGTON C 2101 A 1 OF 1 2"OR 3" screws regardless of sod condition ro maintain y.. ��,{,��y, Map CONDUIT ON THE SOURCE SIDE proper pole alignment IKuOw .whaft bele f BEAVERTON 2"DR 3' TO REQUEST UTILITY LOCATES CALL THE OREGON • DESIGN BY PHONE(503)DRAWN BY CONDUIT 2 (PGE P/N 02 22)180'apart through pole top LINE CREW CENTER and stub to prevent rotation otpole top. UTILITY NOTIFICATION CENTER, 811 AT LEAST ���befol+e you dlJ, JOSE GRAJEDA 672-5602 SUJATHA NARAYANAN DR GROUND 2 BUSINESS DAYS PRIOR TO EXCAVATION 2213 T 1, RD 70 BEAVERTON,OR 97006 ©PORTLAND GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED 7160 ► LIGHTING LEGEND 1 12023 I' INSTALL 1-1/0 AL-TX ST LT CIRCUIT IN 1-2"SCH40 PVC I I X CONDUIT,PROVIDED&INSTALLED BY CUSTOMER I I � i 34 INSTALL 1410 CU TX ST LT CIRCUIT IN 1-1"SCH40 PVC a ' 25'-Unknown I CONDUIT,PROVIDED&INSTALLED BY CUSTOMER r i jt ' t CUSTOMER INSTALLED 1324 STREETLIGHT JUNCTION BOX ll J INSTALL 67W LED LEOTEK GRAY ON 35'DB FIBERGLASS VT-92 o GREY POLE(30'MTG HT)WITH 8'MAST ARM i iCONNECT AT 240 V A Ij x PGE TO PROVIDE BOTTOM PIECE POLE STUB I I U 2 m CUSTOMER TO INSTALL f'35'-Unbown ii ¢ Q I , 2012 j a�Ll1 0— 1-2"STUB FOR FUTURE X _7 rn1131 !I Qr 35'-Unknown j ¢ i ' None o {i CONSTRUCTION NOTES: SLCST I ^'i 1. CUSTOMER TO PROVIDE ALL TRENCHING AND BACKFILLING.JOINT USE TRENCH --, VI WITH GAS,TRENCH TO BE 48 INCHES DEEP AND 30 INCHES WIDE,MEASURED FROM VT-130 120' I 12123 I FINAL GRADE. 2. ALL PGE CONDUCTORS TO BE INSTALLED IN GRAY,SCHEDULE 40,ELECTRICAL �J GRADE,PVC CONDUIT WITH NYLON PULL STRINGS(MIN.500 LBS.TEST). ABC 300 30801 V I PGE TO DETERMINE THE SIZE AND NUMBER OF CONDUITS REQUIRED, + f ��®1 A ABC 2 AL __ __ MAINTAIN 12 VERTICAL INCHES AND 24 HORIZONTAL INCHES CLEARANCE BETWEEN `V ? GAS AND OTHER UTILITIES.ALL ELBOWS 4 INCH&SMALLER TO BE 36 INCH RADIUS. iX I ALL BENDS MUST BE FACTORY MADE.ALL ELBOWS LARGER THAN 4 INCH TO BE J ' ? 60 INCH RADIUS-RIGID STEEL OR PGE APPROVED.FIBERGLASS BENDS ARE REQUIRED i FOR RUNS OF 151 FEET OR LONGER,OR FOR ANY LENGTH RUN WITH MORE THAN 3 Q 225 180 DEGREES IN BENDS.PVC SCHEDULE 40 BENDSARE ACCEPTABLE FOR RUNS OF 150 FEET OR LESS.THE MAXIMUM TOTAL BENDS IN ANY CONDUIT RUN IS 270 DEGREES. Q i I f - - 3 F L H T TE FOOTINGS NEED TO BE INSTALLED WITH TOP OF BASE 1217 FLUSH O CURB f SIDEWALK i fIiI ( 4- CUSTOMER RESPONSIBLE FOR ROAD CROSSINGS.ALL CROSSINGS MUST ECTEND iCZ (� I FROM PROPERTY LINE TO PROPERTY LINE.CROSSINGS TO BE 48 INCHES DEEP, J i 35 N v v MEASURED FROM FINAL GRADE. � I rI11 25'-Unknown + tAL 5. DIRECTIONAL BORING REQUIREMENTS:BLACK HDPE(HIGH DENSITY POLYETHELINE)DUCT 1 ! I PD-1226 ------� I OR SCHEDULE 40 PVC WITH A MECHANICAL CONNECTION(CERTA-LOK OR LIKE MECHANICAL II' I I ; I 1 CONNECTION PRODUCT)ASAN ALTERNITIVE TO HDPE DUCT.HDPE SHALL MEET THE 7105 7085 I I I ( 1 ! TEST OF REQUIREMENTS OF PGE SPECIFICATION LC20515(AVAILABLE ON REQUEST FROM PGE PROJECT tt f EXTRUDED RED STRIPES(WHICH IS A SPECIFICATION REQUIREMENT).MANDREL HDPE PIPE IS REQUIRED AFTER INSTALLATION WITH PGE INSPECTOR PRESENT. 6. TRANSFORMER PADS ARE TO BE SET SO THAT THE TOP IS 2 INCHES ABOVE FINAL- GRADE.CONDUIT IS TO 8E INSTALLED IN PAD AS INDICATED IN DETAIL AND TO EXTEND 1 INCH ABOVE THE PAD. 132 I J 1 + _ 1 7. ALL PGE TRANSFORMERS TO BE INSTALLED 8 FEET(MIN)FROM ANY COMBUSTIBLE 36-Unknowni ! d I BUILDING,WALL OR OVERHANGAND 4 FEET(MIN)FROM ANY FIRE HYDRANT. 12190 I PGE TRANSFORMERS MUST BE WITHIN 15 FEET OF A DRIVEABLEAREA. VT-57 'None ALWAYS MAINTAIN 10 FEET CLEARANCE IN FRONT OFALL TRANSFORMERS. 8. STEEL BARRIER POSTS ARE REQUIREDAROUND TRANSFORMERS THAT ARE EXPOSED 134 I I I I ! I � ! TO VEHICLES I 1 1{ ) I ( 9. AS NEEDED-FRONT LOT PUBLIC UTILITY EASEMENT(P.U.E.)TO BE 8 FEET(MIN), 5'=l-fnl�now 1 ( I 10 FEET(PREFERRED). 454 )NOn I / \ 10 CONSULT WITH PGE REPRESENTATIVE 2 WEEKS BEFORE STARTING MAIN POWER h , ' -- TRENCHING FOR A PRECONSTRUCTION CONFERENCE.INCLUDED IN THIS CONFERENCE I 4 '-4 20' - 150' - ------. __ _ �..-.•_�__------�_.--_--- ---_._�_._� (y I WILL BE EXCAVATOR,PGE,TELCO,CATV,AND GAS. -- I 19 i VT-133 -"^ r-""" 11 CUSTOMER TRENCH AND ELBOW CONFIGURATIONS,ALL CONDUIT,VAULT AND PAD INSTALLATIONS MUST BE INSPECTED BY PGE PRIOR TO BACKFILLING-WHEN YOUARE BOX c /� READY FOR PGE TO INSPECT(AFTER INSTALLATION IS COMPLETE)CALL 503-323-6700 BOi• INST/9 JUNCTION LLATIONHa INSTALL 30AMP FUSES IN SECONDARY PEDESTALS ( NOTICE(� OR 503-463-0348(SALEM AREA).ALLOW UP TO 2 WORKING DAYS FOR INSPECTION TO OCCUR, FOR STREET LIGHT ONLY OR SECONDARY VAULTS(WHICHEVER IS ST LT POINT STREET LIGHTING 0 ICE 12.REFER TO THE PGE ELECTRIC SERVICE REQUIREMENTS BOOKLET FOR SPECIFIC REQUIREMENTS. CONTACT PCE FOR APPROVED MANUFACTURERS ) THIS STREETLIGHT DESIGN BY OTHERS OF ATTACHMENT FOR EACH STREET LIGHT PER T&D DESIGN IS BASED ON STANDARD UNDERGROUND EQUIPTMENT.NON-STANDARD UNDER- FINAL GRADE IF HARD SURFACE(FLUSH) CONSTRUCTION STANDARD LC-11550 PGE DOES NOTACCEPT DESIGN RESPONSIBILITY GROUND EQUIPTMENT MAY BE AN OPTION ATANADDITIONAL COST TO THE CUSTOMER. FINAL GRADE IF SOFT SURFACE 2 PIECE FIBERGLASS(COMPOSITE)POLE ----------- — — — — -------------- ANY D,EVL4TION FROM THIS DESIGN'MUST PGE CONSTRUCTION DRAWING — Puy String ( (�_ Top Section Slips If a'GROUND ROD Taped to Over Stub AS-BUILT VERIFICATION&NESC VIOLATIONS CORRECTED 1 PROVIDED BY PGE I side of Conduit I BE APPROVED BY THE PGE PROJECT MANAGER INSTALLED BY This document accurately represents FIELD Construction 13'k24'k 18 DEEP OR I I 3- 17'k30'k 18"DEEP Pole Stub Section CUSTOMER PGE APPROVED JUNCTION I 4'Above Foreman: Date: 2" BOX,DETERMINED BYPGE Finish Grade 36"RADIUS 90 BEND For Note 2 �� p General Foreman: Date.- See Note 2 � NI'`� Sheaf Metal 1 —(Signature only required for field construction changes.) 6"MIN Screws I —Leave Empty wFini SAFETY SDPM/ENG REVIEW ASBUILT BY DESIGNER: 314"MINUS BACKFILL I 1' 1'Below Finish Grade AROUND AND UNDER —Leave Extra 1"PVC SCH 40 ELECTRICAL GRADE ;' Rackrorsackfilr ��®U �� DATE: SCALE: ACCOUNT.' AWO: J B NO. SPLICE BOX TO OPTIONAL ST LT POLE ` 2/2/2018 1 in 57 ft 1070001 1000004600 I M2405643 TITLE See Nate 1 TRIANGEL PARTNERS 1 TIGARD I RED ROCK BUSINESS CENTER *SCH40 GREY PVC W/FACTORY BENDS 3r4'-Minus r d CIRCUIT SIZE 2"OR3"PVC 40 (STEEL OR PGE APPROVED FIBERGLASS Crushed Rock ��- r, 36' �� Radius ALC 811 BEFORE YOU DIG FOR RUNS OVER150',OR 180 DEGREES -7 r�; Dependingoninstallallon ATTENTION: WEST PORTLAND-WEST PORTLAND 13 11 x 17 ELECTRICAL GRADE �. (DETERMINED BY PGE) OR MORE IN BENDS) OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED � LOCATION BY THE OREGON UTILITY NOTIFICATION CENTER. 11215 SW 70TH AVE,TIGARD, 97223 TOP VIEW �. -– THOSE RULES ARE SET FORTH 1N OAR 952-001-0010 /e.' ® DESCRIPTION 1"CONDUIT TO STREET SIDE BOTTOM PIECE POLE INSTALLATION THROUGH 952-001-0090 YOU MAY OBTAIN COPIES OF - - STREETLIGHTPOLE � ;,.:� -° INSTALL CIRCUIT 2-47W LEOTEK ON 35' DB FG PL W 8' MA SHEET Nates: THE RULES BY CALLING THE OREGON UTILITY COUNTY SECTIONS WORK WITH ®CUSTOMER TO INSTALL 1. Tamped ed ar u minus crushed rock backfill GROUND ROD AND CONDUIT arequired-inch nus crushed shed roofings NOTIFICATION CENTER ADMINISTRATION @ (502-232-1987) WASHINGTON C2101A 1 OF 1 2"OR 3" regardless of sod condition to maintain y� /��� CONDUIT ON THE SOURCE SIDE proper pole alignment Kaoow .man below. BEAVERTON �'OR 3" TO REQUEST UTILITY LOCATES CALL THE OREGON DESIGN BY PHONE(503)DRAWNBY 2. Install 2-#}Ox3/4"sheef metal screws coNDutr (PGE PIN 0 2522)and stub to prevent8rotatonofpoLtop.letup UTILITY NOTIFICATION CENTER, 811 AT LEAST %M11 bdore you dig.ON% uNECREWCENTR JOSE GRAJEDA 672-5602 SUJATHA NARAYANAN GROUND RO 2 BUSINESS DAYS PRIOR TO EXCAVATION 2213 T 1, RD 70 BEAVERONOR 97006 ©PORTLAND GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED