PFI2018-00107 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT
COMMUNITY DEVELOPMENT Permit#: PF12018-00107
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 05/14/2018
Parcel: SEG301
Jurisdiction: Tigard
Site address:
Subdivision: Lot:
Project: PGE Job M2294965
Project Description: SEG301, Associated with 8900 SW Oak St. Provide 3P 120/208, 2 2000A& 1 800A Underground SVC
to 2 new apartment buildings. Associated with BUP2017-00178 and BUP2017-00179.
Owner: FEES
Description Date Amount
PHONE:
Contractor:
PHONE:
FAX:
Applicant:
JAMES CHRISMAN
10800 SW AVERY ST.
TUALATIN, OR 97008
PHONE: 503-736-5749
Total $0.00
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
Permittee/Applicant
Signature: ( r L
Issued By:
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PF12018-00107
Type: Condition Name: Status: Severity:
PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice
Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The
applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and
area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire& Rescue)and to 503-962-8140(Tri-Met)
and 503-431-2345(Tigard School District)and other service providers impacted by such closure.
PFI_Utilities 08-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice
Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City
approval of any access closures.
PFI_Utilities 09-TRAFFIC CONTROL WORK HOURS Applied Notice
Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City.
PFI_Utilities 10-TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice
Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the
City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized
by the City Engineer.
PFI_Utilities 11 -TRAFFIC CONTROL MODIFICATION Applied Notice
The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to
assure public safety.
PFI_Utilities 12- UTILITY NOTIFICATION Applied Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987.
If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit
holder's expense.
PFI_Utilities 13-UTILITY LOCATION CONFLICT Applied Notice
Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole
before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at
the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work
with affected utility agencies.
PFI_Utilities 14-TEMPORARY PATCH Applied Notice
A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance
approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is
liable for hazards or damage resulting from the prosecution of the work.
PFI_Utilities 15-REPAIR OF EXISTING FACILITIES Applied Notice
Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by
the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit.
Corrective work shall be done at the applicant's expense.
PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice
Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work
area. Traffic control devices, flag persons. etc., shall be in place prior to initiation of construction work and shall be
effectively maintained.
PFI_Utilities 16-PRECONSTRUCTION MEETING Applied Notice
Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name> at<Insert
Phone#>, to establish a preconstruction meeting.
PFI_Utilities 17-NOTICE TO COMMENCE WORK Applied Notice
The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged
inspection, and after completing work covered by the permit.
Contact Ken Fisher at 503-816-6146 or Kenny@tigard-or.gov
PFI_Utilities 18-PERMIT/PLAN ON SITE Applied Notice
A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and
provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work
performance.
PFI_Utilities 19-MONUMENT PROTECTION Applied Notice
Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's
expense.
PFI Utilities 20-EMERGENCY CONTACTS Applied Notice
Provide to the City inspector, in writing, the names and 24 hour emergency telephone number of two(2)persons who have
authority to resolve problems, take corrective action and, in general, will be responsible in case of any emergency. The
applicant shall notify the City Inspector, in writing. of any/all assignment changes.
PFI Utilities 21 -OTHER Applied Notice
PFI Utilities 01 -WORK SITE REQUIREMENTS Applied Notice
Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of
any agreement with the City of Tigard regarding work to be done pursuant to this permit.
PFI Utilities 02-WORK SITE AREA Applied Notice
The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited
and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up
and suspension of work to accomplish clean-up.
PFI Utilities 03-WORK SITE EROSION CONTROL Applied Notice
Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI Utilities 04-WORK SITE REPAIRS Applied Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be
reinstalled or replaced,with like kind of material. Obtain City approval of restoration work.
PFI Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice
Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices
[MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition, American Traffic Safety Services
Association [ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH].
RECEIVED
City of Tigard MAY 0 8 2018
PUBLIC WORKS —ENGINEERING CITY OF TIGARD
GINEERING
Public FacestY Improvement PFI PeANrNmit
TYPE OF WORK
DESCRIPTION OF WORK(in the right-of-way)
TYPE 1-Franchise Utility Work
Check one: g Utilities ❑ Sidewalk/driveway approach ❑ Street improvements performed by NWN, PGE
Detailed description: PROVIDE 3P 120/208, 2 2000A& 1 800A and/or utility agency.
UNDERGROUND SVC TO 2 NEW APT BLDGS ❑ TYPE 2-Sidewalk/Driveway/Sewer
PGE Job M2294965 Work performed for the purpose of:
• Sidewalk installation or repair.
• Driveway approach installation
8900 SW Oak Street
Property address/location(s): and/or repair
Iv-, 10 1 Tigard, OR 97223 • Sanitary sewer lateral installation
and/or main line tap
Portland General Electric Submitted b Am Swean ❑ TYPE 3-Full scale Development
Applicant: � y y y� Work performed with Land use
Address: 10800 SW Avery Street approval which includes any of
City/state: Tualatin, OR Zip: 97008 the following:
Phone: 503-612-2935 Email: preregcoord@pgn.com • Subdivisions or Partitions
Contact name: James Chrisman Phone: 503-736-5749 • Street widening
• Mainline installation for Sanitary
Lauzon Contracting, LLC sewer, Storm sewer, Tigard water
Contractor: g' and/or Tigard Water Service area
CCB#: 153312 Expiration: 10/19
Address: 13577 SE Willingham Ct SUBMIT COMPLETED APPLICATION TO:
City/state: Clackamas, OR Zip: 97015 City of Tigard
Phone: 503-482-5445 Email: Tiaolsen@lauzoncontracting.com Plannig/Engineering
13125 SW Hall Blvd.
Contact name: Joe Gadotti Phone. 503-869-0400 Tigard,OR 97223
Applications for"minor work in right-of-way"
only may be emailed to:
Engineer: System Design Consultants, Inc. rowpermits_tiga�gov
Address:
City/state: Zip: WOMEMMMMi
Phone: 503-248-0227 Email: Steve@sdcpdx.com Case No.: PP12-01?--00107
Contact name: Steve Watkins Application submittal fee(.007%of
Engineers Estimate) $ tel'
Estimated value of work is required(if over$5,000):$ Additional fees: $
(within the public right-of-way) Application accepted: Q
Is work related to a LAND-USE DECISION? ❑ Yes Gd'No By: t- Date:
If so,please specify (MLP,SDR, SUB, etc.) case #: Application reviewed:
By: Date:
Is work related to a BUILDING PERMIT? D Yes ❑ No Applicant notified:
If so,please specify(BUILDING PERMIT)case#: 2017-00-178,2017-00-179 By: _A� / Date:
I:\ENG\PertnitApplications\pfi—application Rev.10/16/2017
OMt S T i•5 �- �-o t L�le. — LA3 pjA L (�t' ►t. .( a 31
X2 C�– �•S t-!�4 t PF.Z /`-i--Dd4 S~B
City ofTi and • 13125 SW Hall Blvd. Tigard,Oregon 9722www.tigard-or.gov 503-718-2421 Page 1 of4
APPLICANTS
NOTE: Person specified as "Applicant" shall be designated"Permittee"and shall provide financial assurance for work,if
required by the city pursuant to TMC 15.041.140.
* With the exception of a utility operating pursuant to a valid franchise with the City of Tigard,when the owner and the applicant are different
people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the
owner. The owner(s)must sign this application in the space provided or submit a written authorization with this application. Franchised
Utilities are not required to obtain the owners signature on the application
BY SIGNING BELOW,THE APPLICANTS) SHALL CERTIFY THAT:
• The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject
ro e
• If the application is granted,the applicant will exercise the rights granted in accordance with the terms and subject to all the
conditions and limitations of the approval.
• All of the above statements and the statements in any plot plan,attachments,and exhibits transmitted herewith,are true;and
the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such
statements are false.
• The applicant has read the entire contents of the application,including the policies and criteria,and understands the
requirements for approving or denying the application.
(�7YrcaZ406 Steve Hursh 5/7/2018
Applicant/Authorized Agent's signature Print name Date
SIGNATURES of each owner of the subject property, if required.
Owner's signature Print name Date
Owner's signature Print name Date
Owner's signature Print name Date
PUBLIC FACILITY IMPROVEMENT PERMIT
City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov 503-718-2421 • Page 2 of4
DEVELOPMENT ENGINEERING FEESFOR STAFF USE ONLY
Public Facility Improvement(PFI)Permit:
DETAILED
APPLICATION FEE REQUIREMENTS
Part 1: Required submittal fee$300.00 (minimum) FRANCHISE UTILITY AND SIDEWALK/
DRIVEWAY AND UTILITY
PERMIT FEE CONNECTIONS,ETC.
Part 2: All non-water system improvements (work in the right of way)
Engineer's estimate X 5%(less$300.00 minimum
submittal fee) Sketch
Engineer's estimate X 2%Plan Review (including information below)
❑ Dimensions
WATER SYSTEM FEE ❑ Street Name
Part 3: All public water system improvements ❑ Site Address
Engineer's estimate X 12%
FULL SCALE DEVELOPMENT
PFI Permit Fee Exemptions: (Subdivisions/Partitions and Street Improvements)
There will be no permit fee charged,or assurance required
for the following types of work: Design Flans
• Sidewalk repair(less than 20 lineal feet) (6 sets,24x36 or 22x34)
• Relocate or replace mailbox ❑ Cover—Site,Vicinity,Abbreviation,Legend
• Ditch cleaning that does not involve regrading. ❑ General Notes(City,Water,Sewer,etc.)
• Weep hole repair ❑ Street(Plan,Profile)
• Curb repair or replacement(less than 20 lineal feet) ❑ Water,Storm and Sanitary(Plan Profile)
• Lawn sprinkler system installation or repair ❑ Water(duality Facilities
• Street tree pruning or planting ❑ Grading
• Planter strip landscape maintenance ❑ Landscaping/Tree Plan
• Test wells ❑ Composite Utility Plan(Electrical,Phone,Gas,
Storm,Sanitary,Water,Signage,Street Lights,etc)
❑ Details
Note: A cash/bond assurance maybe ❑ Traffic Sight Distance
required per TMC 15.04.140. ❑ Signing and Striping
(customer deposit) ❑ Street Light Plan and Photometric
❑ Engineers seal/signature
❑ Sheet label(project land use name,revision and
plan log block,dates and sheet numbers.)
Additional Submittals
(per Land Use conditions)
❑ Traffic Report
❑ Storm water Drainage Calculations
❑ Geotechnical Report
❑ Preliminary Access Report(Sight Distance)
❑ Proposed Plat
❑ Pathway Design(if applicable)
❑ Water Department Approval
❑ Engineers Construction Estimate
t.t_5.-::^.-"`.�.•�,.ti:Y_�#:G� +ar' -:.„,4':. s..a.•;:.• kw'..�,+%F\ s.e..•-.z•w;..,.d......". :�xi'&kwr..e_.o:--M'A..nia�iM1`iuKr,Si:. :..7'GL79N au Y.vi�'t'6'bi+W�s35a[`i:Pi`e.R'4i@e%+!R"::%.°A5E5ivoe i.A4+ -- _""' bB..i1',(J'8�'3+tlY�kissst'u`;.'�C..xw.n....
PUBLIC FACILITY IMPROVEMENT PERMIT
City ofTigard 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 3 of4
SAMPLE SKETCH:
Edge of Pavement
I Ditch
Streetlight .—.—.—.—.—.—.—•—r—.—
I � � .. Rain Drain
I I ■ `
' T—erop'os' d''SowerTine"
^'N I Existing House
Existing �
i i Driveway
al01
I V�
C 1 � -h•
a
L IrkI I rl
39
a 1
ILI
a
Q
E
O�
Existing Shop 1
I
Powerpole I = a I
95
'
--------7roperty7ni Q-----------
0
� I .
Fire Hydrant(FH)
I
I I
Scale: 1"=30'
I � �
' I �
I
I � �
MINIMUM SKETCH REQUIREMENTS (Put"N/A"if Not Applicable):
North arrow Property lines &dimension Slope of property
Street &street name(s) Existing building, structures Utility&street light poles
Proposed work Existing curb or edge Trees
Existing S/W or of pavement Existing utility locations
D/W apron (sewer,water,storm)
PUBLIC FACILITY IMPROVEMENT PERMIT
City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 0 Page 4 of4
COMMERCIAL LEGEND
NEW PGE FACILITIES TO BE INSTALLED
(UNLESS OTHERWISE SPECIFIED)
FACILITIES IN GREEN ARE TO BE REMOVEC
Q 577-PGE VAULT,WITH 57-T-2-332P-PGE TOP
PROVIDED d INSTALLED BY CUSTOMER
PGE TO INSTALL 3J WAY LATERAL TAPS
5106-PGE PADMOUNT VAULT,
PROVIDED d INSTALLED BY CUSTOMER
■ 6'x6'TRANSFORMER PAD
PROVIDED d INSTALLED BY CUSTOMER
577-PGE SNITCH VAULT 0 FAULT INDICATOR
Hoes
_- F1 INSTALL CUTOUT
R*AT
r�a V SIIE FUSING AS NOTED
=
It MAT,APmoseRr rcE
uo rO INSTALL 3-MAL-EPR 1KT PRIMARY IN 1J"PVC CONDUIT
H u --------
ArGAAMosm 4r M4 PROVIDED d INSTALLED BY CUSTOMER
1J'TO • 3W T.oT v _------�.INSTALL 3-4'2 Ai.EPR ACT PRIMARY IN 1J"PVC CONDUIT
PL 393 yN,eEH PROVIDED d INSTALLED BY CUSTOMER
L u 1 RasTAu Saou e
B 100 32145 ---------INSTALL 1-2 AL-FPR 1KT PRIMARY IN 1-2•'PVC CONDUIT
PJv F-4•TO • rl�rpi0 w F.d rvc PD-113 PROVIDED d INSTALLED BY CUSTOMER
30-Unknown VT-99 VT 244 - INSTALL V-350 AL-OX SECONDARY IN 7 OF 11-3"PVC CONDL'
_L,�� 2008 -14$ -------- 1-4PROVIDED d INSTALLED BY CUSTOMER
INSTALL 350 AL-OX SECONDARY IN 1 OF 3-3"PVC COND,,
{ PROVIDED d INSTALLED BY CUSTOMER
S VT-98 Caution 2 "
DUfT FOR FRE,
"PVC 50 64778 Feeders Fo`� `x 14^TO SW ELENA LN W OV1DEDCd FINSTALLEED BY CUSTOMER
396 aPUC Prr v
45'-2
2004 10PPh 39 3-142
T110 �O T� yr ubs
393 - Q
pel 111& 24"
35'-Unkw14240T ^ +—B oft PD-112&Y'2 Typi-
I
30' B2AL B 2 AL
ABC 336 ACSR �r `y 5169 142 65 T B(UQ 324 LEGEND
B 50 60395 C 25 15369 130'• PGE Primary
JU 2006 36•• Min O Serondary Cab,
SW OAK ST C A 61328393 TIE Min CweT Imlde Deer
_- 600 A Trench 0 Te,o,CATV
...__ _._...._.—... 1
2220
-1.. ®Backfill
1-
1 O 5eleer BaekBu
1
1 li"Mie U.di.reebed
1 F7 ERr1h
1
1
E
joint 11.e Tren<n wo c.E
INSTALL:
1
INSTALL: �315'
Tranformer-Three
3PIS2.5f7.2281120 Phase Underground 1 CONSTRUCTION NOTES: RSMTU
3P 12.5/7.2 208/120 PM 500KVA NTLB 1
1
1 1.CUSTOMER TO PROVIDE ALL TRENCHING AND SACIffIILING,JOINT USE TRENCH
1 ♦ WITH GAS,TRENCH TO BE 48 INCHES DEEP AND 30 INCHES WIDE.MEASURED FROM
i FINAL GRADE.
2.A PGE STANDBY CREW(S REQUIRED FOR OPENING ALL ENERGIZED PGE VAULTS
1 140' JUNCTION BOXES,AND EOUPMENT'FACILRIES,INCLUDING CONNECTION OR INhALLATION
C1 1-35A OF CONDUITS AN
PULL STRINGS.CALL SERVICE COORD1NATK)N AT 503.323.6700
ABC 500 1 TO SCHEDULE A PGE STANDBY CREW,
1 ABC 500 3.ALL PGE CONDUCTORS TO BE INSTALLED IN GRAY,SCHEDULE 40,ELECTRICAL
80'-� 1 GRADE PVC CONDUIT wfTH NYLON PULL STRINGS((MRL.500 LBS TEST,
PD I2 E PGE TO DETERMINE THE SIZE AND NUMBER OF CONCURS REQUIRED.
1 1 �'PD 6+ MAINTAIN 12 VERTICAL INCHES AND 24 HORIZONTAL INCHES CLEARANCE BETWEEN
GAS ATA OTHER UTILRIES.AL ELBOWS INC.48 SMALLER TO BE J81NCH RADIUS.
70. ALL BENDS MUST BE FACTORY MADE.21 ALL ELBOWS LARGER THAN 4 MCH TO BE
1 1 I 60 MCN RADIUS.RIGID STEEL OR POE APPROVED.FRGEIRGLASS BENDS ARE REQUIRED
1 FOR RUNS OF 151 FEET OR LONGER OR FOR ANY LENGTH RUN WITH MORE THAN
P 1 1 180 DEGREES M BENDS.P/C SCHEDULE 40 OENDS ARE ACCEPTABLE FOR RUNS OF
40___ 1 1 150 FEET OR LESS.THE MAXIMUM TOTAL BENDS IN ANY CONDUIT RUN IS 270 DEGREES
1 1 1 PD6
------------.---------------------.____1INSTALL: 4.CUSTOMER RESPONSIBLE FOR ROAD CROSSINGS.ALL CROSSINGS MUST EXTEND
1 1 111 • FROM PROPERTY LINE TO PROPERTY LINE.USE ONLY GRAY SCHEDULE 40,
ABC 150 S• 345" E 11 Transformer-Three Phase Underground FROMELECTRICAL GIME.PVC CONDUIT.CROSSINGS TO BE 48 IkHES DEEP,MEASURED
yQ(j A111 3P 12.5/7,2 208/120 PM 500KVA NTLB FROM FlNAL GIME.
1 E Y
S.
DIRECTIONAL BORING REQUIREMENTS:BUCK HDPE(HIGH DENSITY POLYETMVLEND DUCT
OR SCHEDULE 40 PVC WITH A MECHANICAL CONNECTION(CERTA.LOK OR LIKE MECHANICAL
CONNECTION PRODUCT)AS AN ALTERNATIVE TO HDPE DUCT.HDPE SHALL MEET THE
Vi 143 REOUIRE/OMpENTS OF PGE SPECIFICATION LC20515(AVAILABLE ON REQUEST FROM PGE PROJECT
VT 144 ppE PIPE 5 REQUIREDDAFTEREASONS SAN AT1L NF l'JITH�BEEDUt EELACKM Ni) MANDREL RESENT H THREE EQUALLY SPACE OFCE
PD-1$ S.CUSTOMER TO PROVIDE ANO INSTALL n644fGE VAULT WITH R6433R2P--2125 COVER,
INSTALL: PUTILITY:'MLTITO MODEL
AT FlNAL GRADEF SEE OETPNML MOUNT TC FORMERS.
Transformer-Three Phase Undergrountl
3P 12.517.2 MOM 20 PM 150KVA NTLB T. LL PGE TRANSFORMERS TQ BE METALLED 8 FEET(W%FROM ANY COmOUSTIBLE
BALDING,WALL OR OVERHANG AND I FEET(MIO FFROM ANY FIRE HYDRArdT.
577-PGE SWirCH VAULT PGE TRANSFORMERS MUBT BE W7TMN 15 FEET OF A ORNEABLE ARE0.
ALWAYS MAINTAIN 10 FEET CLEAPANCE M FRONT OF ALL TRANSFORMERS,
577-PGE SWITCH VAULT �^TO � 8.METER BASES FOR OFFICES,11TLRV UNDPY AND RECREATION ROOMS TO HAVE
PD 6 1 / - -- __-_ serif tI00u o e THINK FACTORY INSTALLED MANUAL C82CVIT CLOSING DEVICE(LINK BYPASS ONLY).
IJ'TD _ _- �� J/ _ -_ MIaO�®ae Mr.
st n ro s / ------ 9.ALL METER BASES TO BE INSTALLED ON FRONT OF BUILDING OR WITHIN 10 FEET
VT 144 •T SAFETY OF FROM ON END OFGIune
BULgNG.
- - R To Arlaosm In/" RIRSTI IO.STEEL BARRIER POSTS ARE REOURRED AROUND TRANSFORMERS THAT ARE EXPOSED
nyRT AT�N TO VEHICLES.
sA 1J'70 x oo Nor axes
N 115 P sMUAT�rs� HALL SWITCH VAULTS TO BE SET AT FINAL GRADE WfrH 6 INCH GRAVEL BASE AND
CONDUITS ALIGNED TO ENTER THE VAULT END LOWER KNOCKOUTS(TERM-INDUCTS).
1J^70 I EDIT[Rms aeiALL S•a u (SEE DETAIL ON SKETCH
rc arTwTEH P4R�
PD IS P vAOER i1M+T enc 12.FRONT LOT PUBLIC UTRM EASEMENT(P.U.EJ TOBE8FEET(ME8
��sa•uN' I 10 FEET(PREFERREDi.
D^220 • 1 �- TO VT-144
^'e Vr 143 1/ 8 13.ESTIAATED AMPS MOTOR STARTING CURRENT FOR FLICKER CALCULATIONS
TRANSFORMER .
'\ TRANSER LOADING AND VOLTAGE DROP CALCULATIONS BASED ON�.KW
VT-143
PER FORM R L
Yr'AIIRR r 14.CONSULT WITH PGE REPRESENTATNE 2 WEEKS BEFORE STARTING MAIN POWER
ORlsE'®aOCa �� TRENCHING FOR A PRECONSTRUCTK)N CONFERENCE.INCLUDED IN THIS CONFERENCE
R A—A r 4-UQP MO CONTACT SERVICE COORDINATOR WILL Be EXCAVATOR,PGE,TELCO,CAN,AND GAS.
4'-." FOR TRENCH W COMDUn INSPECTION EerOR ISO
f•Zr M4 TO RA[KFAL.PGE MSL Ho INSTALL MRf 15'DUDERGROUNDD ON ASE EQUIPMENT MpppAY BEµRGR� N AT AN ADORAF�IAL C09TDMD
L/Er'L TRENCH 15 MOS BACKNLLFO.
SERVICE COORDINATOR SDI MENG REVIEW: ASSUMT BY DESIGNER-
503-323-6700 OR 800-542-8818(SALEMJ DATE:SY2018 SCALE:NTS ACCO—1070001 AWO: 1000004597 rNO.M2294965
ANY DEVIATION FROM THIS DESIGN MUST TTHE SPANOS CORPORATIOTITLE+�
BE APPROVED BY PGE PROJECT MANAGER CIRCurr slzE
TIGARD-13361 17x22
ATTENTION: CALL 811 BEFORE YOU DIG PGE / LOCATKDN
RIGHT-0F-WAY PERMIT NOTICE: OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED 8900 SW OAK ST TIGARD
BY THE OREGON UTILITY NOTIFICATION CENTER. DESCRIPTION
A PERMIT FROM THE LOCAL JURISDICTION IS REWIRED BEFORE ANY E RULES ARE SET FORTH M OAR 952-001-0010 , PROVIDE 3P 120208,2 2000A d 1 800A UG SVC TO 2 NEW APT BLDGS
WORK IN THE RIGA-OF-WAY MAY 8E PERFORMED. ONLY PGE APPROVED H 952-001-0090.YOU MAY OBTAIN COPIES OF COUNTY ECTION(S) WORK WTrH
PRE-CONSTRUCTION PR MEETING/TRENCH AND CONDUIT INSPECTION CONTRACTORS AND CONTRACTORS WHO HAVE MME OTHER SPECIAL E RUNES BY CALLING THE OREGON UTILITY SHEET
BFAVERTON WASHINGTON Cil-35A
YOUR J REQUIRES A PRECONSTRUCTION MEETING.CONTACT YOUR SERVICE d DESIGN AGREEMENTS WITH PGE WILL 8E ALLOWED TO WORK UNDER PGE'S PERMIT. NOTflCATIDI4 CENTER ADMINISTRATION @ (509-292-1987) I OF I
PROJECT MANAGER 7 TO 10 WORKING DAYS PRIOR TO EXCAVATION R COORDINATE THE THE CONTRACTOR MUST NOTIFY THE LOCAL 1lIR1SDICTION 4B HOURS LINE CREW CENTER DESIGN BY PHONE(503) DRAWN aY
PRE-CON.PGE'S FIELD CONSTRUCTION COORDINATOR f FCC) WILL PROVIDE YOUR TRENCH BEFORE WORK IS TO BEGIN.A COPY OF THE PERMIT MUST BE ON$ITE. TO REQUEST UTILITY LOCATES CALL THE OREGON ��wkBYs below. n13-n)m ILP LAMES CHRISMAN 73 5749 LANE WHITNEY
AND CONDUIT INSPECTIONS. UTIUrY NOTIFICATION CENTER,811 A7 LEAST au IT—.ITE sTwe
2 BUSINESS DAYS PRIOR TO EXCAVATION. Ca1l before you dI9• 0 PORTLAND GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED
oI------------------------� � oN
CD
a Q N Single Flagger Operation _' m
C `� I for Low volumes � (Optional) O� a
O o W o y N 'a I (�T � ro srov non O.
cr, BE
0 0 0 ? a„°OFH a e c I PREPARED O ROAD NE E
o !► I TO STOP �� r
co 4-
0 0 0 M — . .r.® — I • ROAD
' WORK
o cin o n to
o I C I a I a I A AHEAD
IBuft
0 o H O
0 N
N
s«OwpW 4
Nco 0 I M0000cNno�"oc01i� 4 B B C
Tt
-------------------
1 mile _I 'i1
max.
Tt (O
B B A
Buffer
Protection Vehicle
ROAD w/TMA(both Optional)
WORK See Chapter 4 _0
AHEAD BE
ONE LANE
n ROAD PREPARED Two Flagger Operation
n�
AHEAD TO STOP
W CD
N co
U1 (Optional) p v,