PFI2018-00099 �
CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT
14
COMMUNITY DEVELOPMENT Permit#: PF12018-00099
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 05/01/2018
Parcel: SEG3604
Jurisdiction: Tigard
Site address:
Subdivision: Lot:
Project: PGE
Project Description: SEG 3604/Adjacent to 11300 SW 81 st Ave. Provide 1 P 120/240V 200A underground service to shop.
Owner: FEES
Description Date Amount
PHONE:
Contractor:
EXTREME EXCAVATING INC
24580 SOUTH CHINA STREET
CANBY, OR 97013
PHONE: 503-263-8088
FAX:
Applicant:
TOD SHATTUCK
10800 SW AVERY STREET
TIGARD, OR 97223
PHONE: 503-612-2935
Total $0.00
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
Permittee/Applicant
Signature:
Issued By:
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PF12018-00099
Type: Condition Name: Status: Severity:
PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice
Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of
any agreement with the City of Tigard regarding work to be done pursuant to this permit.
PFI_Utilities 02-WORK SITE AREA Applied Notice
The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited
and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up
and suspension of work to accomplish clean-up.
PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice
Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI_Utilities 04-WORK SITE REPAIRS Applied Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be
reinstalled or replaced,with like kind of material. Obtain City approval of restoration work.
PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice
Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices
[MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition, American Traffic Safety Services
Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH].
PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice
Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work
area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be
effectively maintained.
PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice
Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The
applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and
area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire& Rescue)and to 503-962-8140(Tri-Met)
and 503-431-2345(Tigard School District) and other service providers impacted by such closure.
PFI_Utilities 08-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice
Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City
approval of any access closures.
PFI_Utilities 09-TRAFFIC CONTROL WORK HOURS Applied Notice
Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City.
PFI_Utilities 10-TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice
Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the
City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized
by the City Engineer.
PFI_Utilities 11 -TRAFFIC CONTROL MODIFICATION Applied Notice
The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to
assure public safety.
PFI_Utilities 12-UTILITY NOTIFICATION Applied Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987.
If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit
holder's expense.
PFI_Utilities 13-UTILITY LOCATION CONFLICT Applied Notice
Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole
before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at
the applicant's expense. Changes must be approved by the City in advance of work. Applicant shall coordinate the work
with affected utility agencies.
PFI_Utilities 14-TEMPORARY PATCH Applied Notice
A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance
approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is
liable for hazards or damage resulting from the prosecution of the work.
PFI—Utilities 15-REPAIR OF EXISTING FACILITIES Applied Notice
Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by
the Inspector, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit.
Corrective work shall be done at the applicant's expense.
PFI Utilities 16-PRECONSTRUCTION MEETING Applied Notice
Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert
Phone#>, to establish a preconstruction meeting.
PFI_Utilities 17-NOTICE TO COMMENCE WORK Applied Notice
The applicant shall notify the City's Inspector twenty-four(24) hours prior to commencing work, prior to any staged
inspection, and after completing work covered by the permit.
PFI_Utilities 18-PERMIT/PLAN ON SITE Applied Notice
A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and
provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work
performance.
PFI Utilities 19-MONUMENT PROTECTION Applied Notice
Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's
expense.
PFI Utilities 20-EMERGENCY CONTACTS Applied Notice
Provide to the City inspector, in writing, the names and 24 hour emergency telephone number of two(2)persons who have
authority to resolve problems, take corrective action and, in general,will be responsible in case of any emergency. The
applicant shall notify the City Inspector, in writing, of any/all assignment changes.
PFI_Utilities 21 -OTHER Applied Notice
RECEIVED
City of Tigard APR 3 0 2018
PUBLIC WORKS — ENGINEERING C;TY OF-i IGARD
NIN,G/E=NGINEERING
Public FacestY ImP rovement PFI)P tVermit
TYPE OF WORK
DESCRIPTION OF WORK(in the right-of-way)
TYPE 1—Franchise Utility Work
Check one: N�Utilities ❑Sidewalk/driveway approach ❑Street improvements performed by NV/N, PGE
Detailed description:
PROVIDE 1 P 120/240V 200A and/or utility agency.
UNDERGROUND SERVICE TO SHOP ❑ TYPE 2-Sidewalk/Driveway/Sewer
PGE Job M2346401 Work performed for the purpose of:
• Sidewalk installation or repair.
• Driveway approach installation
11300 SW 81 st Avenue
Property address/location(s): and/or repair
S Tigard, OR 97223 • Sanitary sewer lateral installation
and/or main line tap
Applicant: Portland General Electric [Submitted by Amy Sweany] ❑ TYPE 3—Full scale Development
Work performed with Land use
Address: 10800 SW Avery Street approval which includes any of
City/state: Tigard, OR Zip: 97062 the following:
Phone: 503-612-2935 Email: preregcoord@pgn.com • Subdivisions or Partitions
Contact name: SDPM Tod Shattuck Phone: 503-672-5466 • Street widening
• Mainline installation for Sanitary
Contractor: Extreme Excavating, Inc
sewer, Storm sewer, Tigard water
and/or Tigard Water Service Area
CCB#: 149829 Expiration: 12/12/19
Address: 24580 South China Road SUBMIT COMPLETED APPLICATION TO:
City/state: Canby, OR Zip: 149829 City of Tigard
503-263-8088 Planning/Engineering
Phone: Email: 13125 SW Hall Blvd.
Contact name: Shawn Duntley Phone: 503-969-6488 Tigard,OR 97223
Applications for"minor work in right-of-way"
only may be emailed to:
Engineer: N//4 royMermitsktigard-or.gov
Address:
City/state: Zip: r,,
Phone: Email: Case No.:?Fl 2,0M - WO 01v 1
Contact name: Application submittal fee(.007%of
Engineer's Estimate) $
Estimated value of work is required(if over$5,000):$ N/A Additional fees: $ '0'f
(within the public right-of-way) Application accepted:
By: Date:q �� E5
Is work related to a LAND-USE DECISION? ❑ Yes E(No
If so,please specify (MLP,SDR,SUB, etc.) case #: Applica 'on reviewed:
By: Date:
Is work related to a BUILDING PERMIT? ❑ Yes L7 No Applicant notified:
If so,please specify(BUILDING PERMIT)case#: By: Date:
I:\ENG\PermitApplications\pfi_application Rev.10/16/2017
City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov 503-718-2421 • Page 1 of4
APPLICANTS
NOTE: Person specified as"Applicant"shall be designated"Permittee"and shall provide financial assurance for work,if
required by the city pursuant to TTMC 15.041.140.
* With the exception of a utility operating pursuant to a valid franchise with the Cit} of Tigard,when the owner and the applicant are different
people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the
owner. The owner(s)must sign this application in the space provided or submit a written authorization with this application. Franchised
Utilities are not required to obtain the owners signature on the application
BY SIGNING BELOW,THE APPLICANT(S) SHALL CERTIFY THAT:
• The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject
property.
• If the application is granted,the applicant will exercise the rights granted in accordance with the terms and subject to all the
conditions and limitations of the approval.
• All of the above statements and the statements in any plot plan,attachments,and exhibits transmitted herewith,are true;and
the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such
statements are false.
• The applicant has read the entire contents of the application,including the policies and criteria,and understands the
requirements for approving or denying the application.
/N� Gohar Shafiq 04-27-2018
Applicant/Authorized Agent's signature Print name Date
SIGNATURES of each owner of the subject property, if required.
Owner's signature Print name Date
Owner's signature Print name Date
Owner's signature Print name Date
PUBLIC FACILITY IMPROVEMENT PERMIT
City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov 503-718-2421 Page 2 of4
DEVELOPMENT ENGINEERING FEES FOR STAFF USE ONLY
Public Facility Improvement(PFI)Permit: DETAILED SUBMITTAL
APPLICATION FEE REQUIREMENTS
Part 1: Required submittal fee$300.00 (minimum) FRANCHISE UTILITY AND SIDEWALK/
DRIVEWAY AND UTILITY
PERMIT FEE CONNECTIONS,ETC.
Part 2: All non-water system improvements (work in the right of way)
Engineer's estimate X 5%(less$300.00 minimum
submittal fee) Sketch
Engineer's estimate X 2%Plan Review (including information below)
❑ Dimensions
WATER SYSTEM FEE ❑ Street Name
Part 3: All public water system improvements ❑ Site Address
Engineer's estimate X 12%
FULL SCALE DEVELOPMENT
PFI Permit Fee Exemptions: (Subdivisions/Partitions and Street Improvements)
There will be no permit fee charged,or assurance required
for the following types of work: Design Plans
• Sidewalk repair(less than 20 lineal feet) (6 sets,24x36 or 2204)
• Relocate or replace mailbox ❑ Cover—Site,Vicinity,Abbreviation,Legend
• Ditch cleaning that does not involve regrading. ❑ General Notes(City,Water,Sewer,etc.)
• Weep hole repair ❑ Street(Plan,Profile)
• Curb repair or replacement(less than 20 lineal feet) ❑ Water,Storm and Sanitary(Plan Profile)
• Lawn sprinkler system installation or repair ❑ Water Quality Facilities
• Street tree pruning or planting ❑ Grading
• Planter strip landscape maintenance ❑ Landscaping/Tree Plan
• Test wells ❑ Composite Utility Plan(Electrical,Phone,Gas,
Storm,Sanitary,Water,Signage,Street Lights,etc)
❑ Details
Note: A cash/bond assurance maybe ❑ Traffic Sight Distance
required per TMC 15.04.140. ❑ Signing and Striping
(customer deposit) ❑ Street Light Plan and Photometric
❑ Engineers seal/signature
❑ Sheet label(project land use name,revision and
plan log block,dates and sheet numbers.)
Additional Submittals
(per Land Use conditions)
❑ Traffic Report
❑ Storm water Drainage Calculations
❑ Geotechnical Report
❑ Preliminary Access Report(Sight Distance)
❑ Proposed Plat
❑ Pathway Design Of applicable)
❑ Water Department Approval
❑ Engineers Construction Estimate
PUBLIC FACILITY IMPROVEMENT PERMIT
City of Tigard 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page.3 of4
SAMPLE SKETCH:
I
Edge of Pavemeru
.,4._ Titch ".■"�"'
Streetlight I •�►• •�■ •arr•s•�•ir�•
I • �' itia�►77saa�►
r Q
I I •
' T��ropoel r-I"F"
Ld 1
I
a� 1
' 1 iExisting House
I a1 1 Existing 1
r IW
ca
I D ri�vewa y .
I
r
Iall01 1 .
� 1
CL
0I d
X,
Existing Shop 1
� J
r
Powerpole
• � o . 3 ■
I �`3- 95' 1
I
I I I Dire Hydrant(FH)
I
i Scale- '1"=34'
I
�' I �
I .
I �
MINIMUM SKETCH REQUIREMENTS (Put"N/A"if Not Applicable):
North arrow Property lines& dimension Slope of property
Street &street name(s) Existing building, structures Utility&street light poles
Proposed work Existing curb or edge Trees
Existing S/W or of pavement Existing utility locations
D/W apron (sewer,water)storm)
PUBLIC FACILITY IMPROVEMENT PERMIT
City ofTigard - 13125 SW Hall Blvd. - Tigard,Oregon 97223 - wwwtigard-or.gov - 503-718-2421 - Page 4 of4
COMMERCIAL LEGEND
Road Side 24" Spoil
dd—Typical NEW PGE FACILITIES TO BE INSTALLED
LEGEND (UNLESS OTHERWISE SPECIFIED)
30" O PGE Primary/ ---_--_ INSTALL 1-41)AL-TX IN 1-3"PVC CONDUIT
Mi
3 n Cover Inside Duct Min Secondary Cable PROVIDED & INSTALLED BY CUSTOMER
Trench 0 Telco/CATV
1 10„ ®Backfill
0 Select Backfill CONSTRUCTION NOTES: CMDEV
12„Min Undisturbed
Earth 1. CUSTOMER IS RESPONSIBLE FOR ALL TRENCH,CONDUIT,VAULTS,PADS AND
ROAD CROSSINGS.
joint Use Trench W/O Gas 2. ALL CONDUIT TO BE INSTALLED WITH 30 INCHES(MIN)COVER AT TOP OF CONDUIT
FROM FINAL GRADE.
3. ALL PGE CONDUCTORS TO BE INSTALLED IN GRAY,SCHEDULE 40,ELECTRICAL GRADE,
PVC CONDUIT WITH NYLON PULL STRINGS(MIN.500 LBS.TEST).PGE TO DETERMINE
THE SIZE AND NUMBER OF CONDUITS REQUIRED.MAINTAIN 12 VERTICAL INCHES AND
24 HORIZONTAL INCHES CLEARANCE BETWEEN GAS AND OTHER UTILITIES.ALL ELBOWS
4 INCH&SMALLER TO BE 36 INCH RADIUS.ALL BENDS MUST BE FACTORY MADE.
C 50 21734 ALL ELBOWS LARGER THAN 4 INCH TO BE 60 INCH RADIUS.RIGID STEEL OR PGF
APPROVED,FIBERGLASS BENDS ARE REQUIRED FOR RUNS OF 157 FEET OR LONGER,
OR FOR ANY LENGTH RUN WITH MORE THAN 780 DEGREES IN BENDS.PVC SCHEDULE
ryPv PO-i5 ii 40 BENDS ARE ACCEPTABLE FOR RUNS OF 150 FEET OR LESS.THE MAXIMUM TOTAL
BENDS IN ANY CONDUIT RUN IS 270 DEGREES.
/ 4. DIRECTIONAL BORING REQUIREMENTS:BLACK HDPE(HIGH DENSITY POLYETHYLENE)DUCT
1201240V CONNECTION
SCHEDULE 40 PVC WITH A MECHANICAL CONNECTION (CERTA-LOK OR LIKE MECHANICAL
CONNECTION PRODUCT)AS AN ALTERNATIVE TO HDPE DUCT.HDPE SHALL MEET THE
200,6,/y�P REQUIREMENTS OF PGE SPECIFICATION LC20575(AVAILABLE ON REQUEST FROM PGE PROJECT
MANAGER),FOR SAFETY REASONS THE DUCT SHALL BE BLACK WITH THREE EQUALLY SPACE
>2%VD EXTRUDED RED STRIPES(WHICH IS A SPECIFICATION REQUIREMEN MANDREL TEST OF
120
/ 1.5%FLKR HDPE PIPE IS REQUIRED AFTER INSTALLATION WITH PGE INSPECTOR PRESENT.
GJ �7 5,069A AFC 5. ALL PGE TRANSFORMERS TO BE INSTALLED 8 FEET(MIN)FROM ANY COMBUSTIBLE
SAFETY SOCKET THINK BUILDING,WALL OR OVERHANG AND 4 FEET(MIN)FROM ANY FIRE HYDRANT.
PGE TRANSFORMERS MUST BE WITHIN 15 FEET OF A DRIVEABLE AREA.
______ ----- - .- ALWAYS MAINTAIN 70 FEET CLEARANCE IN FRONT OF ALL TRANSFORMERS.
SAFETY 6. TRANSFORMER PADS ARE TO BE SET SO THAT THE TOP IS 2 INCHES ABOVE
NEW C1 1-36C
FINAL
CONDUIT IS TO BE
INCH ABOVE INSTALLED
NSTP�D IN PAD AS INDICATED IN DETAIL
SHOP FIRSTITHE
7. STEEL BARRIER POSTS ARE REQUIRED AROUND TRANSFORMERS THAT ARE EXPOSED
TO VEHICLES.
8. ALL SWITCH VAULTS TO BE SET AT FINAL GRADE WITH 6 INCH GRAVEL BASE AND
CONDUITS ALIGNED TO ENTER THE VAULT END LOWER KNOCKOUTS(TERM-A-DUCTS).
(SEE DETAILS ON SKETCH)
9. PGE TO BE N077FIED AND INSPECT ALL CONDUIT,VAULT AND PAD INSTALLATIONS
EXISTING
BEFOREWITH
AKFI N EW VAULT&R REPRESENT D LOCATIONS TO BE FIELD VERIFIEC
HOME 70. REFER TO PGE ELECTRICAL SERVICE REQUIREMENTS BOOK FOR FURTHER DETAILS
&SPECIFIC REQUIREMENTS.LINK TO WWWvnRT1enlnr:FNFReI rnuvFQRnnr
11300 11. DESIGN IS BASED ON STANDARD UNDERGROUND EQUIPMENT.NON-STANDARD
SW BIST UNDERGROUND EQUIPMENT MAY BE AN OPTION AT AN ADDITIONAL COST TO
THE CUSTOMER
2. THE POINT OF DELIVERY AND DIVISION OF OWNERSHIP BETWEEN THE CUSTOMER
1 PGE WILL BE AT THE LINE SIDE OF THE NEW CUSTOMER PROVIDED SWITCH GEAR
PGE H TRU 1 D WIN
5944 AS—BUILT VERIFICATION & NESC VIOLATIONS CORRECTED
45'-3 This document accurately represents FIELD Construction
1978 Foreman: Date:
CONTACT SERVICE COORDINATOR
143 25 T FOR TRENCH AND CONDUIT INSPECTION PRIOR General Foreman: Date:
TO BACKFILL.PGE WILL NOT INSTALL WIRE
11NTlt TRFNCH IS 100"o BACKFILLED (Signature only required for field construction changes.)
AC a CU SERVICE COORDINATOR SDPM/ENG REVIEW: ASBUILT BY DESIGNER:
8 2 ACSR 503-323 6700 OR 800-342-8818(SALEM) OArl: IPIWO17 SCALE: NTS ACCOUNT: 1070001 AWO: 1000004599 JOB NO.M2346401
3-142 25 T ANY DEVIATION FROM THIS DESIGN MUST TITLE
CHONG WO(YJOHN SUTTON
SW PFA BE APPROVED BY PGE PROJECT MANAGER CIRCUIT SIZE
WEST PORTLAND-NORTH 11X17
ATTENTION: CALL 811 BEFORE YOU DIG PGE LOCATION
L, ABC 2 AL RIGHT-OF-WAY PERMIT NOTICE: I
OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED '
BY THE OREGON UTILITY NOTIFICATION CENTER. DESCRIPTION
11300 SW 81ST AVE,TIGARD
VT 48 A PERMIT FROM THE LOCAL JURISDICTION IS REQUIRED BEFORE ANY THOSE RULES ARE SET FORTH IN OAR 952-007-0010 ' PROVIDE TP 12C 240V 200A UG SERVICE TO SHOP
WORK IN THE RIGHT-OF-WAY MAY BE PERFORMED. ONLY PGE APPROVED THROUGH 952-001-0090.YOU MAY OBTAIN COPIES OF COUNTY ECT10N(S) WORK WITH SHEET
CONTRACTORS AND CONTRACTORS WHO HAVE MADE OTHER SPECIAL THE RULES BY CALLING THE OREGON UTILITY WASHINGTON CI136C
AGREEMENTS WITH PGE WILL BE ALLOWED TO WORK UNDER PGE'S PERMIT. NOTIFICATION CENTER ADMINISTRATION @ (503-232-1987) BEAVERTON IS I OF 1
THE CONTRACTOR MUST NOTIFY THE LOCAL JURISDICTION 48 HOURS LINE CREW CENTER DESIGN BY PHONE(503) DRAWN BY
TO REQUEST UTILITY LOCATES CALL THE OREGON lcrlow,,bays below. 2213 SW 153RD DR Tod Shattuck 672-5466 LANE WHITNEY
BEFORE WORK IS TO BEGIN.A COPY OF THE PERMIT MUST BE ON SITE. UTILITY NOTIFICATION CENTER,811 AT LEAST BEAVERTON,OR 97006
2 BUSINESS DAYS PRIOR TO EXCAVATION. Call before you dig.I 0 PORTLAND GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED
Page 54 2011 Edition
Pedestrian Accommodation Diagrams
See Diagrams 5-7 and 5-8, below, for pedestrian accommodations in work
zones.
Pedestrian Accommodation Principles:
1. If the work impacts the sidewalk or pedestrian facility, provide a safe,
accessible path, where practical, in accordance with the requirements
of the ADA.
2. If not practical to match the width of the existing pedestrian facilities,
maintain a 4-ft minimum width.
3. Unless a reasonably safe route can be provided through the work
space, pedestrians should be appropriately directed with advance
signing to cross the road. Do not divert pedestrians into travel lanes.
4. Install pedestrian closure or detour signing on Type II barricades.
Make every practical effort to satisfy the following:
• If work closes a sidewalk or sidewalk ramp, close sidewalks at a point
where an alternate crossing point or route can be provided. Minimize
the amount of out-of-direction travel for pedestrians.
• Use a combination of"SIDEWALK CLOSED" (R9-9), "SIDEWALK
CLOSED USE OTHER SIDE" (R9-10), "SIDEWALK CLOSED AHEAD
CROSS HERE" (R9-11), and "SIDEWALK CLOSED CROSS HERE"
(R9-11a) signing to direct pedestrians to an alternate facility.
• Where there are business destinations between the nearest crosswalk
and the work area, close the sidewalk at the business access nearest
the work area, where practical using the SIDEWALK CLOSED sign.
Include the SIDEWALK CLOSED AHEAD CROSS HERE sign at the
nearest crosswalk prior to the closure.
Chapter 5 September 2016
2011 Edition Page 55
Pedestrian Accommodation, Mid-Block Diagram 5-7
The sidewalk should be closed at the nearest intersection on each side of the
work area when a safe, ADA-compliant path through the work area is not
available.
J
SIDMA"LK
�♦ or AHEAD
CRO68 HERE -�
CPAM HERE
24x12
Type"w1' 24x18
(Mount on B(II)L) Type'V111'
SIDEWALK
CLOSED
24x12
Type'wi'
(Mount on B(II)LR)
(2 Reo.)
81DEWALK CLCBED
SIDEWALK cLosED
or AHEAD
CtOW HERE ~-
--- -- CR033 HERE
24x12 24x18
Type Owl
(Mount on B(II)R) Type Owl
September 2016 Chapter 5
Page 84 2011 Edition
,
Stationary Lane Closure with Flagging Diagram 320
Diagram 320 covers total closure of one lane of a two-lane, two-way
roadway. See the detail inset for the layout if using a single flagger to control
both directions of traffic on low volume roads (less than 400 ADT)with good
sight distance as discussed below.
1. Use truck-mounted flashing warning lights on work and protection
vehicles. See Section 4.3—Lights and Lighted Signs for exceptions.
2. For added visibility, a truck-mounted arrow board or PCMS in caution
mode may be used.
3. Flaggers at each approach are required if any of the following
conditions exist:
a. Night Operations.
b. Work space is over 200 feet in length.
c. Sight distance is less than 750 feet from each approach
through the lane closure.
d. Traffic volumes are greater than 400 ADT.
4. The length between the Flagger Ahead signs shall not exceed one
mile. Use Diagram 340—Lane Closure with Pilot Car if exceeding one
mile.
5. Cones should be used to outline the work space when curves or other
roadway alignments prevent clear direction for the motorists to pass
the work space safely.
6. Cones along the work space are recommended when posted speeds
are 45 mph or greater, when working under heavy traffic or when travel
lanes are narrower than 11 feet.
7. Extended queue signing (see Diagram 5-4) should be used when
traffic queues extend beyond the initial advance warning sign.
& When flagging near an intersection, the"Flagger Ahead" (CW23-2)
sign should be visible to traffic entering from any side road. Additional
advance warning and Flagger Ahead symbol signs may be placed on
the side road(s).
9. Sign set-up and flagger placement shown may be used for intermittent
full road closures of 20 minutes or less.
10. The"ONE LANE ROAD AHEAD" (W20-4) sign is optional and should
be considered on high volume or high speed roads, or when extended
queues are expected.
Chapter 5 September 2016
_C)
p A W W N N `^ Single Flagger Operation ,, ' 1
" $ ID
"' "' `n a a for Low Volumes E (optional) o Q
(ADT<4D0)
0
`^ 3 \ BE o
8 8 0 8 FLAOOEA PREPARED ONE
E LANE
Tt I
9 W T• H H o H NNTO STOP \AHEAD r
m m — — —• •— — — • ` ROAD
o ♦ Ito
♦ WORK
8 8 0 8 ^ K c K e o e K n I--J i AHEAD O
Rchulm VNrd. co
4 I
Qt N M Ln N M o N 8 v. O a�IR
In n cn O O O O o V
~ ROM I ♦V
<,>
A B
---- -- -- ----- -------ITt 3
1 mile _� '1'I
max.
K K K � • • •
Lfl
B B A
Buffer
/ \ Protection Vehicle
ROAD • w/TMA(both Optional)
WORK See Chapter 4 _❑
AHEAD
BE �
ONE LANE
ROADAHEAD To oPD Two Flagger Operation
w 0
�, (Optional) p
CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT
s COMMUNITY DEVELOPMENT Permit#: PF12018-00099
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 05/01/2018
Parcel: SEG3604
Jurisdiction: Tigard
Site address:
Subdivision: Lot:
Project: PGE
Project Description: SEG 3604/Adjacent to 11300 SW 81st Ave. Provide 1 P 120/240V 200A underground service to shop.
REPRINTED ON 3/20/19 WITH UPDATED CONTRACTOR INFO.
Owner: FEES
Description Date Amount
PHONE:
Contractor:
HOLLENBACH& HURD INC
5291 NE ELAM YOUNG PARKWAY SUITE 180
HILLSBORO, OR 97124
PHONE. 503-591-5987
FAX: 503-848-6832
Applicant:
TOD SHATTUCK
10800 SW AVERY STREET
TIGARD, OR 97223
PHONE: 503-612-2935
Total $0.00
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
Permittee/Applicant
Signature: See application
Issued By: �: te
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PF12018-00099
Type: Condition Name: Status: Severity:
PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice
Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of
any agreement with the City of Tigard regarding work to be done pursuant to this permit.
PFI_Utilities 02-WORK SITE AREA Applied Notice
The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited
and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up
and suspension of work to accomplish clean-up.
PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice
Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI_Utilities 04-WORK SITE REPAIRS Applied Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be
reinstalled or replaced,with like kind of material. Obtain City approval of restoration work.
PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice
Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices
[MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services
Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH].
PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice
Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work
area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be
effectively maintained.
PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice
Public roadway shall not be closed to traffic, at any time, without obtaining written approval from the City Engineer. The
applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and
area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire& Rescue)and to 503-962-8140(Tri-Met)
and 503-431-2345(Tigard School District)and other service providers impacted by such closure.
PFI_Utilities 08-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice
Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City
approval of any access closures.
PFI_Utilities 09-TRAFFIC CONTROL WORK HOURS Applied Notice
Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City.
PFI_Utilities 10-TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice
Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the
City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized
by the City Engineer.
PFI_Utilities 11 -TRAFFIC CONTROL MODIFICATION Applied Notice
The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to
assure public safety.
PFI_Utilities 12-UTILITY NOTIFICATION Applied Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987.
If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit
holder's expense.
PFI_Utilities 13-UTILITY LOCATION CONFLICT Applied Notice
Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole
before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at
the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work
with affected utility agencies.
PFI_Utilities 14-TEMPORARY PATCH Applied Notice
A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance
approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is
liable for hazards or damage resulting from the prosecution of the work.
PFI_Utilities 15-REPAIR OF EXISTING FACILITIES Applied Notice
Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by
the Inspector, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit.
Corrective work shall be done at the applicant's expense.
PFI_Utilities 16-PRECONSTRUCTION MEETING Applied Notice
Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert
Phone#>,to establish a preconstruction meeting.
PFI_Utilities 17-NOTICE TO COMMENCE WORK Applied Notice
The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged
inspection, and after completing work covered by the permit.
PFI_Utilities 18-PERMIT/PLAN ON SITE Applied Notice
A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and
provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work
performance.
PFI_Utilities 19-MONUMENT PROTECTION Applied Notice
Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's
expense.
PFI_Utilities 20-EMERGENCY CONTACTS Applied Notice
Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have
authority to resolve problems, take corrective action and, in general,will be responsible in case of any emergency. The
applicant shall notify the City Inspector, in writing, of any/all assignment changes.
PFI_Utilities 21 -OTHER Applied Notice