Loading...
Kerr Contractors ~ C180050 CITY OF TIGARD-CONTRACT SUMMARY&ROUTING FORM Contract Overview Contract/Amendment Number: C180050a1 Contract Start Date: 5/1/18 Contract End Date: 4/30/24 Contract Title: Public Works On-Call General Construction and General Landscape Services Contractor Name: Kerr Contractors Oregon, Inc. Contract Manager: Joe Barrett Department: PW Contract Costs Original Contract Amount: $100,000.00 Total All Previous Amendments: Total of this Amendment: Total Contract Amount: $100,000.00 Procurement Authority Contract Type: General Services Procurement Type: PCR 10.075 Contract Amendments Solicitation Number: LCRB Date: Account String: Fund-Division-Account Work Order—Activit):1=e Amount FY On-Call FY FY FY FY Contracts & Purchasing Approval Purchasing Signature: Comments:Time extension only for remaining contract term. DocuSign Routing Route for Signature Name Email Address Contractor Alan Alpin estimatingkkerrcontractors.com City of Tigard Steve Rymer stever&tigard-or.gov Final Distribution Contractor Alan Alin estimatin kerrcontra ctors.com ettPro'ect Manager oe Barrose h ti and-or. ov iBuyer AnM Christine ti and-or. ov DocuSign Envelope ID:C4EB9F41-1E87-4B04-A419-5AF2A44F1787 CITY OF TIGARD,OREGON AMENDMENT TO CONTRACT NUMBER 0180050 FOR PUBLIC WORKS ON-CALL GENERAL CONSTRUCTION AND GENERAL LANDSCAPE SERVICES AMENDMENT #1 The Agreement between the City of Tigard, a municipal corporation of the State of Oregon,hereinafter called City, and Kerr Contractors Oregon,Inc.,hereinafter referred to as Contractor,is hereby amended as follows: 1. EFFECTIVE DATE AND DURATION The term of this Agreement is extended to April 30, 2024. 2. COMPENSATION Any payment made to Contractor will be based upon the attached revised Exhibit C and Oregon Prevailing Wage Rates when applicable. 3. SUBMITTING BILLS AND MAKING PAYMENTS The City's contract administrator is changed to: Joe Barrett,Public Works Business Manager i o s ephktigard-or.gov (503) 718-2477 4. All other terms and conditions to remain unchanged. IN WITNESS WHEREOF,City has caused this Amendment to be executed by its duly authorized undersigned officer and Contractor has executed this Amendment upon signature and date listed below. CITY OF TIGARD KERR CONTRACTORS OREGON,INC �$ttvt fu^ �dw,R�iu. nFaen Signature Signature Steve Rymer Alan Aplin Printed Name Printed Name 11/29/2021 11/24/2021 Date Date Rev. 8/21 DocuSign Envelope ID:C4EB9F41-1E87-4804-A419-5AF2A44F1787 Kerr Contractors Extra Work Rates 2021 Equipment Description Unit Operator Extra Work Rate 8A ASPHALTPAVING HR 8AALMIX ALMix Asphalt Plant HR OPP $744 8ABG Blaw Knox Paving Machine HR OPP $252 8ABOX Layton Paving Box HR OPP $77 8ACAT Cat Paving Machine HR OPP $317 8ACATH Cat Paving Machine Highway HR OPP $362 8AMTV Material Transfer Vehicle HR OPP $439 8APU Pickup Machine HR $103 8B BACKHOES HR 813310 John Deere 310 IT HR OPB $82 813410 John Deere 4102WD HR OPB $85 813710 John Deere 710 4WD HR OPB $87 8BDS John Deere Drag Scraper HR OPB $81 813HAT Rubber TireBackhoew/Att HR OPB $81 8BHHP Backhoe Hoe Pac Compactor HR $21 8BJD710 John Deere 710 Backhoe 4WD HR OPB $121 8C COMPACTORS HR 8C835 Cat 825/835 Sheepsfoot HR OPC $275 8CGRID Toe Behind Grid Roller HR $51 8CLGP 84"/2100mm Sheepsfoot Compac HR OPC $126 8CLGPV Large Paving Roller HR OPP $126 8CLGS 84"/2100mm Smooth Drum Roll HR OPC $126 8CSMPV Small Paving Roller HR OPC $79 8CSMS 54"/1350mm Smooth Pnuem Roll HR OPC $88 8D DOZERS HR 8D021 Komatsu D21 Dozer HR OPD $105 8D051 Komatsu D51 Dozer HR OPD $137 8D067LGP Cat D6T LGP Dozer HR OPD $214 8D06T Cat D6T Dozer HR OPD $220 8D0700 John Deere 700k Dozer HR OPD $112 8D0700LGP John Deere 700k LGP Dozer HR OPD $125 8D07E Cat D7E Dozer HR OPD $175 8D0834 Cat 834 Rubber Tired Dozer HR OPD $243 8D08L Cat D81- Dozer HR OPD $282 8D09N Cat D9N Dozer HR OPDL $298 8D10N Cat D10N Dozer HR OPDL $473 8D11T Cat D11T Dozer HR OPDL $611 8DDIS Disc for Dozer HR $30 8DRIP Ripper for Dozer HR $40 8DWIN Winch for Dozer HR $11 8E EXCAVATORS HR 8E004 3 TON/2.7 MG Excavator HR OPE $82 Pagel of 5 DocuSign Envelope ID:C4EB9F41-1E87-4804-A419-5AF2A44F1787 Kerr Contractors Extra Work Rates 2021 Equipment Description Unit Operator Extra Work Rate 8EO05 5.5 TON/5 MG Excavator HR OPE $89 8EO07 8 TON/7 MG Excavator HR OPE $107 8EO20 22 TON/20 MG Excavator HR OPE $131 8EO22 24 TON/22 MG Excavator HR OPE $131 8EO27 30 TON/27 MG Excavator HR OPE $184 8EO45 50 TON/45 MG Excavator HR OPE $271 8EO75 83 TON/75 MG Excavator HR OPEL $341 8EO88 88 TON/80 MG Excavator HR OPEL $382 8E136 150 TON/136 MG Excavator HR OPEL $599 8EHM Kent Hydrapack Hammer HR $102 8EHML Large Kent Hydrapac Hammer HR $152 8EHP Excavator Hoe Pac Compactor HR $51 8ESH Sheet Pile Hammer HR $152 8F FARM TRACTORS HR 8F65 Cat Challanger 65 HR OPD $170 8F85 Cat Challanger 8758 HR OPD $301 8G GRADERS HR 8G14M Cat 14M Motor Grader HR OPG $217 8G16 Cat 16G Motor Grader HR OPG $201 8G16M Cat 16M Motor Grader HR OPG $220 8G872 John Deer 872 Grader HR OPG $220 8GMIN1 Blade-All Mini Motor Grader HR OPG $100 8L LOADERS HR 81-11 1.5 CY/1.15 M3 Loader HR OPL $119 81-15 2.0 CY/1.50 M3 Loader HR OPL $114 81-23 3.0 CY/2.30 M3 Loader HR OPL $133 81-30 4.0 CY/3.00 M3 Loader HR OPL $140 81-38 5.0 CY/3.80 M3 Loader HR OPL $198 81-61 8.0 CY/6.10 M3 Loader HR OPL $277 81-76 10.0 CY/7.60 M3 Loader HR OPL $506 8LIT1 Integrated Tool Loader HR OPL $137 8LLF Log Forks HR $21 8LSKID Skid Steer Loader HR OPL $72 8M MISCELLANEOUS SMALL TOOLS HR 8MAC COMPRESSORS HR 8MACC 100 CFM/2.8 CMM Compressor HR $51 8MACC1 90 LB/40 KG Hammer for Compr HR $12 81VIC COMPACTION (HAND) HR 8MCJJ Jumping Jack Compactor HR $11 8MCPL Plate Tamper Compactor HR $11 8MG GENERATORS HR 8MG05 IS KW Generator I HR 1 $11 Page 2 of 5 DocuSign Envelope ID:C4EB9F41-1E87-4804-A419-5AF2A44F1787 Kerr Contractors Extra Work Rates 2021 Equipment Description Unit Operator Extra Work Rate 8MG10 10 KW Generator HR $21 8MG100 100 KW Generator HR $53 8MG200 200 KW Generator HR $65 8MGLP Light Plant HR $23 8ML LASERS HR 8MLGPSD GPS Grade Control Dirt HR $51 8MLGPSP GPS Grade Control Paving HR $51 81VILP Pipe Laser HR $11 8MLS Site Laser HR $11 8MO OFFICETRAILERS HR 8MOOFF Office Trai ler HR $9 8MP PUMPS HR 8MP075S 3"/75mmSubmersiblePump HR $11 8MP075T 3"/75mm Trash Pump HR $11 8MP100S 4"/100mm Submersible Pump HR $21 8MP100T 4"/100mm Trash Pump HR $21 8MP150S 6"/150mm Submersible Pump HR $42 8MP200T 8"/200mm Trash Pump HR $56 8MPPW Pressure Washer HR $46 8MPTP Test Pump HR $42 8MR RADIOS HR $2 81VIS SAWS HR 8MSAC Asphalt Wheel HR $21 81VISCO Cut-off Saw HR $11 81VISCON Concrete Saw HR $81 8MSCS Power/Chain Saw HR $11 81VIT TRENCH BOXES/SHORING HR 8MT01 Efficiency4x20'/1.2x6.4m Bx HR $11 8MT02 Efficiency 8x20'/2.4x6.4m Bx HR $14 8MT03 Efficiency 8x20'/2.4x6.4m Bx HR $16 81VITMAN Mandrel2"-12"/50mm-300mm HR $4 8MTP TRENCH PLATES HR 8MTP01 8'x20'Trench Plate HR $4 8MTP02 8'x20'Trench Plate DAY $9 8MTP03 8'x20'Trench Plate MON $158 8MTPT PiercingTool HR $40 8MTR TRAFFIC SIGNS HR 8MTR1 Arrow Board -Hourly HR $7 8MTR2 Arrow Board -Monthly HR $1,138 8MTR3 PCMS-Hourly HR $16 8MTR4 PCMS-Monthly HR $2,625 8MTR5 I Roller PCMS-Hourly I HR 1 $9 Page 3 of 5 DocuSign Envelope ID:C4EB9F41-1E87-4804-A419-5AF2A44F1787 Kerr Contractors Extra Work Rates 2021 Equipment Description Unit Operator Extra Work Rate 8MTR6 Roller PCMS-Monthly HR $9 8MTSS1 Speed Shoringw/Plywood HR $11 8MW WELDING HR 8MWMIL Miller Welding Machine HR $53 8S SCRAPERS HR 85615 Cat 615 Scraper HR OPS $193 85623 Cat 623B Scraper HR OPS $289 85627 Cat 627 Scraper HR OPS $350 85631 Cat 631 Scraper HR OPS $355 85633 Cat 633 Scraper HR OPS $389 85637 Cat 637 Scraper HR OPS $515 8SH2O8 Cat Water Pull HR OPS $240 8SPS Pull Scraper-Single 18 BCY HR $102 8T TRUCKS HR 8T4PU Foreman/Crew Truck HR FOC $63 8TADT22 25 TON/22 MG Articulated Trk HR OPT $159 8TADT30 32 TON/30 MG Articulated Trk HR OPT $200 8TADT32 35 TON/32 MG Articulated Trk HR OPT $210 8TADT36 40 TON/36 MG Articulated Trk HR OPT $228 8TADT45 50 TON/45 MG Articulated Trk HR OPT $287 8TADT55 60 TON/54 MG Articluated Trk HR OPT $343 8TFB Flatbed Truck HR $42 8THT055 55 TON/47 MG Hard Tail Truck HR OPT $389 8TLB50 Lowboy 50 TON/45 MG Trailer HR OPT $259 8TLB80 Lowoby 80 TON/72 MG Trailer HR OPT $464 8TMECH Mechanics Truck HR $67 8TMIL Milling Service Truck HR $63 8TPU Pickup HR $42 8TRT13 15 TON/13 MG Rubber Trk Trk HR OPT $173 8TSAW Saw Truck HR $51 8TSERV Service Truck HR ME1 $63 8TSTRL Small Equipment Trailer HR $21 8TTP Tack Trailer HR $40 8TTTK Tack Truck Distributor HR $121 8TWT08 2,000 GAL/7.6 KL Water Trk HR OPT $110 8TWT15 4,000 GAL/15.1 KL Water Trk HR OPT $138 8TWT15R Rental Water Truck HR $228 8TWTWG Water Wagon Tank HR LAPV $44 8Z OTHER EQUIPMENT HR 8ZCAD CAD Truck HR $306 8ZCH Debris Chipper/Grinder HR $613 8ZCH1 I Debris Chipper/Grinderw/Tr HR 1 $963 Page 4 of 5 DocuSign Envelope ID:C4EB9F41-1E87-4804-A419-5AF2A44F1787 Kerr Contractors Extra Work Rates 2021 Equipment Description Unit Operator Extra Work Rate 8ZCR30T Grove 30 Ton Truck Crane HR OPCR $175 8ZCRNL Large Crane HR $700 8ZCRNS Small Crane HR $525 8ZFLSH Flush Truck HR $350 8ZMILL10 Wirtgen W2200 Full Lane Mill HR OPML $1,108 8ZMILL11 Wirtgen W2200 Half Lane Mi II HR OPML $824 8ZMILL20 Wirtgen W2000 Half Lane Mi II HR OPML $688 8ZMILL30 Wirtgen W1200 One Meter Mill HR OPML $574 8ZMILL40 Wirtgen W50 Small Mill HR OPML $446 8ZPEGSON Pegson Jaw Crusher HR FOC $560 8ZPF1 Small Pipe Fusion Machine HR $46 8ZPF2 Large Pipe Fusion Machine HR $112 8ZPULV Wirtgen W2500 Pulverizer HR OPML $985 8ZPULV01 Wirtgen W2000 Pulverizer HR OPML $730 8ZPWRSCR Power Screen -Track Chiefta HR $259 8ZSPREAD Spreader Truck HR OPT $158 8ZSTKR Stacki ng Conveyor HR $61 8ZSWMOB Pickup Sweeper Mobilization HR $112 8ZSWPPU Pickup Street Sweeper HR OPC $177 8ZSWPPUR Pickup Street Sweeper-Rent HR $350 8ZSWSC Side Cast Street Sweeper HR OPC $79 8ZTR Riding Trencher HR $26 8ZVT Vacuum Truck HR $438 LABOR Foreman 4/M $100 Operator OP $95 Laborer LAB $75 Laborand Equipment Rates are fueled and maintained. Operators are list for addition to equipment rates for operated rate. Mobilizations are by t[ each. Markup on Extra Work Rates is 15% Page 5 of 5 City of Tigard April 9,2019 Kerr Contractors Oregon,Inc. Attn: Alan Alpin PO Box 1060 Woodburn, OR 97071 REF.: Public Works On-Call -General Construction Services and General Landscape Services Period:May 1, 2019 through April 30,2020 CONTRACT NOTICE OF AWARD -RENEWAL Contract# C180050 Dear Mr.Alpin The City of Tigard has determined that your company has performed in accordance with the requirements of our Agreement. Therefore, the City of Tigard, pursuant to the renewal/extension clause contained in the terms and conditions of the Agreement, desires to exercise its first (1) one- rear extension to the Contract effective from May 1, 2019 through April 30, 2020. This renewal period shall be governed by the specifications, pricing, and the terms and conditions set forth per the above referenced Contract. Please acknowledge acceptance of this renewal by signing this document in the space provided below and returning it to me within ten (10) days. You may keep a copy for your records. The City looks forward to doing business with Ken Contractors Oregon,Inc. Sincerely, Jamie Greenberg Purchasing Assistant 503-718-2492 jamie@tigard-or.gov I/We hereby acknowledge acceptance of this Contract renewal, and agree to be bound by all requirements,terms,andel conditions as set forth in the above referenced Contract. Company: "" Signed: Date:— -i d 1 -i Printed: AA-e,,�-t � - City of Tigard April 9,2019 Kerr Contractors Oregon,Inc. Attn: Alan Alpin PO Box 1060 Woodburn, OR 97071 REF.: Public Works On-Call -General Construction Services and General Landscape Services Period:May 1, 2019 through April 30,2020 CONTRACT NOTICE OF AWARD -RENEWAL Contract# C180050 Dear Mr.Alpin The City of Tigard has determined that your company has performed in accordance with the requirements of our Agreement. Therefore, the City of Tigard, pursuant to the renewal/extension clause contained in the terms and conditions of the Agreement, desires to exercise its first (1) one- rear extension to the Contract effective from May 1, 2019 through April 30, 2020. This renewal period shall be governed by the specifications, pricing, and the terms and conditions set forth per the above referenced Contract. Please acknowledge acceptance of this renewal by signing this document in the space provided below and returning it to me within ten (10) days. You may keep a copy for your records. The City looks forward to doing business with Ken Contractors Oregon,Inc. Sincerely, Jamie Greenberg Purchasing Assistant 503-718-2492 jamie@tigard-or.gov I/We hereby acknowledge acceptance of this Contract renewal, and agree to be bound by all requirements,terms,andel conditions as set forth in the above referenced Contract. Company: "" Signed: Date:— -i d 1 -i Printed: AA-e,,�-t � - CITY OF TIGARD,OREGON-CONTRACT SUMMARY FORM M-(2,-LA1 (THISFORMMusTAccomPANYEVERYCONTRACT) Contract Title: General Construction Services and General Landscape Services Numberk✓_ C�� Contractor: Kerr Contractors Oregon, Inc Contract Total: NTE 100K per project Contract Overview: General construction services including underground pipe utilities construction and repair,excavation construction and repair for sanitary/storm/water utilities, concrete services for traffic curb/sidewalk/ADA ramps. General landscape services including parks,trails,riparian and water duality facilities. Initial Risk Level: ❑ Extreme ❑ High ❑ Moderate ❑ Low Risk Reduction Steps: Risk Comments: Risk Signature: Contract Manager:John Goodrich Ext: 2609 Department: PW Type: ❑ Personal Svc ❑ Professional Svc ❑ Architectural Agr ® Public Imp ❑ General Svc ❑ Engineering Svc ❑ Other: Start Date: 5 1 18 End Date: 4/30/19 Quotes/Bids/Proposal: FIRM AmouNT/ScogE Kerr Contractors Oregon, Inc 97/100 Legacy Homes, Inc 89/100 C&B Construction,Excavation&LLC 88/100 Braun Construction&Design,LLC 96/100 Elting Northwest, Inc 97/100 GT Excavating,LLC 99/100 Account String: Fund-Division-Account Work Order—ActiviiX T=e Amount FY Do not encumber FY FY Anur�- LCRB Date: Department Comments: Department Signature: Purchasing Comments: Purchasing Signature: City Manager Comments: City Manager Signature: Aftet securing all requited approvals, forward original copy to the Contracting and Purchasing Office alongwith a completed Contract Checklist. Cfz-CbS(6 CITY OF TIGARD GENERAL SERVICES AGREEMENT Public Works On-Call General Construction Services and General Landscape Services THIS AGREEMENT made and entered into this 1" of May, 2018 by and between the City of Tigard, a municipal corporation of the State of Oregon, hereinafter called "City", and Kerr Contractors Oregon, Inc, hereinafter called"Contractor",collectively known as the"Parties." RECITALS WHEREAS,Contractor has submitted a bid or proposal to City to provide specific services;and WHEREAS,Contractor is in the business of providing specific services and is aware of the purposes for which City requires the services;and WHEREAS,City and Contractor wish to enter into a contract under which City shall purchase the services described in Contractor's bid or proposal; THEREFORE,The Parties agree as follows: 1. SERVICES TO BE PROVIDED Contractor agrees to provide services related to General Construction and General Landscape Services as detailed in Exhibit A—Scope of Services and by this reference made a part hereof. • General Construction Services o Underground Pipe Utilities Construction&Repair o Excavation Construction&Repair—Sanitary/Storm/Water Utilities o Concrete Services—Traffic Curb/Sidewalk/ADA Ramps • General Landscape Services o Parks,Trails,and Riparian o Water Quality Facilities 2. EFFECTIVE DATE AND DURATION Contractor shall initiate services upon receipt of City's notice to proceed,together with an executed copy of this Agreement. This Agreement shall become effective upon the date of execution and shall expire, unless otherwise terminated or extended,on April 30,2019. All services shall be completed prior to the expiration of this Agreement. The City and Contractor may agree to up to four(4) mutual one (1)year options.The total term of the contract may not exceed five(5)years. 3. PREVAILING WAGE RATES The provisions of ORS Chapters 279A and 279C and all other Oregon and Federal provisions pertaining to minimum salaries and wages are incorporated herein by reference as if fully set forth. The Contractor agrees that the workmen in each trade or occupation required for the work to be done pursuant to the contract, employed in the performance of the Contract, either by the Contractor or Subcontractor or other person doing or contracting to do any part of the work contemplated by the Contractor shall be paid not less than the prevailing, minimum hourly rate of wage specified by the Commissioner of the Bureau of Labor,and attached hereto. If this project is subject to both Federal Davis-Bacon Act requirement and State of Oregon Prevailing Wage Rate requirements,the Contractor must ensure that workers will be paid the higher of the applicable federal or state rate. If the Contractor fails to pay for labor or services,the City may pay for those labor and services and withhold these amounts from payments that are due the Contractor in accordance with ORS 279C.515 Contractor shall provide proof as requested to the City prior to the beginning of any of the work that the Contractor has filed a public works bond with a corporate surety in the amount of$30,000 with the Construction Contractors Board as required under Oregon PWR law. Contractor shall also require in every subcontract to this Agreement that the subcontractor file a public works bond with the Construction Contractors Board in the amount of$30,000 prior to starting work on this project unless otherwise exempt. 4. COMPENSATION City agrees to pay Contractor on a per task order basis consistent with the pricing details attached to this Agreement and further consistent with Oregon Prevailing Wage Rate Law for Public Improvement Contracts. All tasks issued under this Agreement shall be done via.a Purchase Order referencing all terms and conditions of this Agreement shall be in effect. At no time shall any task order exceed One Hundred Thousand and No/100 Dollars($100,000.00). Any payment made to the Contractor shall be based upon the following applicable terms: A. All charges must be in accordance with Exhibit C, "Charges/Rates for Services," and Oregon Prevailing Wage Rates when applicable. B. Payment will be made in installments based on Contractor's invoice, subject to the approval by the City, and not more frequently than monthly. Payment shall be made only for work actually completed as of the date of invoice. C. Payment by City shall release City from any further obligation for payment to Contractor, for services performed or expenses incurred as of the date of the invoice. Payment shall not be considered acceptance or approval of any work or waiver of any defects therein. D. Contractor shall make payments promptly, as due, to all persons supplying labor or materials for the prosecution of this work. E. Contractor shall not permit any lien or claim to be filed or prosecuted against the City on any account of any labor or material furnished. F. Contractor shall pay to the Department of Revenue all sums withheld from employees pursuant to ORS 316.167. G. If Contractor fails,neglects or refuses to make prompt payment of any claim for labor or services furnished to Contractor or a subcontractor by any person as such claim becomes due; City may pay such claim and charge the amount of the payment against funds due or to become due the Contractor. The payment of the claim in this manner shall not relieve Contractor or their surety from obligation with respect to any unpaid claims. H. Contractor shall pay employees at least time and a half pay for all overtime worked in excess of 40 hours in any one work week except for individuals under the contract who are excluded under ORS 653.010 to 653.261 or under 29 USC sections 201 to 209 from receiving overtime. I. Contractor shall promptly, as due, make payment to any person, co-partnership, association or corporation,furnishing medical,surgical,hospital care or other needed care and attention incident to sickness or injury to the employees of Contractor or all sums which Contractor agrees to pay for such services and all moneys and sums which Contractor collected or deducted from the wages of employees pursuant to any law, contract or agreement for the purpose of providing or paying for such service. J. The City certifies that sufficient funds are available and authorized for expenditure to finance costs of this contract during the current fiscal year. Appropriations for future fiscal years shall be subject to budget approval by the City Council. 5. ASSIGNMENTMELEGATION Neither parry shall assign or transfer any interest in or duty under this Agreement without the written consent of the other and any attempted assignment or transfer without the written consent of the other parry shall be invalid. 6. SUBMITTING BILLS AND MAKING PAYMENTS All notices and bills will be made in writing and may be given by personal delivery,mail or fax. Payments may be made by personal delivery,mail, or electronic transfer. The following addresses shall be used to transmit notices,bills,payments,and other information: Attn:John Goodrich Attn:Alan Alpin Address: 13125 SW Hall Blvd. Address: PO BOX 1060 Tigard, Oregon 97223 Woodburn OR 97071 Phone: (503) 718-2609 Phone: (971)216-0050 Email: johng@tigard-or.gov Email: estimatingkerrcontractors.com 7. TERMINATION The parties agree that any decision by either party to terminate this Agreement will be accompanied by thirty (30) days written notice to the other parry prior to the date termination would take effect. There shall be no penalty for early termination. If City terminates the contract pursuant to this paragraph,it shall pay Contractor for services rendered prorated to the date of termination. 8. ACCESS TO RECORDS City shall have access to such books, documents, papers and records of Contractor as are directly pertinent to this Agreement for the purpose of making audit,examination,excerpts and transcripts. 9. FORCE MWURE Neither City nor Contractor shall be considered in default because of any delays in completion and responsibilities hereunder due to causes beyond the control and without fault or negligence on the part of the parties so disenabled, including but not restricted to, natural disaster,war, civil unrest, volcano, earthquake, fire, flood, epidemic, quarantine restriction, area-wide strike, freight embargo, unusually severe weather or delay of subcontractor or supplies due to such cause; provided that the parties so disenabled shall within ten(10) days from the beginning of such delay,notify the other parry in writing of the cause of delay and its probable extent. Such notification shall not be the basis for a claim for additional compensation. Each party shall,however,make all reasonable efforts to remove or eliminate such a cause of delay or default and shall,upon cessation of the cause,diligently pursue performance of its obligation under the Agreement. 10. NON-DISCRIMINATION Contractor agrees to comply with all applicable requirements of federal and state civil rights and rehabilitation statues, rules, and regulations. Contractor also shall comply with the Americans with Disabilities Act of 1990,ORS 659A.142,and all regulations and administrative rules established pursuant to those laws. 11. INDEMNITY Contractor agrees to and shall defend,indemnify and hold harmless City, City's officers, employees, agents and representatives from and against all liability, claims,costs, demands,judgments,penalties, and causes of action of any kind or character,or other costs or expenses incidental to the investigation and defense thereof,of whatever nature,resulting from or arising out of the activities of the Contractor or its subcontractors,agents,or employees in performance of this contract,except,however,that the foregoing shall not apply to liability that arises out of the City's, its officers, employees, agents and representatives sole negligence. If any aspect of this indemnity shall be found to be illegal or invalid for any reason whatsoever, such illegality or invalidity shall not affect the remainder of this indemnification. 12. INSURANCE Contractor shall maintain insurance acceptable to City in full force and effect throughout the term of this contract. Such insurance shall cover risks arising directly or indirectly out of Contractor's activities or work hereunder. The policy or policies of insurance maintained by the Contractor shall provide at least the following limits and coverages: A. Commercial General Liability Insurance Contractor shall obtain,at contractor's expense,and keep in effect during the term of this contract, Comprehensive General Liability Insurance covering Bodily Injury and Property Damage on an "occurrence" form (CG 2010 1185 or equivalent). This coverage shall include Contractual Liability insurance for the indemnity provided under this contract. The following insurance will be carried: Coverage Limit General Aggregate 3,000,000 Products-Completed Operations Aggregate 2,000,000 Personal&Advertising Injury 1,000,000 Each Occurrence 2,000,000 Fire Damage (any one fire) 50,000 B. Commercial Automobile Insurance Contractor shall also obtain, at contractor's expense, and keep in effect during the term of the contract, Commercial Automobile Liability coverage including coverage for all owned, hired, and non-owned vehicles on an"occurrence"form.The Combined Single Limit per occurrence shall not be less than$2,000,000. If Contractor uses a personally-owned vehicle for business use under this contract, the Contractor shall obtain, at Contractor's expense, and keep in effect during the term of the contract, business automobile liability coverage for all owned vehicles on an"occurrence"form. The Combined Single Limit per occurrence shall not be less than$2,000,000. C. Workers' Compensation Insurance The contractor, its Subcontractors, if any, and all employers providing work, labor, or materials under this Contract that are subject employers under the Oregon Workers' Compensation Law shall comply with ORS 656.017,which requires them to provide workers'compensation coverage that satisfies Oregon law for all their subject workers. Out-of-state employers must provide Oregon workers' compensation coverage for their workers who work at a single location within Oregon for more than 30 days in a calendar year. Contractors who perform work without the assistance or labor of any employee need not obtain workers'compensation coverage. All non- exempt employers shall provide Employer's Liability Insurance with coverage limits of not less than$1,000,000 each accident. D. Additional Insured Provision All policies aforementioned, other than Workers' Compensation and Professional Liability, shall include the City its officers, employees, agents and representatives as additional insureds with respect to this contract. E. Insurance Carrier Rating Coverages provided by the Contractor must be underwritten by an insurance company deemed acceptable by the City. All policies of insurance must be written by companies having an A.M. Best rating of"A-VII" or better, or equivalent. The City reserves the right to reject all or any insurance carrier(s)with an unacceptable financial rating. F. Self-Insurance The City understands that some Contractors may self-insure for business risks and the City will consider whether such self-insurance is acceptable if it meets the minimum insurance requirements for the type of coverage required. If the Contractor is self-insured for commercial general liability or automobile liability insurance the Contractor must provide evidence of such self-insurance. The Contractor must provide a Certificate of Insurance showing evidence of the coverage amounts on a form acceptable to the City. The City reserves the right in its sole discretion to determine whether self-insurance is adequate. G. Certificates of Insurance As evidence of the insurance coverage required by the contract, the Contractor shall furnish a Certificate of Insurance to the City. No contract shall be effective until the required Certificates of Insurance have been received and approved by the City. The certificate will specify and document all provisions within this contract and include a copy of Additional Insured Endorsement. A renewal certificate will be sent to the below address prior to coverage expiration. H. Independent Contractor Status The service or services to be rendered under this contract are those of an independent contractor. Contractor is not an officer,employee or agent of the City as those terms are used in ORS 30.265. I. Primary Coverage Clarification The parties agree that Contractor's coverage shall be primary to the extent permitted by law. The parties further agree that other insurance maintained by the City is excess and not contributory insurance with the insurance required in this section. .i. Cross-Liability Clause A cross-liability clause or separation of insureds clause will be included in all general liability, professional liability,pollution and errors and omissions policies required by this contract. A certificate in form satisfactory to the City certifying to the issuance of such insurance will be forwarded to: City of Tigard Attn: Contracts and Purchasing Office 13125 SW Hall Blvd. Tigard,Oregon 97223 At the discretion of the City,a copy of each insurance policy,certified as a true copy by an authorized representative of the issuing insurance company may be required to be forwarded to the above address. Such policies or certificates must be delivered prior to commencement of the work. The procuring of such required insurance shall not be construed to limit contractor's liability hereunder. Notwithstanding said insurance, Contractor shall be obligated for the total amount of any damage, injury, or loss caused by negligence or neglect connected with this contract 12. ATTORNEY'S FEES In case suit or action is instituted to enforce the provisions of this contract, the parties agree that the losing party shall pay such sum as the court may adjudge reasonable attorney fees and court costs, including witness fees (expert and non-expert),attorney's fees and court costs on appeal. 13. COMPLIANCE WITH STATE AND FEDERAL LAWS/RULES Contractor shall comply with all applicable federal, state and local laws, rules and regulations, including, but not limited to, the requirements concerning working hours, overtime, medical care, workers compensation insurance, health care payments, payments to employees and subcontractors and income tax withholding contained in ORS Chapters 279A, 279B, and 279C, the provisions of which are hereby made a part of this agreement. 14. CITY OF TIGARD BUSINESS LICENSE Contractor shall obtain,prior to the execution of any performance under this Agreement,a City of Tigard Business License. The Tigard Business License is based on a calendar year with a December 31st expiration date. New businesses operating in Tigard after June 30th of the current year will pay a pro- rated fee though the end of the calendar year. 15. CONFLICT BETWEEN TERMS It is further expressly agreed by and between the parties hereto that should there be any conflict between the terms of this instrument in the proposal of the contract,this instrument shall control and nothing herein shall be considered as an acceptance of the terms of proposal conflicting herewith. 16. SEVERABILITY In the event any provision or portion of this Agreement is held to be unenforceable or invalid by any court of competent jurisdiction,the validity of the remaining terms and provisions shall not be affected to the extent that it did not materially affect the intent of the parties when they entered into the agreement. 17. COMPLETE AGREEMENT This Agreement,including the exhibits,is intended both as a final expression of the Agreement between the Parties and as a complete and exclusive statement of the terms. In the event of an inconsistency between a provision in the main body of the Agreement and a provision in the Exhibits,the provision in the main body of the Agreement shall control. In the event of an inconsistency between Exhibit A and Exhibit B,Exhibit A shall control. No waiver, consent, modification, or change of terms of this Agreement shall bind either party unless in writing and signed by both parties. Such waiver, consent,modification,or change if made, shall be effective only in specific instances and for the specific purpose given. There are no understandings, agreements, or representations, oral or written, not specified herein regarding this Agreement. Contractor,by the signature of its authorized representative,hereby acknowledges that he/she has read this Agreement,understands it and agrees to be bound by its terms and conditions. IN WITNESS WHEREOF,City has caused this Agreement to be executed by its duly authorized undersigned officer and Contractor has executed this Agreement on the date hereinabove first written. Awarded by Tigard's Local Contract Review Board at their April 24,2018 meeting. CITY OF TIGARD KERR CONTRACTORS OREGON,INC By:Authorized Cfy Representative By:Authorized Contractor Representative At-A,,j W . tom nl s � / �J 5I ,qI I � Date Date Contractors Proposal SECTION 7 STATEMENT CERTIFICATIONS Non-discrimination Clause The Submitting Firm agrees not to discriminate against any client,employee or applicant for employment or for services,because of race,color,religion,sex,national origin,handicap or age with regard to,but not limited to,the following.employment upgrading,demotion or transfer;recruitment or recruitment advertising;layoffs or termination,rates of pay or other forms of compensation; selection for training,rendition of services. It is further understood that any contractor who is in violation of this clause shall be barred from receiving awards of any purchase order from the City,unless a satisfactory showing is made that discriminatory practices have terminated and that a recurrence of such /acts _is unlikely. Agreed by. / i.- Pry-� �1.i 'L c- 4 Firm N ame: W- Z�LSZ.� Y� --tt. �'j C'. Address: Resident Certificate Please Check One: Gia Residen Vendor:Vendor has paid unemployment taxes and income taxes in this state during the last twelve calendar months immediately preceding the submission of this statement packet. Or ❑ Non-resident Vendor:Vendor does not qualify under requirement stated above. (Please specify your state of residence: Officer's signature: Type or print officer's name: a 1~.E ;A-V t,..a r--j RFP—On-Call Public Works Construction Services Page 13 Close—Thursday,December 7,2017 SECTION 8 SIGNATURE PAGE The undersigned proposes to perform all work as listed in the Specification section, for the price(s) stated; and that all articles supplied under any resultant contract will conform to the specifications herein, The undersigned agrees to be bound by all applicable laws and regulations,the accompanying specifications and by City policies and regulations. The undersigned,by submitting a statement,represents that: A) The firm has read and understands the specifications. B) Failure to comply with the specifications or any terms of the Request for Qualifications may disqualify the firm. The undersigned certifies that the statement has been arrived at independently and has been submitted without any collusion designed to limit competition. The undersigned certifies that all addenda to the specifications has been received and duly considered and that all costs associated with all addenda have been included in this statement: Addenda: No. *-j )& through No. lj j A inclusive. We therefore offer and make and submit this statement packet to furnish services indicated herein in fulfillment of the attached requirements and specifications of the City. Name of firm: Address: 0• -FD\VC V\J00T1>f2j oft- C1-1 Telephone Number: G 0.92 Fax Number: % By: Date: _ (Signature of Authorized .) ,,Official. If partnership,signature of one partner Typed Name/Title: �'C'l-AX14 5V-Z' T N � 'c— ---- . If corporation,attest: -" (Corporate Officer) Corporation ❑Partnership ❑Individual Federal Tax Identification Number(M,�: 61 Q RFP—On-Call Public Works Construction Services Page 14 Close—Thursday,December 7,2017 ATTACHMENT A CITY OF TIGARD,OREGON ACKNOWLEDGMENT OF ADDENDA Project Title: On-Call Public Works Construction Services Close: Thursday,December 7.2017-2:0012.m. IME HAVE RECEIVED THE FOLLOWING 3DDENDA(If neve received.write `None Received'): 1. 3. 2. 4. Date Signature of Proposer c # Title V--t::. Corporate Name RFP—On-Call Public Works Construction Services Page 15 Close—Thursday,December 7,2017 ATTACHMENT B CITY OF TIGARD,OREGON STATEMENT OF PROPOSAL,�a,�, Name of Consultant: �- Mailing Address:_ (( 1�tit1 C✓►✓ -�'�Z.fes.} r� C l k`� Contact Person: kL,,A .3 A t.-( Telephone: q-7 005C) Fax: f l.LEmail:G S4,&o"C9 4Z c r accepts all the terms and conditions contained in the City of Tigard's Request for(qualifications for On-Call Public Works Construction Services and the attached General Services_'Agreement(Attachment C): 12-J-7 -j Signature of authorized representative Date Type or print name of authorized representative Telephone Number __ A-L- W . t_ t ri 9'1 t. Z_t(0 . 0 _ Type or print name of person(s) authorized to negotiate contracts Telephone Number REFERENCES Reference#1 Telephone Number Project Title Contact Individual Reference#2 Telephone Number Project Title Contact Individual Reference#3 Telephone Number Project Title Contact Individual RFP-On-Call Public Works Construction Services page 16 Close-Thursday,December 7,2017 APPLICANT EXPERIENCE QUESTIONAIRRE rusoan _Pro ect Identification 3A 39 30 3E 3F 36 3H '` �` 3H E Project Name pro; Reed's Crossing Reads Crossing PLW 1 i Adams County McMinnville - US26:(MP72A-US26:Cornelius Jackson School Cornelius Pass-Blanton West PipeLne Line to Spokane Municipal Airport M P84,89) Pass Road- RoadlMeek Construction County Line- Runway 4-22 Paving Project N.W.185th Road/Scotch Paving Rehab Project Avenue Church Road Roundabout Newland Newland Willamette. Washington <"'CKyof . Oregon Oregon ommunItlss Corrinuin-M a Waterau tngton , ppfy Departmerrt of IIileMtrimrllle Depertrnent of DepartpartmsM of CCounty .:s- Trane rtetitm Po 1'Transportation Transportation Address 18701 S.E. 16701 S.E. 1500 N.W. 310 Maple Park 231 Northeast 3313 Bret 6000 S.W.Raab 1400 S.W. McGrTivmy Blvd, McGillivray Blvd, Bethany Blvd. Ave Fifth Street Clodfater Way Raod Walnut Street, Suite 150 Suite 150 MS-1a Cl Vancouver Vancouver Beaverton Olympia McMinnville The Dalles Portland Hillsboro A WA OR WA OR OR OR OR 8863 98683 97006 98504 97128 97058 97221 97123 Phone 360.254.0544 360.254.0544 503.941.4567 (509)324.6250 (503)434-7312 541.980.4978 971.673.5228 503.846.7828 First Name Jessie Jessie Skip Chad Rich Shane Ron Bill Last Name Lovdan Lovrien Henkel Simonson Spofford Johnson Larson Hunter Pro Infonrretlon Prime Prime Prime" Prime Prime Prime Prime Prime P se Status Ongoing Ongoing Ongoing Ongoing Ongoing Ongoing Ongoing Ongoing Estimator OC OC ST BG BB BB ST BB P Manager KC KC KC KM JJ JA DF KC KCI Job Number 2170140 2170130 2160410 2160400 2160320 2160300 2160280 2160270 Class of Project Street Street Waterline Asphalt Paving Airport Asphalt Paving Highway Street Construction Construction Construction Construction - B WDOT Class 1,4,6,9,12, 1,4,5,9;12, 1,16,21,30, 2,4,1$27,30, 1,4,12,15,16, 4,53,87 1,4,5,6,9,11, 1,4,ti,9,12, 16,16,17,24, 18,18,17,24, 34,53,67 63,67 17,24,27,30, 12,15,16,17, 15,16,17,24, 27.30 31,32, 27,30,31,32, 32,34,38,6.1, 21,24,27,SO, 27,911,31,32, 34,38,4 57 34,38,53,57 til 31.32,34,38, 34,38,83,87 45,457 -- Is"of Prolect ODO x x x x x CP x x x x x x x REIN x EART x x x x x x x ELEC x x x x x LS x x x x x MHA PAVE x x x x x x - PCP x AC x SIGN x x x x x x TTC x x x x x x x x A net Contract Amount $3,762,989 $6,836,300 $3,516.630 $9,721,681 $6,649,520 $5761000 $26,456,956 $3,260,101 Final Contract Amount $3,762,989 $8,636,300 $3,516,630 $9,721,681 $6,649,620 $597,354 $28,456,956 $3,250,101 Contract Format(UIP or LS) UIP U/P UIP UIP U/P UIP UIP UIP rt Date 7/5/2017 7/5/2017 5/112017 4/15/2017 5/1/2017 9/15/2016 1111/2016 9/2372016 C om let on Data 5/31!2018 5/3112018 9/30/2017 9130/2017 10/30/2017 9/30/2016 9/30/2018 7/15/2017 City Hillsboro Hillsboro Hillsboro Sprague McMinnville Wasco County Hillsboro Hillsboro State OR OR OR WA OR OR OR OR Suro Comgny if Bonded Liberty Mutual Liberty Mutual Libe Mutual Lib Mutual Uberty Mutual Liberty Mutual Liberty Mutual fLiberty Mutual Name McKay Sposito McKay Spoelto Kennedy Jenks Washington Century West Oregon Oregon Washington Consultants Department of Engineering Department of Deparhnent of County Transportation Corporation Transportation Transportation Address 1325 S.E.Tech 1325 S.E.Tech 421 S.W.6th 1310 Maple Park 5331 SW 3313 Bret 6000 S.W.Raab 1400 S.W. Center Drive, Center Drive, Avenue Ave Macadam Clodfelrer Way Read Walnut Street, Suite 140 Suite 140 Avenue,9207 MS-111 CityRH uver Vancouver Portland Olympia Portland The Dallas Portland Hillsboro State WA OR WA OR OR OR OR Zip 98653 97204 98504 97239 97058 97221 97123 Phone5.3411 360.695.3411 503.423.4000 509.324-6250 503.419-2130 541.960.4978 971.673.5228 503.846.7826 First Name Heath Ed Chad Bryan Shane Ron Bib Last Namee Meliotte Bemhurst Simonson Condon Johnson Larson Hunter 1 or33 APPLICANT EXPERIENCE QUESTIONAIRRE WsDcrColumn r Proectldentlfleation 31 W 4A 45 AC -40' '' 4E'� - - E Project Name :.. Reads Crossing,S.W,124th Up N W - 1.64_Jordan . ' PDX Alr Cargo Verbort-Pumkw S.E Tolbert - N.W Brookwood -Off-alta . Extension 3 McNamee Road Road•. :,, Road Highway47 (Street Waterline Parkway r. Improvements Waterline -NW Bridge Multnomah Falls Rehabilitation Watetine Relocation improvements ;.. Transmission Avenue Ww,, Section Re locatien w, Line F NameNewland Washington Oregon Ion, Port of Tualagn Valley':.Claeka8na , yYaehlnytorY; C-ii"]ttea.'_Calmly 4�t LaidorrDapirnsntof Department ad Irrijigif6a RWryYatar Uwi Teargpertedon TraneportakmDjefilet T tatlCUney rrfylrrW': b x.: TransporMtlat - dross 16701 SE 1400 S.W. 3700 S.E.92nd 999 Frontage 8155 N.E.Air 2330 Elm St 18770 SE a2nd 1400 S.W. McGillivray Walnut Street, Avenue Road,Suite 280 Cargo Road Dr.,9100 Walnut Street, Blvd,STE 150 MS-1a MS-18 ancover Hillsboro Portland Troutdale Portland Forest Grove Clackamas Hillsboro State WA OR OR OR OR OR OR OR Zip98683 97123 97266 97060 97218 97116 97015 97123 one (350)2540933 503.846.7808 503-731.3142 503.616.6766 503.415.6702 503.357.3118 503.722.9220 503.846.7829 First Name Jesse Renus Merge Mark Glen Joe Adan Matt Last Name Lovrien Kelfkens West Beeson Moe Rutledge Bjomstedt Maisr D P IrrformaGon Prime Prams Prime Prime Prime Prime Prime Prams P Status Ongoing Ongoing Complete Complete Complete Complete Complete Com k to Estimator Be BB ST BB as BB BB BB P -Mane or KC _ ..__ .$K- JA JA'- - pF-.. KC- SK KC Class sob Number 2180190 2150450 2160150 2160070 2160030 2150360 2150210 2150200 lass of Project Highway Street Asphalt Paving Asphalt Paving Airport,Asphalt Waterline Wateriine Street Construction Construction, Paving Construction Waterline BWDOTClass , 1,4,6,9,12, 1,4 9,11,12, 2,4,12,17,19, 2,4,12,17,53, 4,8,12,13,17, 4,31,63.67 - 4,31,53,67 1,4,8,11,12; „ IS,IS,17,21, 1$,15,.17,20,. 53,57 67 *:; `25.46'"67 16,16,17,2q r 24,27,30,31, 24,27,31.32, 32,34,38,$3. 34,3C,33,57 u'38'33'37 ` 67 34;38,53.57 ----- lass of ODO x x x x CP x x x x x x REIN x x x EART x x x x x ELEC x x x x LS X X MHA x z PAVE x xx PCP PC x SIGN x x x x x x x x C x x x x x x x x A trial Amount $6,792,183 $33,176,916 $4,786,279 $9.207,741 $571,950 $297,366 $312,412 -$13,088.093 Final Contract Amount $6,792,183 $33,176,916 $4,867,138 $9,091,489 $597,354 $333,851 $314,002 $13,219,663 Contract Format(UIP or LS) U/P UIP U/P UIP U/P LIP U/P U/P Start Date 8/25/2016 3/1/2016 7/5/2016 6113=161 7/11/2018 12/1/2015 7/1512015 8/1/2015 C om latlon Date 10/9/2017 12/3112018 10/30/2016 10/30/2016 10130/2018 2/15/2016 8/31/2015 ' 12/31/2016 Ity Hillsboro Hillsboro Portland Multnomah Portland Forest Grove Clackamas Hillsboro County County State OR OR OR OR OR OR OR OR Su Coma if Bonded Ube Mutual Uberty Mutual Uberty Mutual Liberty Mutual Liberty Mutual lUberty Mutual I Liberty Mutual-I-Libertv Mutual Name Parsons Washington Oregon Oregon Port of Murray Smith 6 Clackamas Washington Brinkerhoff County Land Departmsrrt of Department of Portland Associates, River Water County Land Use& Transportation Tranaportatlon Inc. Use A Transportation Transportation Address 851 SW 6th Ave 1400 S.W. 3700 S.E.92nd 999 Frontage 8155 N.E.Air 121 S.W. 16770 SE 82nd 1400 S.W. 600, Walnut Street, Avenue Road,Suite 280 Cargo Road Salmon,Suite Drive,9100 Walnut Street, MS-18 900,Suite. MS-18 Ci Portland Hillsboro Portland ITroutdale Portland Portland Clackamas Hillsboro State OR OR OR OR OR OR OR OR Z 97204 97123 97266 97060 97218 97204 97015 97123 Phone 503.274-8772 503.846.7808 503.731.3142 503.818.8766 503.415.6702 503.225.9010 503.722.9220 503.846.7829 First Name Janien Renus Marge Mark Glen Brendan Adam mat Leet Name Roche I KeBkens West Beeson IMOO O'Sullivan 18jornstilidt Meier 2 of 33 APPLICANT EXPERIENCE QUESTIONAIRRE wsoar c-n Proect Identification 4G' 4G 41H 4L ';41 ..` 4J :.:.:w',";.4N E Project Nema South Cooler N.W.253rd N.W.Groveland N.W.Comelius US97:Madlss OR99W. 1-5 Kuebler 184 Nelson r Mountain High Avenue Road Pass Road to Mora Gaerde/ Interchange- Polrlt-Lime ... ,.. School McDonald SB Ram Mine Clearing Cross mp nor h*M800 F ams Hofhttert City of ; Washington •., Washington ,l>,, $ton . Oregon City of Tigard .Oregon Oregon Construction Hillsboro County Land 'County Land= Department of WSW 4' Department of Department of Use& Use a Transportation Deparlon end a Transportation Transportation Transportation Transportstion ddrea 805 S.W. 150 E.Main 1400 S.W. 1400 S.W. 3313 Bret 13126 S.W.Hal 455 Airport 1390 SE 1st Ave Broadway,Suite Street Walnut Street, Walnut Street. Clodfelter Way Blvd. Road,Building 100 MS-18 MS-18 S.E.,Building Q Cft Portland HillsboroHillsboro Hillsboro The Dales Tigard Salem Ontario state OR OR OR OR OR OR OR OR Zip 97205 97123 97123 97123 97058 97223 97301 97914 Phone 503221.8811 503.661.6252 503.846.7936 503.846.7921 541.296.2800 503.839.4171 541.623.4021 First Name Cade Charlie Charlie Zach Robert Mike Shan Doug Leat Name Lawrence Shell Steams Morris Townsend McCarthy Heem Johnson _ D Pro Information Sub Prime Prime Prime Prima Prime Prime Prime Pro Stehle Complete Complete Com complete Complete Complete Com Complete Estimator QC ST Be Be BB ST QC Be Pr 'act Manager JH KC KC KC BP OF BK BP KCI Job Number 215D18 2150170 2150130 2150110 215007D 215DO40 2140470 2140450 Class of Project Site,Street Strut Street Street Highway Waterline Clearing Asphalt Paving Construction Construction Construction Construction Construction& Asphalt Paving BWDOT Class ^ki, 1,4,6,13,16, 1,4,5,15,15, 1,4.12,15,20, 1,4,9,11,12, 1,2,4,12,14, 46 31,53,57 1,34,63,67 2,4,12,17,53, 16,17,20,27, ` 16,17,20,27, 34,63.57 15,16,17,20, 16,27,30,34, 67 32,34,63,57 32,34,63,57 24,27,31,32, 63,57 34,38,63,67 Class of P 'ect ODO AB x x x x x CP x x x x x x REIN x x x x FART x x x x x x x ELEC x x x x LS x x x x x MHA x x x x x PAYE x PCP x x x AC x x SIGN x x x x x x x TTC x x x x x x x x A Oro inalContractAmount $16,614,825 $3,661,188 $1,653,580 $10,992,710 $9,902,700 $237,895 $238,135 $6,795,649 Final Contract Amount $21,974,743 $4,040,548 $1,747,408 $10,886,720 9713=018 $276,938 $262,275 $6,441,601 Contract Format(UIP or LS) LS U/P U/P U/P UIP U/P U/P Start Date 7/15/2015 7/15/2015 7/1/2015 7/112015 3/15/2015 9/1/2014 6/1/2015 C $ban Data 9/31/17 12/31/2016 11/30/2015 12131/2016 7/1/2D15 12/1/2014 10/16/2015 tiY Tigard Hillsboro Hillsboro Hillsboro WTigard Salem Baker City OR OR OR OR OR OR OR JOR kSUr-ICom If Sande None I Liberty Mutual Liberty Mutual ILJberty Mutual I Libel Mutual I Liberty Mutual 1-lb Mutual I Liberty Mutual Name Harper Haut Mackenale Washington Washington Oregon City of Tigard Oregon Oregon Paterson County Land County Land Department of Water Department of Department of Righellis Use& Use& Transportagon Department Transportation Transportatlon Transportation Transportation Address 205 S.E.Spokane 1515 S.E.Water 1400 S.W. 1400 S.W. 3313 Bret 113125 S.W.Hal 455 Airport 1390 SE 1st Ave Street Suite 200 Avenue,Suite Walnut Street, Walnut Street, Ckxfielter Way Blvd. Road,Building 100 ll MS-18 S.E.,Building Q C Portland Portland Hillsboro Hillsboro The Dales Tigard Salem Ontario SLate OR OR OR OR OR OR OR OR P 7202 97214 97123 97123 97058 97223 97301 97914 Phone 503.221.1131 503.224.9560 503.846.7936 503.846.7921 541.298.2800 503.839.4171 541.7607.187 641.823.4021 First Name analle Ralph J.R. Charlie Zach Robert Mike Shan Doug Last Name Brannan I Henderson ISteans Moms TownsendMcCarthy Heem jJohnson 30133 APPLICANT EXPERIENCE QUEST 0MAIRRE w8e0T cwm- Proect Identification 40 _ :4P 4Q4R - 4S 4T s 41 '. EProject Name OR218 Muting, Schotls Ferry.J!. North 11th Highway 99W Kerr Parkway 72nd Avenue! Derry Dag OR99W:S.W t 5 a ;- Road- a ,..:Road Sanitaer ry.. Avenue CDBG Median Rehabilitation Dartmouth Sanitary Sew , Durham to S.W. ;-. Blackmans.e:ti Sewer Extension Stormwater Sbeet CuMert,.Raid A Flacfwr Road Comer Y�: I Quality Facilities intersection Street IAN sx: improve �.F --v Orsgin CNy of ,x CRY of Cleanwatar City of Laky CM of 7i9ard Clprreester Oregon Dspan3nmsnt#_BsaysrtoiF « Corttslite Services $erdces TrrnipoAalfon: Department of Transportation k' dress 3700 BE 92nd PO Box 4756 11355 N.Barlow 2550 S.W. 380 A Avenue 13125 S.W.Hell 2550 S.W. 3700 BE 92nd ve Street Hillsboro Hwy Blvd. Hillsboro Hwy Ave C Portland Beaverton Comelius Hillsboro Lake Oswego Tigard Hillsboro Portland State OR OR OR OROR OR OR OR p 97266 97076 97113 97122 97035 97223 97122 97266 one 503.731.4343 503.526.2115 503.357.3011 503.681.36na 503.635.0270 503.639.4171 503.681.3600 503.731.3197 First Name Marjorie JAndrew Kevin Richard Crystal Joe Duke Wayne Last Name West Barrett Oppenlander Boyle,P.E. Shum Barrett Tran Stater 4 D J P Information Prime. Prime Prime Prima I Prime Prime Prime Prime P status Com ate Com Complete Complete Complete Complete Com Complete Estimator BB QC ST BB QC QC QC BB Pro'ad Ma BP KC - KC _._..-- ..__...__. _..JR _..._ JJ.. KC JJ KCI Job Number 2140440 2140250 2140240 2140230 2140190 2140180 2140170 2140110 Class of Project Asphalt Paving Waterline Street Utilities: Street Street Street Highway Construction Stormwater Construction Construction Construction 8 Construction Utilities: B WDOT Class 4,12,17,63,67 16,94,6S,67 1,4,12,16,17, 1,15,32,34, 1,4,5,9,12,„ 1,4,5,8,12," 1,4,6,12,15, 1,4,9,11,12, 31,32,34.53, 53,57 15,15,17,211, 15,18,17;29, 30,32,34,63, 13,115,16,17, 87 27,31.39,3,1, 27,31,32,34, 57 30,31,32,34, 53,57 63,67 53,57 -- Class of Project ODO B x x x x x ACP x x x x, x x REIN x x EART x x x x x x x ELEG x x x x LS x x x x x MHA PAVE P x C IGN x x x x x x x x C x x x x x x x x A ON InalContractAmount $1,421,655 $994,700 $130,930 $305580 $3,009,977 51,566,356 $t,596,128 $1;31,7,53B Final Contract Amount $1,207,059 $859,203 $176,958 $293,526 $3,332,102 $1,630,725 $1,741,427 $1,281,037 Contract Format(UIP or LSI U/P U/P UIP U/P U/P U/P UIP UIP Start Date 4/1/2015 8/1/2014 811/2014 61112014 311/2014 6/1/2014 6/1/2014 6/1/2014 C Comelation Date 6/30/2015 12/1/2014 10/30/2014 9/30/2014 3/1/2015 11/1512014 . 10MI2014 9/3012014 City Molatla Beaverton Cornelius Tigard Lake Oswego Tigard Tigard Tigard State OR OR OR IOR OR OR OR OR u Com n If Bonded Liberty Mutual Ube tual L Muib Mutual Liberty Mutual Liberty Mutual Ltbe Mutual 11-iberty Mutual Uberty Mutual Name Oregon City of City of Cleanwater City of Lake City of Tigard Cleanwater Oregon Department of Beaverton Corellus Services Oswego Services Department of Transportation Transportation Address 3700 BE 92nd PO Box 4755 1355 N.Barkin 2550 S.W. 380 A Avenue 13125 S-W_Hall 2550 S.W. 3700 BE 92nd Ave Street Hillsboro Hwy Blvd. Hillsboro Hwy Ave Cl Portland Beaverton Cornelius lHiMstiorc, Lake Oswego Tigard Hillsboro Portland OR OR OR OR OR OR OR OR 97266 97076 97113 97122 97035 97223 97122 07266 Phone 503.731.4343, 503.526.2446 503.357.3011 503.681.3600 503.635.0270 503.639.4171 503.681.3800 503.731.3197 irst Name Marjorie Andrew Kevin Richard Crystal Joe Duke Wayne Lest Name West Barrett Oppenlander Boyle,P.E. IShurn Banett Tran Statler 4 of 33 APPLICANT EXPERIENCE QUESTIONAIRRE wsooT Vcowmn_ Pro ect Identlflcaiion 4W 4X 4Y 4Z 4AA 4AS 4AC 4AD E Project Name PIA Terminal OR99W:OR240 RK:MIM OR99W:1-5 NB S.W.Roy Boeckman Road Glenwood S.W.Schols Roadway (Newberg)- Huntington to Ramps Rogers Reconstruction Highway Ferry Road Rehabilitation OR 18(Dundee) Farewell Bond Road/S.W. Improvements, (S.W.Roy Pacific Highway Scholls Ferry CRP 322 d 324 Rogers to S.W, Road intersection Teal Blvd.) - F Name Port of Oregon Oregon Oregon Washington City of ..;, IMMM Washington Portland Department of Department of Department of County Land Wilsonville Counyr County Land Transportation Transportation Transportation Use 6 Use 8 Transportation Transportation Address 8166 N.E.Air 5681 SW Arctic 1390 SE 1st Ave 999 Frontage 1400 S.W. 29799 S.W. 229 West Main 1400 S.W. Cargo Road Drive Road,Suite 280 Walnut Street Towncenter Street Walnut Street MS-18 Loop East MS-18 C Portend Beaverton Ontario E197060 le Hillsboro Wilsonville Goldendale Hillsboro State OR OR OR OR OR WA OR Zip 97218 97005 97914 97123 97070 98620 97123 ne500.799.3520 503.641.8723 541.823.4021 .6766 503.846.7859 503.682.4960 508.773.2371 503.846.7859 t Nacre Glen Ron Doug Dan pee Sit Ahe Name Moe Larson Johnson Erpenbach Staton Randall Turkd D Pr act Information Prime Prime Prime Prime Prime Prime Prime Prime P 'set Status Complete Complete Complete Complete Complete Complete Co krts Complete Estimator BB BB BB BB ST BB BB BB ProsctMan er DF BP BA JJ KG TJK RP KC KCI Job Number 2140080 2140050 2140030 2130300 2130290 2130190 2130180 2130170 Class of Project Airport Asphalt Asphalt Paving Concrete Paving Highway Road Road Asphalt Paving Road Paving Construction Construction, Construction Bridge B WDOT Class 4,5,12,13,17, 2,4,12,63,67 5,12,13,34, 1,2,4,27,30, 1,4,6,9,11, 1,4,b,S.16, 4,12,53,57 1,4,6,9,11, 25,46,63,57 63,57 34,53,67 12,15,16,17, 16,17,27,30, 12,16,16,17, 24,27,31,32, 31,34,39,63, 24,27,31,32, 34,38,63,57 57 34,39,63,57 Class of Pro ect ODO AB x x x x x x ACP x x x x x x x REIN x x x x FART x x x x x EIEC x x x x x LS x x x x P AVE x x x x IGN x x x It x x x x TTC x x x x x x x x A Ori anal Contract Amount $2,061,687 $3,948,052 $825,500 $1,396,811 $1,563,450 $1,183,870 $1,709,381 $8,381,737 Final Contract Amount $2,975,641 $4,445,229 $652,606 $1,498,114 $1,442,030 $1,231,883 $1,808,844 $7,690,251 Contract Format(LYP or LS) UIP WP U/P U/P UIP UIP U/P UIP Start Data 5/1/2014 4/1/2014 6/1/2015 1/16!2014 3/1/2014 8/1/2013 9/2412013 9/1/2013 C Com letlon Date 10/31/2014 9/30/2014 9/30/2014 8129=14 7/30/2014 112712013 10/21/2013 11/15/2014 City Portland Newberg Farewell Bend Portland Washington Wilsonville Klickliat County Beaverton County State OR OR OR OR OR OR WA OR SuEeN Com n if Bonded Liberty Mutual I Liberty Mutual I Liberty Mutual Liberty Mutual Liberty Mutual Libe Mutual Liberty Mutual Libe Mutual Name Port of Oregon Oregon Oregon Washington Otak,Inc. KBckitat Washington Portland Department of Department of Department of County Land County County Land Transportation Transportation Transportation Use 3 Use& Transportation Transportation Address 8155 N.E-Air 5681 SW Arctic 1390 SE let Ave 999 Frontage 1400 S.W. 808 SW Third 228 West Main 1400 S.W. Cargo Road Drive Road,Suite 280 Walnut Street Avenue,Suite Street Walnut Street, MS-18 300 MS-18 City Portland Beaverton Ontario Troutdale Hillsboro Portland Goldendale Hillsboro StatEEOR OR OR OR OR OR WA OR P 97218 97005 97914 97060 97123 98204 98620 97123 Phone 503.799.3520 503.641.8723 541.823.4021 503.618.6766 503.846.7859 503.267.8825 509.773.2371 503.846.7859 First Name Glen Ron Doug Mark Dan Richard Scott Abe Last Name MoeLarson Johnson Beeson Erpenbach Darland lRandall ITurid 5of33 EXHIBIT A CONTRACTOR SUMMARY FORM PROPOSING ON(Mark"X"in box provided Underground Pipe Utilities Construction&Repair Excavation Construction&Repair—Sanitary/Storm/Fater Utilities Ego Concrete Services—Traffic Curb/Sidewalk/ADA Ramps General Construction—Street Paving/Sidewalks/ADA Ramps General Landscaping—City Parks,Trails,Nature Areas ❑ Electrical Services—Traffic Signal/Street Lighting ❑ Electrical Services—Pumps,Motors,Controls,PLC ❑ Mechanical Services—Pumps,Valves,Process Controls ❑ General Constructio`n�—Other G— ❑ Contractor Name: Y- n,L- `'f.-g7l-4 i kC- 4�J el Date of Incorporation: —1 7 ,01 L) State of Incorporation: 0A_ #of Years in Business: `- Oregon Contractor's License#: Other or Former Names under which your organization operates or has operated: Names of Principal(s)and Title(s): ( -4 i'l 1 Location of office that will provide services to the City pct, FINANCIAL STATUS AND CLAIMS Has the applicant,or any affiliate,ever been the subject of any of the following actions(any"Yes"answer will result in disqualification): Debarment under ORS 279C.860 Yes ❑ No [ Other action which resembles debarment Yes ❑ No During the past seven years,has the company ever filed for protection under the Federal bankruptcy laws?If yes, provide details on a separate sheet: RFP—On-Call Public Works Construction Services Page 24 Close—Thursday,December 7,2017 BONDING Please provide a letter from the Surety with the following information: • Surety company's bond rating • Submitting Company's name • Submitting Company's address '���~7� • Submitting Company's aggregate work capacity • Submitting Company's single limit • Bonding company's representative's contact inforrnation TYPE OF WORKABILITIES(check @WW a -•` ��,,., Description of Work Experience ;k' s Mark Mark-"K" Contractor, Subcontractor General Questions Worked on site at a water or wastewater treatment facility X' Worked on site at a water or wastewater pumping station 7c Worked on site at a water stotage reservoir or tank x Worked on sanitary,storm water,water pipe and appurtenances_ Worked on stream or creek beds,embankments,ri an=areas Performed On-call construction services for other cities,agencies Excavation Construction&Repair—Sanitary/Storm/Water Utilities Excavation,trenching,shoring,import fill,compaction,debris removal Repair/replace/install Underground Utilities (to include water, sanitary,storm water,manholes,catch basins,other appurtenances) Maintain proper back-fill materials&compaction rates as conditions oncrete Services—Traffic Curb/Sidewalk/ADA Ramps Concrete removal and site preparation Concrete forms for curb,sidewalk or ADA rams Concrete finishing to traffic industry standards .)C Porous Concreteplacement,finishing General Construction—Street Paying/Sidewalks/ADA Ramps Asphalt repair,resealing, outs, din pothole atcl# in Pastri . ,hot plastic work,delineators,berms Lighted crosswalk,beacon maintenance,repair,replacement Trail and nature walkway construction,repair,maintenance General Landscaping—City Parr,Trails,Nature Areas Park nature areas,soft sca a maintenance,ve talion removal Native planting,ornamental planting,tree planting � Irrigation installation,repair,maintenance (piping,controllers,backflow devices Athletic field grass installation,maintenance,repair/reconditioning Native or natural landscape restoration open sace&nature areas ,?C RFP—On-Call Public Works Construction Services Page 25 Close—Thursday,December 7,2017 Mark"X".' Desci ipt<gn.of Work Expeaence Contractor ubcoritracto Electrical Services—Traffic Signal/Street Lighting Install traffic signals,posts&support structures,wiring,controls Install street lightin&posts&support structures,wiring,controls X Replace lamps and photoelectric control cells Correct mounting hardware,luminaire leveling,alignment lighting components Re-lumping LED,replacement,repair,maintenance lightingcom onents lectrical Services—Pumps,Motors,Controls,PLC Electrical re air/maintenance/relace motors,motor control components PLC and RTU systems installation,repair,maintenance,programming Installation,maintenance,repair,replacement of motor control centers Main power component repair,maintenance,breakers,disconnects, monitors I Repair/replace/install Duct banks,conduits,raceways,wire-ways,etc. Re ait/re lace/install Conductors of all types and ratings Repair/replace/install Conductors of all voltages;120V through 4160V Repair/replace/install Underground Utilities (electrical,instrumentation, or control) K Re air/re lace/install Motor Control Centers Repair/replace/install Breakers,Disconnects,AB 1'Devices and Breaker R-ackina Devices Re air/r lace/install Lighting Systems and Controls Repair/replace/install Premises Wiring and/or Security Systems(CCTV) Re air/te lace/install Transformers,Substations,and Electrical >' Mechanical Services—Pumps,Valves,Process Controls General Construction—Other rite Description Below CONTRACTOR RESPONSIVENESS INFORMATION Number of employees: k60 Number of employees able to respond to afterhours call-out: 1 tD- Contractor Estimated Average Response Time: 9- Hours Management person responsible for direct contact with city and services required for this Proposal-- Name: k-L-Arjyy - Ai t+,j Title: Telephone Number. EmailAddress: CO 1 4_n : rb � -,-1,40A, Additional pages or information may be included that describe the ca abilities and services of contractor(s)not specifically mentioned above. RFP—On-Call Public Works Construction Services Page 26 Close—Thursday,December 7,2017 &11 VP L i Liberty Mutual Surety mutuAl Kyle E.Smith Underwriting Consultant 16505 SW 72-d Ave,Bldg F Portland,OR 97224 Cell:206-999-5938 FAX:503-697-0494 December 4,2017 City of Tigard Atte:Joe Barrett 13125 SW HO Blvd. Tigard,OR 97223 RE. Kerr Contractors Oregon,Inc. Mr.Barrett Liberty Mutual Surety is pleased to be the surety for Kerr Contractors Oregon,Inc.who,in our opinion,is an extremely capable contractor with strong track records of performance. Uberty Mutual Surety is an"A' rated company. It is our understanding that Kerr Contractors Oregon,Inc.is providing prequalification package to the City of Tigard. Liberty Mutual Surety has supported single projects exceeding$50,000,000 and aggregate programs nearing$200,000,000 on behalf of Kerr Contractors Oregon,Inc. Naturally,consideration of surety support for any project and subsequent issuance of bonds is subject to all underwriting criteria being met at the time and is subject to the surety's acceptance of the final contract terms and conditions. Should you have any questions,please do not hesitate to call. Sincerely yours, Kyle E.Smith Underwriting Consultant Member of Liberty Mutual Group EXHIBIT B CONTRACTOR EXPERIENCE FORM Briefly describe three (3) projects within the last 5 pears relating to the construction services and abilities marked on Attachment "A"—Ability to Provide Services. Provide additional pages for each construction services and abilities marked: PROJECT#1—Construction Services Ability E erience: Project Name: Location: Contract Amount: Owner's Contact Year Work Completed: Owner's Phone Number: Contractor's Project Manager. Contractor's Foreman Project Description List of Major Types of Equipment: PROJECT#2—Construction Services AbiluityEx erience: Project Name: Location: Contract Amount: Owner's Contact: Year Work Completed: Owner's Phone Number. Contractor's Project Manager: Contractor's Foreman Project Description List of Major Types of Equipment: RFP—On-Call Public Works Construction Services Page 27 Close—Thursday,December 7,2017 PROJECT#3—Construction Services Ability E erience: Project Name: Location: Contract Amount Owner's Contact: Year Work Completed: Owner's Phone Number. Contractor's Project Manager: Contractor's Foreman Project Description 0 List of Major Types of Equipment: Additional Project Contractor would like to provide Construction Services Ability Experience: Project Name: Location: Contract lnnount: Owner's Contact: Year Work Completed: Owner's Phone Number: Contractor's Project Manager: Contractor's Foreman Project Description List of Major Types of Equipment Additional Information regarding construFtion experience,projects,personnel,or subcontractor(s): ' t W (.- �?2 1 Z• 3 1y.1 *act�3 �2t t ,t.iD cTO-v- 01--A, "Tl RFP—On-Call Public Works Construction Services Page 28 Close—Thursday,December 7,2017 APPLICANT EXPERIENCE QUESTIONAIRRE VMDOT Pro ct Identificatlon 3A 3B 31D 3E 3F 3G 3H 3H E Project Name Read's Crossing Reed's Crossing PLW 1.1 Adams County McMinnville US28:(MP72.5-US26:Cornelius Jackson School Cornelius Pass-Blanton West Pipeline Line to Spokane Municipal Airport MP84,89) Pass Road- Road/Meek Construction County Line- a Rumvay 4.22 Paving Projea4 N.W.185th Road/Sootch Paving _. RahebPrnject Avenue _' Church Road Roundabout _..__ . l F Name Newland Newland Willamette Washington City of Oregon Oregon Washington µ Cammunlges Communities Water Supply Dspartrnerrtof McMinnville Department of Department of County Tra porfailon TransportatloD Transportation ddreaa 16701 S.E. 16701 S.E. 1500 N.W. 310 Maple Park 231 Northeast 3313 Bret 6000 S.W.Raab 1400 S.W. McGillivray Blvd, McGillivray Blvd, Bethany Blvd. Ave Fifth Street ClodFaller Way Read Walnut Street, Suite iso Suite 150 MS-18 Cancouver Vanmuver Beaverton Olympia McMinnville The Dalley Portland HIIWmro tate WA WA OR WA OR OR OR OR 98683 98683 97006 98504 97128 97058 97221 97123 Phone 380.254.0644 380.254.0544 503.941.4567 (509)3246250 (503)434-7312 541.980.4978 971.673.5228 503.646.7828 First Name Jessie Jessie Skip Chad Rich Shane Ron Bill Last Name Lovnen Lovden Henkel Simonson Spofford Johnson Larson Hunter ect Infomnatlon Prime Prime Prime Prime Prime Prime Prime Prime Pr ect Status Ongoing On in Ongoing Ongoing Ongoing Ongoing Ongoing Ongoing Estimator QC QC ST BG BB BB ST BS Prolect Mana r KC KC KC KM JJ JA OF ICC KCI Job Number 2170140 2170130 2160410 2160400 2160320 2160300 2160260 2160270 Clave of Project Street Street Waterline Asphalt Paving Airport Asphalt Paving Highway Street Construction Construction Construction Construction B WDOT Class 1,4,6,9,12. 1,4,5,9,12, 1,15,21,30, 2,4,12,27,30, 1,4,12,16,IS, 4,53,57 1,4,5,6,9,11, 1,4,5,9,12, 16,16,17,24, 15,18,17,24, 34,63,57 63,57 17,:K 27,30, 12,16,16,17, 15,16,17,24, ,30.31,32, 27,30.31,32, 32,34,38,53, 21,24,27,30, 27,30,31,32, 34,38,53,57 34,38,53,67 67 31,32,34,38, 34,36,63,67 _ 46,63,57 Class of Prosect ODO B x x x x x CP x x x x x x x REIN x FART x x x x x x x ELEC x x x x x LS x x x x x MHA PAVE x x x x x x PCP x AC x SIGN x x x x x x TTC x x x x x x x x A Ori !net Contract Amount $3,762.91191 $6,836,300 $3,516,630 $9,721,681 $6,649,820 $576,000 $26,456,956 $3,250,101 Final Contract Amount $3,762,989 $6,836,300 $3,616,630 $9,721,681 $6,649,820 5597,354 $26,466,956 $3,250,101 Contract Format(U/P or LS) U/P U/P UIP U/P U/P U/P U/P U/P Start Date 7/5/2017 7/5/2017 5/1/2017 4/15/2017 5/1/2017 9!15/2016 11/1/2016 9/23/2016 C Com letion Date 5/3112018 5/3112018 9/30/2017 9/30/2017 1080/2017 9/30/201601i 7/1512017 City Hillsboro Hillsboro Hillsboro Sprague McMinnville Wesco County Hillsboro Hillsboro tate JOR OR OR 1WA OR OR OR OR u Coma If Bonded Liberty Mutual Liberty Mutual Liberty Mutual Liberty Mutual Ube Mutual Lite Mutual Libe Mutual LI Mutual Name McKay Spoetio McKay Sposlto Kennedy Jenks Washington Century Wast Oregon Oregon Washington Consultants Deparimsnt of Engineering Department of Department of County Transportation Corporation Transportation Transportation Address 1325 S.E.Tech 1325 S.E.Tech 421 S.W.6th 310 Maple Park 5331 SW 3313 Bret 6000 S.W.Raab 1400 S.W. Center Drive, Center Drive, Avenue Ave Macadam Clodfeller Way Raod Walnut Street, Suite 140 Suits 140 Avenue,#207 MS-1g CRY Vancouver Vancouver Portland Olympia Portland The Dallas Portland Hillsboro State WA WA OR WA OR OR OR OR Zip 98663 98883 97204 98504 97239 97058 97221 97123 Phone 360.695.3411 360.695.3411 503.423.4000 509.324-6250 503A19-2130 541.980.4978 971.673.5228 503.846.7828 First Name Heath Heath Ed Chad Bryan Shane Ron Bib Last Name IMeliotte Metlotte JBamhurst Simonson JCondon lJohnson Larson Hunter I of 33 APPLICANT EXPERIENCE QUESTIONAIRRE wsDOT cemmn Project Identfficatlon 3t 3J 4A 4B 4C 4D 4E - 4F" E Protect Name Reeds Crosainp S W.1242 US30:N.W. W:Jordan PDXAir Cargo Verbort-Praden S.E.Tolbert N.W.Brookwood 1 -Off-alta Extension& MCNamas Road.Road Road Highway 47 Street Wateriirw Parkway Improvatronis,., Waterline -N.W.Bridge Multnomah Falls Rehabilitation Waterline .- Relocation Improvements `^ z Transmission Avenue Section Relocation Lina F Name NanallaW Washington - Oregon Oregon - Port of ,.; r Tualatin Valley Clackamas Washington Conrniunllles County Land Department of Department of Portland ,,xi„ Irrigation River Water County Land Use& Transportation Transportation; District Use & Transportation Trarisportation dress 16701 SE 1400 S.W. 3700 S.E.92nd 999 Frontage 8155 N.E.Air 2330 Elm St 16770 SE 82nd 1400 S.W. McGillivray Walnut Street, Avenue Road,Suite 260 Cargo Road Dr.,4100 Walnut Sheet, Blvd,STE 150 MS-18 MS-1B ity Vaneover Hillsboro Portland Troutdale i Portland Forest Grove Clackamas Hillsboro State WA OR OR OR OR OR OR OR Zip 98683 97123 97266 97060 97218 97116 97015 97123 Phone (WO)254-0933 503.846.7808 503.731.3142 503.618.6766 503.415.6702 503.357.3118 503.722 9220 503.846.7829 First Name Jesse Renue Marge Mark Glen Joe Aden Matt Last Name Lovrien Kelfkans West Beeson Moe Rutledge Bjomstedt Meier D P ct Information Prime Prime Primo Prime Prime Prime Prime Prime P Status Ongoing Ongoing Com iete Complete Complete Complete Complete Com plete Estimator BB 913 ST BB BB 6B BB BB Pro set Nan sr KC SK JA JA DF KC SK KC KCI Job Number 2160190 2150450 2160150 2160070 2160030 2150380 2150210 2150200 Close of Project Highway Street Asphalt Paving Asphalt Paving Airport Asphalt Waterline Waterline Street Construction Construction, Paving Construction Waterline BWDOT Class 1,4,3,9,12, - 1,4,9,11,12, 2,4,12,17,18, 2,4,12,17,53, 4,5,12,13,,17, 4,31,53,57 4,31,53,57 1,4,9,11,12, 15,16,17,21, 15,16,13,20, 53,67 57 2S,46,53,67 19,16,17,29, 24,Z7,30,31, 24,27,31,32, 24,27,31,32, 32,34,36,53, 34,38,53,57 34,38,53,57 sr [ACP lass of Proact ODO B x x x x x x x x x x EIN x x x FART x x x x x ELEC x x x x LS x x x MHA x x PAVE x x x PCP C x x IGN x x x x x x x x C x x x x x x x x A Ori Inal CordractAmount $6,792,183 $33,176,916 $4,786,279 $9,207,741 $571,950 $297,366 $312,412 $13,0118,093 Final Contract Amount $6,792,183 $33,176,916 $4,867,138 $9,001,489 $597,354 $333,851 $314,002 $13,219,663 Contract Format(UUP or LS) U/P UIP U/P U/P U/P UIP U/P U(P Start Date 8125/2016 3/112016 71&2016 6/13/2016 7111=16 121112015 7/15/2015 511/2015 C Com IeUon Date 10/9!2017 12/31/2018 10/30/2018 10!30/2016 10/30/2016 2/15=16 8/31n015 12/31n016 City Hillsboro Hillsboro Portland Multnomah Portland Forest Grove Clackamas Hillsboro County County tate OR OR OR OR OR OR OR OR SuMDE Corngnk If Bonded 11.1berly Mutual JUberty Mutual fLibertyMutual I Liberty Mutual UbertY Mutual Uberty Mutual 11-iberly Mutual I Uberty Mutual ArchitectfEnoln Name Parsons Washington Oregon Oregon Port of Murray Smith&Clackamas Washington Brinekerhoff County land Department of Department of Portland Associates, River Water County Land Use& Transports Transportation Inc. Use& Transportation Transportation Address 551 SW 8th Ave 1400 S-W. 3700 S.E.92nd 999 Frontage 6155 N.E.Air 121 S.W. 16770 SE 82nd 1400 S.W. 1600, Walnut Street Avenue Road,Suite 260 Cargo Road Salmon,Suite Drove,6100 Walnut Street, MS-18 900,Suds. MS-18 City Portland Hillsboro Portland Troutdale Portland Poriland Clackamas Hillsboro State OR OR OR OR OR OR OR OR Zip 97204 97123 97265 97060 97218 97204 97015 97123 Phone 503.274-8772 503.846.7808 503.731.3142 503.618.8786 503.415.6702 503.225.9010 503,722.9220 503.846.7829 First Name Brian Renus Marge Mark Glen Brendan Adam Matt Last Name Roche Kellkens West Beeson IM08 O'Sullivan Bjomstedt Meier 2433 APPLICANT EXPERIENCE QUESTIONAIRRE aroor cr�� d' 4N r. eProact Itientlfication moi" 41Q 4H ' 11 �.i E' Project Name South.Cbopsr N.W.253rd N.W.Groveland N.W.Cornelius US97:Medras 4 OR99W , „I-5 Kuebter 184,Nelson MountainHipp Avetttaa Road Plias Road to Moro .,•,., r.. .y�s�y=i Schpt�l.-g'.F .s" .. .s+�" i,, ,s x.�.t� .a !�` 'J,s. Geotel interchange- Point-UrnsMcDorglki SB Ramp *' watering Clearing Crossing F Hoffman City of,. Washington, Washington Oregon CHy of Tigard Oregon Oregon }e Construction Hill9bmm' County Land'` County'Land Deprrhreitof Water Department of Department of Used .µ Wig Transportation Department Transportation Transportation Transportation Transportation Address 805 S.W. 150 E.Main 1400 S.W. 1400 S.W. 3313 Brat 13125 S.W.Hall 455 Airport 1390 SE let Ave Broadway,Suite Street Walnut Street, Walnut Street, Clodfelter Way Blvd. Road,Building 100 MS-18 MS-18 S.E.,Building Q C Portland Hillsboro Hillsboro Hillsboro The Dabs Tigard Salem Ontario State OR OR OR OR OR OR OR OR Zip 972DS 97123 97123 97123 97058 97223 97301 97914 Phone 503.221.8811 S03.881.6252 503.846.7936 503.846.7921 541.296.2800 503.639.4171 541123.4021 First Name Cade Charlie Chadie Zach Robert Mike Shon Doug Last Name Laurence Shall Stearns Moms Townsend McCarthy Heem lJohnson __D. Project lnf©rm0firm Sub Prime Prime Prime Primo Prime - Prune Prime PEWect Status Complete Complete Complete Complete -Complete Com ate Com Com plete Estimafor QC ST BB BB _ _. ..88 _ ST _ QC BB Project MaMMr JH KC KC KC BP DF BK BP KCI Job Number 215018 2150170 2150130 215011D 2150070 2150040 2140470 2140450 Class of Project Site,Street Street Street Street Highway Waterline Clearing Asphalt Paving Construction Construction Construction Construction Construction& Asphalt Paving B T Class - 1,4,5,13,15, 1,4,6,13,16, 1,4,12,1 L 20, 1,4,9,1 1,12, 1,2,4 ,1 2 ,14, T4_,31,5 3,57 1,34,63,67 2,4,12,17,63, AA 16,17,20,27, 16,17,20,27, 34,53,57 15,16,17,20, 16,27,30,34, 57 32,34,63,57 32,34,53,67 24,27,31,32, 63,57 34,38,53,67 Chas of ect 0170 x x x x x CP x x x x x x REIN x x x x EART x x z x x x x ELEC x x x x LS x x x x x MHA x x x x x PAVE x PCP x x C x x I!.nConbad x x x x x x x x x x x x x x x AatContractAmount $16,614,825 $3,661,188 $1,653,580 $10,992,710 $9,902,700 $237,895 $238,135 $6,795649 Amount $21,974,743 $4,040,548 $1,747,408 $10,858,720 $9,396,696 $276,938 $262,275 $6,441,601 Contract Format(U/P or LS) LS U/P U/P U/P UIP U/P U/P UIP Start Date '1"417115/2015 7/112015 7/112015 6/1/2015 3/15/2015 9/1/2014 5/1/2015 C Completion Dada' 9M1117 12/31/2018 11/30/2015 12151/2018 71=016 71112015 12/112014 10/15/2015 city Tigard Hillsboro Hillsboro Hillsboro Wasoo County Tigard Salem Baker City State OR OR OR OR OR OR OR OR ffluretv 2gfflg&njLif Bonded None Liberty Mutual ILiberty Mutual Liberty Mutual Liberty Mutual I Liberty Mutuel I Liberty Mutual I Liberty Mutual fhrmatl Name Harper Houf Mackenzie Washington Washington Oregon City of Tigard Oregon Oregon Peterson County Land County Land Department of Water Department of Department of Righellis Use& Use& Transportation Department Transportation Transportation Transportation Transportation - Address 205 S.E.Spokane 1515 S.E.Water 1400 S W. 1400 S.W. 3313 Brat 13125 S.W.Hall 455 Airport 1390 SE 1st Ave Street,Suite 200 Avenue,Suhe Walnut Street, Walnut Street, Ciodfe@er Way Blvd. Road,Building 100 MS-18 MS-18 S.E.,Building Q FOY Portland Portland Hillsboro Hillsboro The Dallas Tigard Salem Ontario tate OR OR OR OR OR OR OR OR 97202 97214 97123 97123 97058 97223 97301 97914 Phone 503.221.1131 503.224.9560 503,846.7936 503.846.7921 541.296.2800 503.639.4171 541.7607.187 541.823.4021 First Name Janelle Ralph J.R. Charlie Zach Robert Mike Shan Doug Last Name Brannen Henderson Steens Moms Townsend JMcCarthy Hearn Johnson 3 of 33 APPLICANT EXPERIENCE QUESTIONAIRRE Moor -- Pro ect Identification 40 4P 40 4R 4S 4T 4IJ 4V- _E--.. Project Mame 011213:Mulino Schalk Ferry ., North l Ith .. Highway 99W Kerr Parkway 72nd Avenue/ - Deny Deg 0R99W:S.W. Road- Road Sanitary Avenue CDBG Median r Rehabilitation Dartmouth :..: Sanitary Sewer. Durham to S.W. Bladcmans Sewer Extension Stormwater Stmt Culvert,Read& Fischer Read Comer II Qualigr Facilities Intersection Street Improvements F Name Oregon City of City of Clem:.., City of Lake CUy of Tigard Cleanwater Oregon d, y Department of Beaverton Cornelius Ssrvinas Di+ssgo ": Sarvicea Department of ;r Transportation Transportation dorsa 3700 SE 92nd PO Box 4755 1355 N.Barlow 2550 S.W. 380 A Avenue 13125 S.W.Hall 2550 S.W. 3700 SE 92nd ve Street Hillsboro Hwy Blvd. Hillsboro Hwy Ave Portland Beaverton Cornelius Hillsboro Lake Oswego Tigard Hillsboro Portland Stats OR OR OR OR OR OR OR OR 97266 97076 97113 97122 97035 97223 97122 97266 Phone 503.731.4343 503.526.2445 503.357.3011 503.681.3600 503.635.0270 503.539.4171 503.681.3600 503.731.3197 First Name Marjorie Andrew Kevin Richard Crystal Joe Duke Wayne Last Name West Barrett Oppenlarder Boyle,P.E. Shum Barrett Tran Steller D P act i ion Prime Prime Prime Prime Prime Prime Prime Prime act Status complete Complete Complete Complete Complete complete Co Complete Estimator BB QC ST BB QC QC QC BB P Me r SP KC KC JJ JH JJ KC JJ KCI Job Number 1 2140440 2140250 2140240 2140230 2140180 2140180 2140170 2140110 Class of Proisct Asphalt Paving Waterrme Street Utilities: Street Street Street Highway Construction Stormwater Construction Construction ConsWction& Construction Utirtes: BVV00T Class 4,12,17,63,57 15,34,53,57 1,4,12,15,17, 1,16,32,34, 1,4,6,9,1Z 1,4,5,9,12, 1,4,6,12,16, 1,4,9,ti,12, 31,32,34,53, 63,67 76,16,17,20, 16,16,17,20, 30,32,34,63, 13,115,18,17, 57 27,31,32,34, 27.31,32,34, 67 30,31,32,34, 63.67 63,57 S3,67 Class of P eat ODO AB x x x x x ACP x x x x z x REIN x x FART x x x x x x x ELEC x x x x LS x x x x x MHA PAVE PCP x C SIGN x x x x x x x x C x x x x x x x x A OrlainallContractAmount $1,421,665 $994,700 $130,930 $305,550 $3,009,977 $1,568,356 $1,636,128 $1,317,538 Final Contract Amount $1,207,059 $859,203 $175,956 $293,526 $3,332,102 $1,630,725 $1,741,427 $1,281,037 Contract Format(UIP or LS) UIP U/P UIP UIP UIP U/P U/P U/P Start Date 4/1/2015 8/1/2014 8/1/2014 6/1/2014 3/1/2014 61/2014 6/1/2014 81/2014 C Completion Onto 6/30/2015 1211/2014 10/3012014 9/30/2014 3/1/2015 11/15/2014 10/1/2014 9/30/2014 City Motalle Beaverton Comeius Tigard Lake Oswego Tigard Tigard Tigard State OR OR OR IOR JOR JOR OR OR 13unift Com If Bonded 11-iberty Mutual I Liberty Mutual ]Uberty Mutual I Liberty Mutual I Liberty Mutual I Uberty Mutual I Liberty Mutual I Libe2y Mutual AMbItactifFriginii Marine Oregon City of Cay of Clearwater CRY of Lake City of Tigard Clsamvater Oregon Department of Beaverton Cornelius Services Oswego Services Department of Transportation Transportation Address 3700 BE 92nd PO Box 4755 1355 N.Barlow 2550 S.W. 380 A Avenue 13125 S.W.Hal 12550 S.W. 3700 SE 82nd Ave Street Hillsboro Hwy Blvd. Hillsboro Hwy Ave C Portland Beaverton Cornelius Hillsboro Lake Oswego Tigard Hillsboro Portland State OR OR OR OR OR OR OR OR Zip 97266 97076 97113 97122 97035 97223 97122 97266 Phone 503.731.4343 503.526.2445 503.357.3011 503.681.3 1503,635.0270 503.639.4171 503.681.3500 503.731.3197 First Name Imadods Andrew Kevin Richard lerystal Joe Duke Wayne Last Name lWest Barrett Oppenlander Boyle,P.E. IShum Barrett Tran Steller 4 of 33 APPLICANT EXPERIENCE 4UESTIONAIRRE waoor comma PPO eCt.Ideret116Catiotl =- 4W - 4X 4Y- 4Z' 4AA - 4AB 4AC `'x 14AO ��E Project Name x... PIATerminal OR99W:OR240 1-84:MIM OR99W.1-5NB S.W Roy Bosoltman Road Glenwood S.W Scholis ' Roadway •LL-,, (Newberg). ,> Huntington to'=;Ramps Rogers Re-construction Highway Ferry Road Rehabilitation ORIS(Dundee) FarawaA Bend Road/S.W: "- r tm rovem W :, <•:z`a4 Pacific Highway „"y ,. Scholl&F P er32 Rogge Roy .. Ferry CRA 322&324 Rogers to S.W: Road Teal Blvd.) .. . . intersection . F Name Ppitof O►ogo , Oregon Oregon Washington City of 1(geklla! 1Naahtnglon':, PorMand Deparfm"of Department of Department of County Lsnd Wilsonville x County Count)Land Transportation Transportation Transportation User Use Transporhtfon Trim wrlalfon dress 8155 N.E.Air 5681 SW Arctic 1390 SE tat Ave 999 Frontage 1400 S.W. 29798 S.W. 228 West Main 1400 S.W. Cargo Road Drive Road,Suite 280 Walnut Street, Towncenter Street Walnut Street, MS-18 Loop East MS-18 Citv Portland Beaverton Ontario Troutdale Hillsboro Wilsonville Goldendale Hillsboro State OR OR OR OR OR OR WA OR Zlp 97218 97005 97914 97050 97123 97070 98620 97123 Phone 503.799.3520 503.641.8723 541.823,4021 503.818.6766 503.846.7859 503.682.4960 509.773.2371 503.846.7859 First Name Glen Ron Doug Mark Dan Dee Scott Aye Last Name .Moe Larson Johnson Beason Erpenbach Staton Randall Turki D __Pro act Information Prime Prime Prime Prime Prime Prime Prime _ .Prime Pro ect Status Complete Complete Complete Complete Complete Complete Com Complete Estimator BB BB BB BB ST BB BB BB P ed Mann r DF BP BA JJ KC TJK RP KC KCI Job Number 2140080 2140050 2140030 2130300 2130290 2130190 2130180 2130170 Class of Project Airport,Asphalt Asphalt Paving Concrete Paving Highway Road Road Asphalt Paving Road Paving Construction Construction, Construction Bridge BWDOTClasa ; 4,6,12,13,17, 2,4,12,63,67 6,12,13,34, 1,2,4,27,30, 1,4,6,9,11, - 1,4,5,'9,16, 4,12,63,67 1,4,6,9,11, 25,46,A 67 53,67 34,53,97 12,16,16,17, 16,17,27,30, 12,16,16,17, 24,27,31,32, 31.U,36,63, 24,27,31,32, 34,38,63,67 67 34,36,53,67 lass of Pro ect ODO AS x x x x x x ACP x x x x x x x REIN x x x x EART x x x x x ELEC x x x x x LS x x x x MHA PAVE PCP x x x x IGN x x x x x x x x C x x x x x x x x A rt InalContnmtAmount $2,081,887 $3,948,052 $625,500 $1,396,811 $1,563,450 31,183,870 $1.709,381 $8,381,737 Final Contract Amount $2,975,641 $4,445,229 $652,606 $1,498,114 $1,442,030 $1,231,883 $1,808,844 $7,690,251 Contract Format(WP or LS) U/P UIP U/P U/P U/P U/P UIP U/P Start Date 5/112014 4/1/2014 6/1/2015 1/162014 3/1/2014 8/1/2013 9/24/2013 9/1/2013 C om latlon Data 10/3112014 9=014 9/302014 81292014 7/30!2014 11/272013 10/21/2013 11/1512014 City Portland Newberg Farewell Bend Portland Washington Wilsonvile KlfekhatCounty Beaverton County State OR OR OR OR JOR JOR WA OR Su Com If Bonded Liberty Mutual I Liberty Mutual Liberty Mutual Liberty Mutual Liberty Mutual Lleerty Mutual Liberty Mutual ILibertyMutual Name Port of Oregon Oregon Oregon Washington Otak,Inc. Klickltat Washington Portland Department of Deparboerrt of Department of County Land County County Land Transportation Transportation Transportation Use& Use R Transportation Transportation Address 8155 N.E_Air 5681 SW Arctic 1390 SE tat Ave 999 Frontage 1400 S.W. 806 SW Third 228 West Main 1400 S.W. Cargo Road Drive Road,Suite 280 Walnut Street, Avenue,Suite Street Walnut Street, MS-18 300 MS-18 C Portland Beaverton Ontario ITroutdale Hillsboro Portland Goldendale Hillsboro OR OR OR OR OR OR WA OR 7218 97005 97914 97060 97123 98204 98620 97123 Phone 503.799.3520 503.641.8723 541.823.4021 503,618.6766 503.646.7858 503.287.6825 509.773.2371 503.846.7859 First Name Glen Ron Doug Mark Dan Richard Scott Abe t Name Moe Larson Johnson Beeson I Erpenbach JDarland lRandall 1Turkl 5 of 33 EXHIBIT C CHARGES/RATES FOR SERVICES (Attach additional sheets if necessary) TYPE OF RATE RATE EMPLOYEE CLASSIFICATION Regular $ Regular After Hours/Weekends After Hours/Weekends $ Holidays $ Holidays $ TYPE OF FEE RATE NOTES Dump Fee $ /cu.yard Other: TYPE OF EQUIPMENT DALLY RATE WEEKLY RATE MONTHLY RATE Contractor can provide detail price sheets for charges/rates (including holiday, premium, and/or overtime rates)for all listed services for labor,equipment,and/or materials. Provide a quoted percentage mark-up that will apply to any quoted subcontractor costs. DESCRIPTION MARKUP% NOTES Subcontractors Materials % RFP—On-Call Public Works Construction Services Page 29 Close—Thursday,December 7,2017 RFP No. 201707-10002 RFP Title:On-Call Public Works Construction Attachment C:Rate Form Proposer Name: Provide this form with your proposal,in substantially the same form as included In the RFP. Include both pages. Rates to be charged City must Include; prevailing wage rate plus fringe for the workers'job classification as well as overhead,general and administrative expenses,site supervision,profit,and site mobilization and demobilization. If more than one hourly rate will apply to the project type,enter a"Charge Description"for each line and the applicable hourly rate. City will pay Charge Descriptions as specified on this form.City reserves the right to reject other charges Hourly rates which are not applicable for your company should be indicated by marking N/A in the appropriate box Hourly Charges for Labor-work performed during standard business hours(Job descriptions are as defined by BOLI) Laborer Classification Hourly Rate Laborer Group 1 `►5" Group 2 Group 3(includes flaggers) 3a Landscape Laborer/Technician All Groups Power Equiment Opperator Group 2 5ILS Group 4 -7 7 Group 5 ruck Driver All Groups '7 Hourly 537r Charges-overtime wark pedbime4 work performed during non-standard baskmss hours(job descriptions are as defined by BOLI) Laborer Classification Hourly Rate Laborer Group 1 Z Group 2 ?w7 Group 3(indudes flaggers) Landscape Laborer/Technician All Groups Power Equiment Opperator Group 2 ( _ Group 4 0 J E Group 5 T ruck Driver All Groups FZ7U Cost Mark-Up of materials from supliers and work done by subcontractors. %Mark-Up ­ Subcontractors l c� Materials /S Page 1 of 1 Time and Material Equipment Rates City of Tigard On-Call Services Description Units Operated Overtime Rate Operated Rate BACKHOES Cat 416 Integrated Tool HR 153 192 Cat 426 Backhoe 2WD HR 153 192 Cat 436 Backhoe 4WD HR 153 192 Massey Fergeson Drag Scraper HR 153 192 Rubber Tire Backhoe w/Aft HR 153 192 John Deere 710 Backhoe 4WD HR 179 218 COMPACTORS Cat 835 Shee sfoot HR 289 328 8472100m Shee sfoot Cam ac HR 164 223 Large Paving Roller HR 184 223 84'72100mm Smooth Drum Roll HR 184 223 Small Paving Roller I HR 149 188 DOZERS Komatsu D38 Dozer HR 170 209 Komatsu D41 Dozer HR 185 224 Cat D4H Dozer HR 175 214 Cat D4H LGP Dozer HR 1781 217 Komatsu D65 Dozer HR 196 235 Cat D61D Dozer HR 209 248 Cat D6M Dozer HR 209 248 Cat D6R Dozer HR 216 255 Cat D6R LGP Dozer HR 222 261 Cat D7G Dozer HR 209 248 Cat 834 Rubber Tired Dozer HR 284 323 Cat D8L Dozer HR 321 360 Cat D9N Dozer HR 320 359 Cat D10N Dozer HR 438 477 EXCAVATORS 3 TON/2.7 MG Excavator HR 153 192 5.5 TON/5 MG Excavator HR 159 198 8 TON/7 MG Excavator HR 165 204 22 TON/20 MG Excavator HR 184 223 24 TON/22 MG Excavator HR 190 229 30 TON/27 MG Excavator HR 241 280 50 TON/45 MG Excavator HR 287 325 83 TON/75 MG Excavator HR 353 392 88 TON/80 MG Excavator HR 3761 415 150 TON/136 MG Excavator HR 481 520 FARM TRACTORS HR Cat Challan er 65 HR 184 223 Cat Challan er 85 HR 255 294 GRADERS HR Cat 14G Motor Grader HR 211 250 Cat 140H Motor Grader HR 205 244 Cat 16G Motor Grader HR 229 268 Cat 163H Motor Grader HR 261 300 Blade-All Mini Motor Grader HR 167 206 LOADERS 1 of 2 Time and Material Equipment Rates City of Tigard On-Call Services 1.5 CY/1.15 M3 Loader HR 179 218 2.0 CY/1.50 M3 Loader HR 178 217 3.0 CY/2.30 M3 Loader HR 191 230 4.0 CY/3.00 M3 Loader HR 191 230 5.0 CY/3.80 M3 Loader HR 217 256 8.0 CY/6.10 M3 Loader HR 279 318 10.0 CY/7.60 M3 Loader HR 407 446 Integrated Tool Loader HR 191 230 Mustang Skid Steer Loader HR 140 179 SCRAPERS Cat 615 Scraper HR 229 268 Cat 6236 Scraper HR 280 319 Cat 627 Scraper HR 315 354 Cat 637 Scraper HR 417 456 Terex Water Pull HR 241 280 Cat 651 Water Pull HR 260 299 TRUCKS 25 TON/22 MG Articulated Trk HR 191 23 35 TON/32 MG Articulated Trk HR 261 300 32 TON/30 MG Articulated Trk HR 211 250 40 TON/36 MG Articulated Trk HR 286 325 Lowboy 50 TON/45 MG Trailer HR 249 288 Lowoby 80 TON/72 MG Trailer HR 257 296 2,000 GAL/7.6 KL Water Trk HR 172 211 4,000 GAL/15.1 KL Water Trk HR 172 211 2 of 2 CERTIFICATE OF LIABILITY INSURANCE THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIST CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER($),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: H the certMcate holder N on ADDITIONAL INSURED,the policy(les)must be endorsed. N SUBROGATION IS WAIVED,subject to the terns and conditions of the polity,certain policies may squire an endorsement. A statement on this certificate does not corder rip his to the ca tificats troller in lieu of such endorsement(s). PRODUCER CONTACT Ineurmoe AOenq PHONE 1rATL-.�..._... rAy.Stale Zip IN5UllFJk5)AtFONgNO COVERAGE WIIC• AddfflaS kamad;^;rel ..�_....�•:.__._...._._......___........_.__.... WS4RER F• Inutan0e Cornea ;_ ._ _ 01y,S:aleZip f✓18111®r E NSURERF:--.— ••--.--....•'.- COVERAGES CERTIFICATE NUMBER, REVISION NUMBER- THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLL.'SIONS,^41)CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS, ILTR; T'PaOFINSURM POUCYNUMM LIMITS COMMERCIAL GENERAL s UTY 01?34 COMMERCIAL -i i Xx/xzh000t X:ha/woot r EACH s t.relr - /' Lu( CW:JS-MADE;_X i(MUR ._. �. ....._». ..—........`�, .PERSONAL a ACO IN.JRY GUI L AWREGATF',IM:7 APP•.IES P..R'. - -OEArflA:h�aGREQ TE ...: _ p'PCJCY, X _ PPJOL13TV-COMPAP AGO:-S 2.WAfOD •,y AUTOYOBa.E LIAel1TY .i--. 'b U ':1,LYA,'.::J n �., 01294 xx1XX1xXlx Ixxhothoax � ! X,P',(AUTO s I SLY I:JJ-JR (Pu perwn I I +1I . A:-OVT,ED •—'SCAEDLLED I ! .EDGILY INJURY(Pe acetlerr)�S .._�AUTO' 1 A:JTOS XJ HIRED AUTOS f° S.A qEo 1 . F � I C X '.UarBRH.LMLW OCCUR ` :07294 )DdJOt/X10OC 'XX/Inr)= i EA..FI OCCUAREft'E i EXCESS LIAa_-- I CLAIMS-#ADE, i AGGREGATE } +CED F,—=M-J'1Ot:$ O NOIIKERSODMPENSA'rpN 01234 "XXhOfAOIXi[ XX&Xh0WI X �,TPTIr'E. AND EMPLUVERS LIAaa.ITY - :AN,PROPRIMRIPARTNERM(ECUT:JE YI G,.,.F.Ariirf'L?Er T 3 1.008 000 I,OFFICEWMEMBEREXCLUOEJ? L:NfAi (Mandefary In NM I I & e SEASE EA EMPLOVEP 8 1,000 ODD I Nyee,tinw1be under 'DESCRIPTION OF rWRATI :S halos a 6 IC:.'y.`'•-'ca,�.••P'JL'`r L'!x';IS 1,080,000 ) I DESORPTION OF OPERATIONS I LOCATI M f VBIICLES IACORD 101,Addlnoml RemsM$dwdlde,my be msetee If mase ipee Is mWdmdl RE:Job Name&Job Number.Kerr Contractors Oregon,Inc.;Its affiliates,parents and subsidiaries.Contractors Surety,owner,upper-tier Contractors, and any persons or entities so required in the prima contract or contract documents are included as additional insureds per attached CG20101001& CG2037 1001 or its equivalent. Coverage Is Primary and Non-Contributory. Waiver of Subrogation applies to GL,Auto and Worker's Compensation per the attached. See attached Exhibit A for other insurance provisions CERTIFICATE HOLDER CANCELLATION Kerr Contractors Oregon,Inc. SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE PO Bolt 1060 THE 11"I RATlpsl DATE THEREOF, NOTICE WILL BE DELIVERED IN Woodburn,OR 97071 ACCORDANCE WITH THE POLICY PROVISIONS. MrFHORIZED REPFAMWATrA ®1900-2014 ACORD CORPORATION. All rights reserved. ACORD 25(2014101) The ACORD name and(opo are ra ilstorsd marlur of ACORD Kerr Contractors Equipment List City of Tigard On-Call Services 7KCETruck Truck-Articulated AT721 99 VOLVO A25C ARTICULATED DUMP TR 53SOV12130 Truck-Articulated AT724 93 VOLVO A25C ARTICULATED DUMP TR AZSV8088 Truck-Articulated AT725 VOLVO A25C 4X4 ARTICULATED 5350V68222 -Articulated AT747 VOLVO A40D ARTICULATED TR A40DV10004 KCE Truck-Articulated AT748 01 VOLVO A400 ARTICULATED DUMP TR A40DV60096 KCE Truck-Articulated AT749 05 TEREX TA40D ARTICULATED DUMP T A842-1018 KCE Truck-Articulated AT750 06 VOLVO ARTICULATED DUMP TR A40DV13137 KCE Truck-Articulated AT754 01 VOLVO A40D ARTICULATED TRUCK A40DV60012 KCE Truck-Articulated AT756 01 VOLVO A40D ARTICULATED TRUCK A40DV60013 KCE Truck-Articulated AT757 107 VOLVO A40D ARTICULATED DUMP TR A40DV14086 KCE Truck-Articulated AT758 04 VOLVO A40D ARTICULATED DUMP TR A40DV12032 KCE Truck-Articulated AT778 I B50D 7.4 BELL ARTICULATED TRUC B93A350DP07505499 KCE Truck-Articulated AT779 13 JOHN DEERE 46DET ART DUMP TRK 1DW460ETEDE654431 KCE Truck-Articulated AT933 13 MOROOKAMST3000VDDUMPER 30163 KCE Truck-Articulated AT935 90 MOROOKA MST1500 CRAWLER DUMPER 15554 KCE Backhoe EH396 12 CAT 906H WHEEL LOADER CAT906HVSDHO2843 KCE jBackhoe BH397 07 CAT 414E IL SKIP LOADER CAT0414EVELB00242 KCE Backhoe SH398 07 JOHN DEERE 2441 WHEEL LOADER LU244JX717699 KCE Backhoe BH399 07 JOHN DEERE 31DJ BACKHOE 703101X138746 KCE Backhoe BH408 06 JOHN DEERE 41OG LOADER BACKHOE T0410GX961298 KCE Backhoe BH409 04 JOHN DEERE 71OG LOADER BACKHOE T0710GX933842 KCI Concrete CE103 05 CART AWAY PORTBALE CONCRETE MI 4MFAI52OFM002208 KCI Concrete CE106 90 TON CEMENT SILO KCI Compaction-Hand CP100 IMIKASA DIESEL PLATE 1101510 032117 KCI Compaction-Hand CP101 MIKASA DIESEL PLATE V3355 KCI Compaction-Hand CP102 13 MULTIQUIP DIESEL PLATE Y3941 KCE Compaction-Hand CP104 MIKASA PLATE Z1100 KCE Compaction-Hand CP105 DIESEL COMP MQ MVH406 Y-4120 KCE lCompaction-Hand CP106 15 MULTIQUIP MVH508nZ dna PLATE A-1461 KCE Compaction-Hand CP107 16 MULTIQUIP MVH508DZ VIB PLATE A-1519 KCI Compaction CR801 SAKAI ROLLER TW40 30816 KCI Compaction CR8D2 04 VR DD16 ROLLER 165407 KCE Compaction CR804 00 SAKAI SW350-1 TANDEM ROLLER VSW1410232 KCE Compaction CR806 01 SAKAI SW320 TANDEM ROLLER VSW2310110 KCE Compaction CR857 00 SAKAI SV510TF COMPACTOR VSV11T10113 KCE Compaction CR858 12 SAKAI SV510D ROLLER VSV21-10174 KCI Compaction CR863 SAKAI SW40 SMOOTH DRUM ROLLER 30586 KCE Compaction CR864 06 SAKAI SV70OD-E VIB COMPACTOR 10117 KCE Compaction CR865 06 ISAKAI SV700D SOIL COMPACTOR 10112 KCI Compaction CR868 CAT 835 COMPACTOR 43E247 KCI Compaction CR886 CARON STATIC COMPACTOR-PULL 6903 KCE Compaction CR888 07 2007 SAKAI GW750 ROLLER 20104 KCE Compaction CR889 09 2009 HAMM HD 130VO HIS200161 KCE Compaction CR890 09 2009 HAMM HD 120VO H1840217 KCE Compaction CR892 04 HAMM HD120HV TANDEM ROLLER H1630318 KCE Compaction CR894 CAT 825C SOIL COMPACTOR 86X00940 KCI Compaction CR895 1921 DYNAPAC CP217 TIRE ROLLER 698BO47 KCE Compaction CR896 CAT 825C SOIL COMPACTOR 86XO0737 KCE Compaction CR897 HYSTER C450B DD PADFOOT ROLLER Kerr Contractors Equipment List City of Tigard On-Call Services KCE Compaction CR8987PULL DO PADFOOT ROLLER KCE Compaction CR901TANDEM ROLLER VSW520630 KCE Compaction CR903 COMPACTOR 3SW56-50102 KCI Compaction CR905COMPACTOR KCE Compaction CR906 06 SAKAI SW900 TANDEM ROLLER VSW33-10106 KCE Compaction CR907 INGERSOLL-RAND PT25OR ROLLER 6481909A1 KCE Compaction CR908 SHEEPFOOT TOW BEHIND COMPACTOR SR5493 KCE Compaction CR909 69 HYSTER C550A 9 WHEEL ROLLER A92C1528N KCE Compaction CR910 DYNAPAC CC501 VIBRATORY ROLLER 60910765 KCI Compaction CR911 02 DYNAPAC CC722 TANDEM ROLLER 63920758 KCE Compaction CR914 08 SAKAI CV550D VIBRATORY ROLLER VSV8D501D8 KCE Compaction. CR915 08 SAKAI CV550D VIBRATORY ROLLER VSVBD50113 KCE Compaction CR917 ISAKA1 SV500TF ROLLER 10361 KCE Compaction CR918 69 HYSTER C550A 9 WHEEL ROLLER A92L1561N KCE Compaction CR919 79 HYSTER C530A 9 WHEEL ROLLER A91C3055Z KCE Compaction CR923 98 CAT 825G COMPACTOR 6RN00328 KCE Compaction CR925 88 INGERSOLL-RAND PT140 ROLLER 50695 KCE Compaction CR926 87 BOMAG BW12R 9 WHEEL ROLLER 106610020146 KCE Compaction CR929 193 CAT 834E COMPACTOR 92200545 KCE Compaction CR931 07 DYNAPAC CA362D ROLLER 72420975 KCE Compaction CR933 15 DYNAPAC CA3500PD COMPACTOR 10000146CFA016448 KCE Compaction CR935 15 DYNAPAC CA2500D DRUM ROLLER 10000138AFA016155 KCE Compaction CR936 15 DYNAPAC CA2500D DRUM ROLLER 10000138LFA016156 KCE Compaction CR937 08 HAMM HD10VV TANDEM ROLLER H1710804 KCE Compaction CR938 HYSTER SHEEPS€OOT COMPACTOR KCE Compaction CR939 77 CAT 824B COMPACTOR 36H3015 KCE Compaction CR940 VSHEEPSFOOT COMPACTOR KCE Compaction CR941 5'SHEEPSFOOTCOMPACTOR KCE Compaction CR942 93 CAT 825C COMPACTOR 86XO1068 KCE Compaction CR943 CAT 8250 SOIL COMPACTOR 86XO0659 KCE Compaction CR944 86 CAT 825C COMPACTOR 86XO0686 KCE Dozer DZ139 68 CAT 824B WHEEL DOZER 36HOO568 KCE Dozer DZ150 98 KOMATSU D21P-7 CRAWLER TRACTOR 80167 KCI Dozer DZ157 CAT 834 WHEEL DOZER 43EO0389 KCE Dozer DZ158 90 CAT 8348 WHEEL DOZER 92ZOD448 KCE Dozer DZ159 08 KOMATSU D51EX-22 TRACTOR KMT0D080A51B10516 KCE Dozer DZ160 75 CAT 824B WHEEL DOZER 361-11425 KCE Dozer DZ165 06 CAT D6N XL CRAWLER TRACTOR CATOOD6NAAKMO1926 KCE Dozer DZ171 07 JOHN DEERE 8501 DOZER TOSSOJX145793 KCE Dozer DZ181 03 DRESSTA TD25H DOZER 4970001P073097 KCE Dozer DZ186 87 CAT D9L CRAWLER TRACTOR 14YO3981 KCE Dozer DZ197 88 CAT D10N CRAWLER TRACTOR 2YD00523 KCE Dozer DZ198 02 CAT D11N CRAWLER DOZER 74Z75295 KCE Dozer DZ200 01 CAT D9R CRAWLER TRACTOR ABKO0483 KCE Dozer DZ202 99 KOMATSU D27SA-2 CRAWLER TR 10318 KCE Dozer DZ204 CAT D11N CRAWLER TRACTOR 4HKO0369 KCE Dozer DZ205 08 KOMATSU D51EX-22 CRAW.TRACTOR KMTOD080TSlBlOB77 KCE Dozer DZ206 08 JOHN DEERE 450J LT TRACTOR T0450JX155616 KCE Dozer IDZ209 110 1 CAT D11T CRAWLER TRACTOR ICATOD11TJGEB00572 Kerr Contractors Equipment List City of Tigard On-Call Services KCE Dozer DZ210 08 KOMATSU D155AX-6 TRACTOR KMTOD074LO20KKSS KCE Dozer DZ215 09 IKOMATSU D51EX-22 CRAWLER B11190 KCE Dozer DZ216 15 JOHN DEERE 850K DOZER 1TOSSOKXPFF280293 KCE Dozer DZ218 06 JOHN DEERE 8501 WILT TRACTOR T0950JX119325 KCE Dozer DZ219 06 JOHN DEERE 8501 WILT TRACTOR TOSSOJX132949 KCE Dozer DZ220 11 CAT D7E CRAWLER TRACTOR CATOOD7ECMDB00296 KCE Dozer DZ224 06 CAT D10T CRAWLER TRACTOR CAT0D10TCRJG00499 KCE Dozer DZ227 10 CAT D7E CRAWLER TRACTOR CAT00D7ECMDB00208 KCE Dozer DZ228 05 CAT DST CRAWLER TRACTOR KPZ00613 KCE Dozer IDZ230 116 JOHN DEERE 700K CRAWLER DOZER 1T07D0KXCFF290059 KCE Dozer DZ234 195 CAT D9N CRAWLER TRACTOR 6X101128 KCE (Dozer IDZ.237 181L (CAT D9L CRAWLER TRACTOR 14Y00788 KCE Dozer DZ238 11 CAT D7E L CRAWLER TRACTOR SCGO0167 KCE Dozer DZ240 11 CAT D117 CRAWLER TRACTOR CATOD11TCGEB00721 KCE Dozer DZ241 09 CAT 06T LGP CRAWLER TRACTOR CAT00D6THWCG00528 KCE Dozer DZ243 112 JOHN DEERE 850K TRACTOR 1T0850KXACE223908 KCE Dozer DZ245 186 JOHN DEERE 450E LGP TRACTOR T0450EH727690 KCE Dozer DZ246 188 CAT 8348 WHEEL DOZER 92Z00363 KCE Dozer DZ247 97 CAT D10R CRAWLER TRACTOR 3KROD675 KCE Dozer DZ248 83 CAT DBL CRAWLER TRACTOR 53YO1822 KCE Dozer DZ250 11 CAT D7E CRAWLER TRACTOR CATOOD7ECTANOD453 KCE Dozer DZ251 CAT 834B WHEEL LOADER 92200261 KCE Dozer DZ252 112 CAT D7E CRAWLER TRACTOR CATOOD7ETTAN01250 KCE Dozer DZ253 11 CAT D7E CRAWLER TRACTOR CATOOD7ETMDBD0283 KCE Dozer DZ254 79 CAT D4E PIPELAYER 28X1156 KCE Dozer DZ255 78 CAT D4E PIPELAYER 27X490 KCE Dozer DZ256 75 CAT D4D PIPELAYER 8313434 KCE Dozer DZ257 75 CAT D4D PIPELAYER 8313559 KCE Exavator-Attachment EA349 STANLEY EX100 HAMMER 334 KCE Exavator-Attachment EA351 07 STANLEY 60EX HYDRAULIC HAMMER 596 KCE Exavator-Attachment EA352 STANLEY MB50EX BREAKER 1326 KCE Exavator-Attachment EA353 03 STANLEY MB60EXS BREAKER 24 KCE Exavator-Attachment EA354 12 STANLEY MB138 HYD BREAKER 12A11G68 KCE Exavator-Attachment EA355 16 TOKU TNB-31OLU BREAKER 11584 KCE Exavator-Attachment EX280 WACKER NEUSON EZ53VDS WNCE051OTPAL00411 KCE Excavator EX281 KOBELCO SS MICRO EXCAVATOR P505660 KCE Excavator EX282 15 JOHN DEERE 6013 COMPACT IXC 1FFDGOGXHRJ287012 KCE Excavator EX283 TAKEUCHI TB260 EXCAVATOR 126100837 KCE Excavator EX284 KOBELCO SK35SR EXCAVATOR PX17-40152 KCE Excavator EX286 114 KOMATSU PC22SUSLC-10 EXCAVATOR 1209 KCE Excavator EX296 14 TAKEUCHIT8138 EXCAVATOR 138201027 KCE Excavator EX300 TAKEUCHITB138 EXCAVATOR 138201123 KCE Excavator EX3012 16 JOHN DEERE 85G EXCAVATOR 1FF085GXTGJ018540 KCE Excavator EX3013 16 JOHN DEERE 85G EXCAVATOR 1FF085GXKGJ018539 KCI Excavator EX302 CAT E70 EXCAVATOR 5TGO0284 KCE Excavator EX3120 05 KOBELCO ED150-1E EXCAVATOR YLOS-00737 KCE Excavator EX313 DOOSAN DX140LC EXCAVATOR 0006133 KCE Excavator EX3219 07 KOBELCO SK 21OLC-8 EXCAVATOR YO09U3439 KCE Excavator EX3220 13 1DOOSAN DX225LC-3 EXCAVATOR IDHKCEBAOAD0001076 Kerr Contractors Equipment List City of Tigard On-Call Services FAA. 7KCIExcavator r EX3221 797KOBELCO' DX225LC-3 EXCAVATOR DHKCEBA0PC0001034 r EX3222 ERE 245G EXCAVATOR 1FF245GXVGF800125 r EX3248 WHEELED EXCAVATOR SAL00641 EX325 SK220 V EXCAVATOR LQ03526 KCE Excavator EX329 06 KOBELCO 5K250LC LONG REACH LL09U1133 KCE Excavator EX3300 12 VOLVO ECR305CL EXCAVATOR VCECR305T00110190 KCE Excavator EX3301 11 VOLVO ECR30SCLEXCAVATOR VCECR305AO0110117 KCE Excavator EX3302 06 JOHN DEERE 350D LC EXCAVATOR FF350DX805101 KCE Excavator EX331 KOBELCO SK260 EXCAVATOR LL10-U 1517 KCE Excavator EX332 KOSELCO SK295LC-9 EXCAVATOR LB07U1012 KCE Excavator EX334 13 KOBELCO 260 LC-9 EXCAVATOR LL1408016 KCI Excavator EX335 97 KOBELCO SK31OGD EXCAVATOR LC03870 KCE Excavator EX350 KOMATSU PC60OLC-7 EXCAVATOR KMTPC090PO2020162 KCE Excavator EX351 05 CAT365CL ME EXCAVATOR CAT0365CEELCO0165 KCI Excavator EX354 98 KOMATSU PC75OLC-6 EXCAVATOR 10138 KCE Excavator EX357 03 KOMATSU PC60OLC-6 EXCAVATOR 11117 KCE Excavator EX359 02 KOMATSU PC600LC-6 EXCAVATOR 11096 KCE Excavator EX360 HITACHI UH 501 TRACK EXCAVATOR 781-0114 KCE Excavator IX361 HITACHI EX1100-3 EXCAVATOR 17E-2022 KCE Excavator EX362 96 HITACHIEX1100-3 EXCAVATOR 17E2005 KCI Excavator EX364 LIEBHERR R984 ELE.BARGE UNLOA 690-0102 KCE Excavator EX366 90 HITACHIEX1D00 EXCAVATOR 177-1067 KCE Excavator EX368 06 HITACHI EX1900-5 EXCAVATOR HMCIBCOOADOGO0105 KCE Excavator EX370 08 VOLVO EC700CL EXCAVATOR VCEC700CIOD110035 KCE Excavator EX371 05 HITACHIZX800LC EXCAVATOR FF017V0006438 KCE Excavator EX372 104 KOMATSU PC75OLC-7 EXCAVATOR KMTPCO88CO2020027 KCE Excavator EX483 06 KOBELCO SK48OLC EXCAVATOR YS06-UO547 KCE Excavator EX485 09 KOBELCO 5K26OLC EXCAVATOR LL10UI640 KCE Excavator EX486 14 KOBELCO SK500L-9 EXCAVATOR YS12-03581 KCE Excavator EX490 10 JOHN DEERE 850D LC EXCAVATOR FF850DX973093 KCE Excavator EX493 15 DOOSAN DX350LC-5 EXCAVATOR CECBD-010128 KCE Excavator EX494 DOOSAN DX70OLC-U510 CECAN-005005 KCE Excavator EX495 11 JOHN DEERE 870G LC EXCAVATOR 1FF970GXTBE870025 KCE Excavator EX496 07 TEREX TXC520LC-2 EXCAVATOR DHKHEXMOP70040002 KCE Excavator EX497 15 DOOSAN VX225LL EXCAVATOR CEBAF-005194 KCE Excavator EX498 15 TAKEUCHITBI140CR EXCAVATOR 514400441 KCE Excavator EX499 DOOSAN DX225LC-3 EXCAVATOR 001751 KCE Excavator EX502 12 VOLVO EC25ODL EXCAVATOR VCEC25ODT0021004o KCE Excavator EX503 07 HITACHI 2X85OLC-3 EXCAVATOR FFO1 IDQ020193 KCE Excavator EX504 11 JOHN DEERE 850D LC EXCAVATOR 1FFBSODXABD973132 KCE Excavator EX505 108 HYUNDAIR25OLC-7A EXCAVATOR N70410249 KCE Excavator EX507 06 JOHN DEERE 800C VG EXCAVATOR FF8000X971095 KCE Excavator EX508 KOBELCO SK48OLC EXCAVATOR YS06U0259 KCE Excavator EX509 05 KOMATSU PC125OLC-7 EXCAVATOR KMTPC079CO2020250 KCE Excavator EX510 10 HITACHIZX850LC-3 VG EXCAVATOR FFOI1DQ020839 KCE Excavator EX511 08 JOHN DEERE 450D LC EXCAVATOR FF450DX913620 KCE Excavator EX512 13 DOOSAN DX255LC-3 EXCAVATOR DHKCEBAOCCDO01022 KCE Excavator EX513 13 DOOSAN DX255LC-3 EXCAVATOR DHKCEBAOKD0001027 KCE Excavator EX514 08 CAT M322D MOBILE EXCAVATOR IW2SO0315 Kerr Contractors Equipment List City of Tigard On-Call Services MIL1 . — 27 KCE Excavator EX515 10 JOHN DEERE 850D LCVG EXCAVATOR 1Fr85ODXCA0973109 KCE Excavator EX516 11 JOHN DEERE 850D LCVG EXCAVATOR IFFBSODXVBD973131 KCE Excavator EX517 KOMATSU PC60OLC-6 EXCAVATOR 10019 KCE Loader LD890 12 NEW HOLLAND L225 SKID STEER JAFOL225CCM447D96 KCE Loader LD892 199 CAT 906 WHEEL LOADER 62500862 KCE Loader LD895 112 VOLVO MC110C SKID STEER LOADER GE011OSSHB1640622 KCI Loader LD902 MUSTANG BROOM ATTACHMENT MS601; KCE Loader LD906 05 1D 328 SKID STEER LOADER T00328F105140 KCE Loader LD9209 12 CAT 924K WHEEL LOADER CAT0924KTPWR00897 KCE Loader LD937 DOOSAN DL200 WHEEL LOADER 010017 KCE Loader LD938 DOOSAN DL200-3 WHEEL LOADER 010022 KCE Loader LD9408 04 KOMATSU W250PT-5L TOOL CARRIER A79072 KCE Loader LD9502 06 VOLVO L110E WHEEL LOADER L110EV6D593 KCI Loader LD958 CAT 988F SERIES II WHEEL LOADE 2ZROO777 KCE Loader LD9606 15 KOMATSU WA320-7 WHEEL LOADER 80610 KCE Loader LD9607 15 KOMATSU WA320-7 WHEEL LOADER 80622 KCE Loader LD9608 115 KOMATSU.WA320-7 WHEEL LOADER 80614 KCE Loader LD9610 97 KOMATSU WA420-3L WHEEL LOADER WA4203LA30081 KCE Loader LD9611 05 KOMATSU WA450-5L WHEEL LOADER KMTWA058J57A36424 KCE Loader LD9612 04 KOMATSU WA450-51.WHEEL LOADER A36192 KCE Loader LD9617 15 JOHN DEERE 624K WHEEL LOADER 1DW624KZAEF666087 KCE Loader LD9619 12 JOHN DEERE 644K WHEEL LOADER 1DW644KZTCE645745 KCE Loader LD973 101 CAT 973C CRAWLER LOADER 3RZOO290 KCI Loader LD975 09 JOHN DEERE 8441 WHEEL LOADER DWWJX620508 KCI Loader LD976 06 JOHN DEERE 844J WHEEL LOADER DW844JX604798 KCE Loader LD977 06 JOHN DEERE 944J WHEEL LOADER DW844JX602377 KCE Loader LD9801 CAT 9926 WHEEL LOADER 7HR00052 KCE Loader LD9802 03 CAT 98BG WHEEL LOADER CAT0988GJBNHOO858 KCE Loader L09803 106 KAWASAKI 115ZV WHEEL LOADER 11045322 KCE Loader LD9806 106 VOLVO L180E WHEEL LOADER L180EV7238 KCE Loader LD9807 100 VOLVO L22DD WHEEL LOADER L220DV1505 KCE Loader LD9808 KAWASAKI 115Z II WHEEL LOADER 115015036 KCE Loader LD9809 78 CAT 9888 WHEEL LOADER SOW2996 KCE Loader LD9810 11 CAT 988H WHEEL LOADER CAT098SHEBXY04558 KCE Loader LD9811 08 JOHN DEERE 824J WHEEL LOADER DWS24JX618470 KCE Loader LD9812 78 CAT 988B WHEEL LOADER 5OW2050 KCE Loader LD9813 I CAT 988F SERIES li WHEEL LOADE 2ZRO1891 KCE Loader LD988 101 CAT 988G HIGHLIFT WHEEL LOADER 2TWO0134 KCE Loader LD989 105 VOLVO L330E WHEEL LOADER L330EV62221 KCI Loader LD990 CAT 990 WHEEL LOADER 7HKO0151 KCI Loader LD991 ICLARK 4758 WHEEL LOADER 474A101 KCI Loader LD994 CAT 9920 WHEEL LOADER 42X607 KCl Loader LD995 CAT 9920 WHEEL LOADER 49Z75295 KCE Loader LD997 05 JOHN DEERE 21OLE SKIP LOADER T021OLE884259 KCI Machine Attachment ME702 CONCRETE BARRIER KCl Machine Attachment ME703 STEEL PLATES KCI Machine Attachment ME718 KCI BUILT BAKER TANK KCI Machine Attachment ME722 HYDRAULIC TORCH WRENCH SCD-100,V10391,20427 KCE Machine Attachment ME725 01 INGERSOLL VR1056 FORKLIFT 168425 Kerr Contractors Equipment List City of Tigard On-Call Services . a KCE Machine Attachment ME726 01 INGERSOLLLIGHTSOURCE 344059 KCE Machine Attachment ME734 KUBOTA RTV900 A51045103 KCE Machine Attachment ME735 08 KUBOTA RTV1100&3000LB WINCH KRTV110081018294 KCE Machine Attachment ME736 08 RENEGADE TMB 9500 PARTS WASHER 104723 KCE Machine Attachment ME737 1HYSTER S50XM FORKLIFT D187V23245Y KCE Machine Attachment ME738 01 UNITECH 100 TON TRUCK SCALE 6601 KCE Machine Attachment ME741 CAT DP135 27,000 LB FORKUFT 5DP00017 KCE Machine Attachment ME743 04 TGMI CL100 STRAW BLOWER 1303010718 KCE Machine Attachment ME744 194 FINN B260 STRAWBLOWER RDA2569 KCE Machine Attachment ME745 05 JLG G1255A TELESCOPIC FORKLIFT D160016948 KCE Machine Attachment ME746 IKON MODEL 16 TOW BEHIND GRADER 3503 KCE Machine Attachment ME747 CMI 70"PLATFORM SCALES&AUTO 3552 KCE Machine Attachment ME748 BACKFILL CONVEYOR KCE Machine Attachment ME749 07 BOWIE 1500 HYDRO SEEDER 110307292 KCI Machine Attachment ME753 5'X 22"WRECKING BALL KCI Machine Attachment ME754 06 DIECI XRM7.732 4X4 REACH LIFT 1700470 KCE Machine Attachment ME758 00 JOHN DEERE 643G WHEEL FELLER T0643GX880095 KCE Machine Attachment ME760 CAT SR41000KW PORT GEN SET GNA02882 KCE Machine Attachment ME761 05 STERLING L8500 T/A BOOM TRUCK 2FZHAWDC65AU77537 KCE Machine Attachment ME766 EAGLE IRON WORKS WRECKING BALL KCE Machine Attachment ME768 YANMAR MINI DUMP TRUCKS NO PLATE KCE Machine Attachment ME769 76 TRAILMOBILE P21H-ORAD TANKER N50226 KCE Machine Attachment ME771 08 BOBCAT CT230 MFWD TRACTOR ABFP11420 KCE Machine Attachment ME773 10'X30'KNIFE EDGE BOX/SPACERS KCE Machine Attachment ME774 95 KOMASTSU BRAKE PRESS 0011 KCE Machine Attachment ME775 AMERICAN HERCULES SHEAR 5-375072499 KCE Machine Attachment ME776 87 GOMACO 850011 CONCRETE PAVER MC1415628 KCE Machine Attachment ME777 12 DITCH WITCH 1TR4 TRENCHER ATT. CMWITR4XAC0000657 KCE Machine Attachment ME778 HYDRO WHEEL 48"TRENCH WHEEL KCE Machine Attachment ME779 EDGE 5011936 COLD PLANER ATT. DLF1637 KCE Machine Attachment ME780 TAKEUCHI TL12CRH TRACK LOADER 201201446 KCE Machine Attachment ME781 11'X120'TRUCK SCALE KCE Machine Attachment ME782 07 MOBY DICK SKID 16'X36'WHEEL 074136 KCE Machine Attachment ME784 CON EQTEC BG-32513"BERM GRIND PM62964 KCE Machine Attachment ME785 06 KALMAR DCE127-6 FORKLIFT T431050084 KCE Machine Attachment ME788 GODWIN PUMPS GSP800SV 5072GPM 161698 KCE Machine Attachment ME789 GODWIN PUMPS GSP900SV 5072GPM 163860 KCE Machine Attachment ME790 KUBOTA 3767 RTV 90OG KRTV90OA51046550 KCE Machine Attachment ME793 11 XTREME XR153415000LB FORKLIFT XR1534081191557 KCE Machine Attachment ME794 PRO MAC 52CMP 2 BRUSH CUTTER 1315OFSS KCE Machine Attachment ME795 12 KUBOTA B3300HSD FARM TRACTOR 55459 KCE Machine Attachment ME796 VIZTRAC MAX PUSH CAMERA KCE Machine Attachment ME797 SCRAPER PADDLE PRESS KCE Machine Attachment ME798 7 CONCRETE BUCKETS KCE Machine Attachment ME799 84 MKT DE 20/30/3 PILE HAMMER 840202 KCE Machine Attachment ME800 76 HOWARD M130132"ROTOVATOR 940A1756 KCE Machine Attachment ME801 MONROE MV1328456DDWA SAND BOX 02087477 KCE Machine Attachment ME802 SWENSON SAND DISTRIBUTOR BOX KCE Machine Attachment IME803 I EXCAVATOR PLATE COMPACTOR Kerr Contractors Equipment List City of Tigard On-Call Services KCE Machine Attachment ME804 CAT CVP110 PLATE COMPACTOR KCE Machine Attachment ME806 87 BOSTON WHALER 13'BOAT/TRL BMCL285OJ687 KCE Machine Attachment MES07 05 YALE GPD190DBEPDV149 B876E01578C KCE Machine Attachment MES08 90 MCLAUGHLIN MCL-36 BORING 3601039008 KCE Machine Attachment MES09 09 NEPTUNE MAXIMUS II WHEEL WASH KCE Machine Attachment ME811 95 VERMEER T850 CRAWLER TRENCHER 1VRE35OR3SiD00273 KCE Machine Attachment ME812 92 VERMEER T850 CRAWLER TRENCHER 1VRE35CRON1000218 KCE Machine Attachment ME813 04 CONVAULT RND 500 GA FUEL TANK N925369 KCE Machine Attachment ME814 08 GORMAN-RUPP 14C20B 4"PUMP 1409109 KCE Machine Attachment ME817 08 CMI 0400 MULCHER G8J01002 KCE Machine Attachment MES18 07 FECON FXT250 CRAWLER MULCHER LGP039GBOO65 KCE Machine Attachment MES19 08 GODWIN PUMPS HL6M 6"PUMP ,0542767/06 KCE Machine Attachment ME820 FLYGT ELECTRIC SUB WATER PUMP 2250.011-0173 KCE Machine Attachment MES30 13 KOBELCO SK350-9 LOG LOADER YC12U2685 KCE Machine Attachment ME831 SAG CORRECTION SYSTEM KCE Machine Attachment ME832 SKID STEER CONCRETE BUCKET KCE Machine Attachment ME833 SKID STEER CONCRETE BUCKET KCE Machine Attachment ME834 14 OSW 8-WASH WHEEL WASH EW163042 KCE Machine Attachment ME835 SKID MTD HYDRAULIC POWER UNIT KCE Machine Attachment ME836 FELCO STD1020 23'X24"CONVEYOR 0111090548 KCE Pumps PP001 02 PUMP 1 2378 KCE Pumps PP002 OS PUMP 2 1298 KCE Pumps P13003 01 PUMP 3 2040 KCE Pumps PP005 01 PUMP 5 2039 KCE Pumps PP006 02 PUMP 6 2377 KCE Pumps PP007 106 PIONEER SAPP88CA 8"TRASH PUMP 7327 KCE Pumps PPOO8 03 PIONEER SAPP66CA 6"TRASH PUMP 3116P KCE Pumps PP010 KLEIN HURRICANE 12E WATER PUMP 1KTA936152K144435 KCE Pumps PP012 05 GODWIN 3"PORTABLE WATER PUMP 0541821/05 KCE Pumps PP013 KLEIN 12D TOW HURRICANE PUMP 36348 KCE Pumps PP014 GODWIN PUMPS CD225M 8"PUMP 0435671 KCE Shoring SH06 52-88"X6'SHORING KCE Shoring SH09 22-36"X8'SHORING KCE Shoring SH10 22-36"X8'SHORING KCE Shoring SH11 22-36'X8'SHORING KCE Shoring SH12 22-36"X8'SHORING KCE Shoring SH13 22-36"X8'SHORING KCE Shoring SH14 22-36"X8'SHORING KCE Shoring SH15 36.64"X8'SHORING KCE Shoring SH16 40-64"X8'SHORING KCE Shoring SH17 40-64"X8'SHORING KCE Shoring SH18 40-64"X8'SHORING KCE Shoring SH19 28-64"X8'SHORING KCE Shoring SH2O S2-88"X8'SHORING KCE Shoring SH21 22-36"XS'SHORING KCI Shoring SH370 8 X 12 FT TRENCH BOX KCI Shoring SH371 EPI TRENCH BOX 4X20 106064 KCI Shoring SH372 EPI TRENCH BOX SX20 KCI Shoring SH373 EPI TRENCH BOX 8X20 106061 Kerr Contractors Equipment List City of Tigard On-Call Services 7KC Shoring SH374 97 TRENCH BOX 113841 Shoring SH375 20'X 8'TRENCH SHIELD Shoring SH376 SET OF 18'TRENCH BOXES Shoring SH377 GME 4'X20'TRENCH SHIELD 94068$5/9406225 KCE Shoring SH378 8FTX24FTTRENCH BOX KCE Shoring SH379 CUSTOM 4FTX24FT TRENCH BOX KCI Shoring SH380 97 STONE MIZER 115807 KCE Shoring SH381 SFTX12FT TRENCH BOX KCI Shoring SH385 MANHOLE BOX KCI Shoring SH386 01 EFFICIENCS ARCH SPREADER SP-30 KCi Shoring SH387 08 GME WTB6X10X10SPC MANHOLE BOX M0703574 KCE ShorinRt ISH388 8'X30'STACKABLE TRENCH BOX ,W97091186 'KCE Shoring SH389 8'X30'KNIFE EDGE TRENCH BOX W97091187 KCE Shoring SH390 8'X24'KNIFE EDGE TRENCH BOX 105277 KCE Shoring SH391 8'X24'KNIFE EDGE TRENCH BOX 105519 KCE Shoring 5H392 8124'KNIFE EDGE TRENCH BOX 107450 KCE Sharing SH393 4'X24'STACKABLE TRENCH BOX W9809147 KCE Shoring SH394 8'X10'MANHOLE BOX 104830 KCE Shoring SH395 8'X22'PORTABLE MATERIAL BOX KCE IShoring SH396 MANHOLE BOX SHORING 128402 Equipment Group Count Asphalt 22 Backhoe 6 Backhoe 6 Broom 15 Compaction 50 Compaction-Hand 7 Concrete 2 Crane 3 Dozer 46 Excavator 66 Exavator-Attachment 7 Generator 17 GPS/Machine Controls 34 HPDE Welding 1 Lift 1 Light Plant 38 Loader 41 Machine Attachment 74 Motor Grader 18 Office 9 Pickups 39 Kerr Contractors Equipment List City of Tigard On-Call Services Pumps 11 Rock Crushing 38 Rotomilling 9 Scraper 66 Scaper-Pull 18 Scaper-Support 16 Scaper-Water Pull 10 Shoring 38 Soil Mixer 2 Traffic Control 55 Truck-Articulated 15 Truck-Rigid Frame 7 Truck-Tractor. 255 Truck-Trailer 144 Utility Box 2 Water Tower 5 1193