Special Inspection
FINAL SUMMARY LETTER
Date: November 14, 2017
Job#: T1607756.A
City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223-8199
Attn: Building Division
Re: Project Name: PacTrust—Building Tenant Improvements—Building 240
Address: 6650 SW Redwood Ln—Portland, OR
Permit#: BUP2016-00275
Per Chapter 17, Section 1704.1.2 of the International Building Code (IBC), we have performed special inspection of the
following item(s) per our inspection reports only:
Adhesive Anchors &Screw Anchors
Structural Steel
The non-compliance (NC) items recorded for each of the above inspection categories, as listed on the non-compliance
report, have been either repaired and re-inspected by CTI for compliance or reviewed and accepted by the engineer of
record for the project in the "As-Built Condition"or through an RFI.
The issuance of this final report is based on the engineer's acceptance of the NC items not specifically re-inspected by
CTI. CTI did not provide any additional review or re-inspection of those items beyond the inspections that initially
generated each of these individual items on the non-compliance list. The engineer of record has provided the acceptance
of the non-compliance items and as-built conditions.
All requested inspections and tests were performed and reported according to the requirements of project documents and
to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change
orders and applicable workmanship, provisions of the State Building Code and Standards, as well as the structural
engineer's design changes, approvals and verbal instructions.
Our construction inspection and testing services were provided and intended to help reduce the risk of construction
defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or
guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or
omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with
the approved construction documents.
CTI has provided its professional services with the degree of care and skill currently exercised under similar
circumstances by members of its profession in the same locale. Statements made in our reports are based on technical
judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material
tested/inspected only.
P:\Projects\General\2016\T1607756A\11-14-17 Final Letter.doc
Updated 11/30/11
r
Date: November 14, 2017
Job#: T1607756.A
Page 2 of 2
CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means,
methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to
health, safety or welfare.
Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are
further questions regarding this matter please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING INC.
Sten 0"—
Project Manager
SWL/jng
cc: PacTrust—Leslie Louis
City of Tigard Building Division—Walter'Chip Barnett v LESLIEL@PACTD/MAILED
Mackenzie— Ryan Baker EMAILED/MAILED
Mackenzie—Adam Solomonson RBAKER@MCKNZE.COM
Skanska USA Building Inc—Jason Stephens ASOLOMONSON@MCKNZE.COM
PacTrust—Lori Nichelini JASON.STEPHENS@SKANSKA.COM
Skanska USA Building Inc—Lisa Durham LORIN@PACTRUST.COM
Mackenzie—Morgan Toth LISA.DURHAM@SKANSKA.COM
MTOTH@MCKNZE.COM
Carlson Testing, Inc.
Nov 14,2017 Incompleted Items List (NCL)
T16O7756.A •
Project Name: PACTRUST - BUILDING TENANT IMPROVEMENTS - BLDG 240
Project Address: 6650 SW REDWOOD LN PORTLAND OR
Permit No: BUP2016-00275
P.O.No: PCC240-241
Project Manager: STEVEN W. LEACH
Item# Insp. Date
Item Description Compliance Date
Sign-Off
1 JW 05/01/2017 FLARE BEVEL WELDING OF HSS TO HSS CONNECTIONS NOT EOR TOM KAY HAS APPROVED J. WEMPLE
Corrected
WITNESSED BY CONTINUOUS SPECIAL INSPECTION. 05/04/2017
THE WELDING AS COMPLETED
PER EMAIL DATED
05/03/17.
2 JW 05/01/2017 PJP WELDING OF SHEAR CONNECTION PLATES TO
EOR TOM KAY EXISTING WF BEAMS PER RFI #056 NOT WITNESSED BY THE WELDING ASS COMPLETED VEDJ. WEMPLE 05/04/2017
CONTINUOUS SPECIAL INSPECTION.
PER EMAIL DATED
05/03/17.
CC:PACTRUST - LESLIE LOUIS
CITY OF TIGARD BUILDING DIVISION - WALTER 'CHIP' BARNETT
MACKENZIE - RYAN BAKER
MACKENZIE - ADAM SOLOMONSON
SKANSKA USA BUILDING INC - JASON STEPHENS
PACTRUST - LORI NICHELINI
SKANSKA USA BUILDING INC - LISA DURHAM
Page: 1