Loading...
Report ,. fyisr,, Oi6 - ooOq3 l( V 9 4--/ 5j4) I "RIVER TERRACE EAST" -N\ LOT 86 HUB AND TACK CERTIFICATION NE & SE 1/4 SEC, 6, T 2 S, R 1 W, W.M, CITY OF TIGARD, WASHINGTON COUNTY, OREGON SURVEYED MARCH 14, 2018. PREPARED FOR: SW SNOWDALE STREET POLYGON NORTHWEST. COMPANY 703 BROADWAY ST., SUITE 510 VANCOUVER, WA. 98660 -in ... cv lb) to„ to' \ S89*58'43"E 42.00' i i --- - - - --- -- --------------- ------ -- .c 6' PUBLIC UTILITY , __I E EASEMENT r t?.. o 0 co o o 0,6- 0) os 4.00"-§0.- ,.,.. --*---4.00' ° LOTw * LOT bi LOT 85 r- 80 IC N. 87 -, - p , L1J p 0 0 fh z 0 z e 0 .-. REGISTERED 0 0 5 PROFESSIONAL cd ..., LAND SURVEYOR i 04 0.) -.. S89'58'43"E 42.00' 4t, OREGON 4 JULY 9,2002 ..., ›.. TRAVIS O.JANSEN 57751 ,,, so 0 RENEWS:6/30/2019 ...- .-. m .g. I, TRAVIS C. JANSEN, A REGISTERED PROFESSIONAL LAND SCALE g SURVEYOR IN THE STATE OF OREGON, HEREBY CERTIFY THAT 20 0 10 20 .,..° I HAVE ACCURATELY SURVEYED AND STAKED THE OFFSETS 111110.0110millimmell111111 •,,, TO THE FOUNDATION ENVELOPE FOR LOT 86 OF THE PLAT 1 INCH 20 FEET OF "RIVER TERRACE EAST". .1. 0, P DRAWN BY: FAA DATE. 3/15/18 -02 PACIFIC COMMUNITY DESIGN .9' REVIEWED BY: TCJ DATE: 3/15/18 PLANNING - ENGINEERING - SURVEYING 395-041 PROJECT NO.: — (503) 941-9484 -1 } FODESIGN`i FIELD REPORT Page 1 of 1 GDI Project: Polygon-129-03 Prepared By: Andreu Ferrero Project Name: River Terrace East Date: 4/2/2018 Location: SW Scholls Ferry&Roy Rogers,Bvrtn. Report# 21$ Arrivals 0800 Departure: 0900 Weather: Partly Cloudy, 50s Permit#: TBD Site Visit Requested By: Ken (Polygon) Met With (on site): Earthwork crews Purpose: Observe building subgrade lots 8S'*n 86 Outstanding Issues: Proof roll road and curb base rock and repair as needed before paving FR-58 (12/06) Decommission temporary storm and sewer lines through Tract E FR-177 soft fill from slope cut in lots 153, 154 and 155 `*RESOLVED TODAY* Upon arrival I observed that crews had excavated to planned subgrade elevation and covered with approximately 3" of crushed rock in lots 85 and 86, as indicated on the attached site plan. I used a%Z'steel foundation rod to probe through the crushed rock protective layer into the subgrade. I observed that the subgrade consisted of light brown silt(ML). Probe resistance indicated medium stiff to stiff subgrade conditions. Based on observation and testing, It is our opinion that the subgrade evaluated today in lots 85 and 86 have been prepared in general accordance with project requirements and our geotechnical recommendations. Distribution: Attachments: Site Plan (1) Reviewed by: SMD This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or- • services.We . on the contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of our representative.Our work does •, ' . a contractor,the contractor's employees or agents.Our firm is not responsible for site safety.This field report is a DRAFT representation of our field I " inendations.The report can only be considered final upon review of the GeoDesign project manager,as indicated by initials in the"Reviewed Br'Bed.- Signature: 9450 SW Commerce Circle,Suite 300 I Wilsonville,OR 97070 1503.968.8787 I www.geodesigninc.com