Report (20) 6975 SW SANDBURG ST#160 • • TIGARD, OR 97223 s srRUc:rURAt,!IC (971)371-1958 SPECIAL INSPECTION—FINAL SUMMARY LETTER February 27, 2018 Mr. Mark Van Domelen City of Tigard, Building Department 13125 SW Hall Blvd. Tigard, OR 97223 RE: Todd Residence Underpinning 11821 SW Morning Hill Dr. Tigard, OR 97223 Permit#MST2018-00002 Dear Mark: This letter certifies that we have performed special inspection of the referenced project, in accordance with Chapter 17 of the International Building Code. Special inspection has been performed on (2)helical piers, as shown on the permit documents. On February 16, 2018, a representative of i.e. Structural observed the installation of (2) Foundation Supportwork Incorporated model HP288 helical piers, as shown on structural drawings. All helical piers reached or exceeded the specified installation pressure and the minimum penetration depth specified on structural drawings. Load testing was performed on pier(1) in accordance with ASTM method D1143(Quick Method), and passed the creep acceptance criteria. i.e. Structural has reviewed the installation logs of the remaining piers and confirmed them to be acceptable. s Special inspections have been provided to meet the requirements of the building code and do not constitute j a guarantee of the installed work, It is the responsibility of the contractor to execute the work in accordance i with the structural drawings. f If you have any questions or need further information, please call me. `, u c Tu 9' J PR J1 Sincerely, 9�,G'N F �J\ X �, 3, ' 726 f.__r Dima Shemetov , O.e� 2} 20``1 4, Inspector '.R �,c F PIER JOB INFORMATION Job Name/#: 2:733y FOUNDATION SYSTEMS Finish gate: Z//6/1f PIER LOCATIONS 111111 t 2. letc:L1c.Al Pier# Shots Pier# Shots Pier# Shots 1 t2' it 16 31 2 �`i 17 32 3 18 33 4 19 34 5 20 35 6 21 36 7 22 37 8 23 38 9 24 39 10 25 40 11 26 41 12 27 42 13 28 43 14 29 44 15 30 45 Description: l Fore n ignsture 2/6/2018 ' Print JobPacketl BizWiz-KBH Business Management Services I TerraFirma r l Pier Installation TERRNIRMA Hel�caLog I(.'L ti:JF'IiCty STc FI 4e Helical Pier Installation Log Customer: Tacque Coen & Chris Foreman: 04-Tyler Smith Todd Job 11821 SW Morning Install Date(s):2/16/2018-2/21/2018 Hili Dr Address: Tigard, OR Job# J 43698 / 27338 Project# Pier#: ! Pier Installation Date: 7,bad" Drive Head: Installation Torque Coefficient (ft-1): Ultimate Gauge Gauge Load Pier Depth Pressure Pressure Differential Torque Capacity Time Death ft (ft) IN (psi) OUT asi f Pressure (ft. -lb.) (lbs.) Comments /Ga n _ i tvo . C Differential pressure Minimum depth required to meet capacity: /l>r)c) required: ei9/" l Tacque Coen & Chris Tadd 11821 SW Morning 2/16/2018- Hill Dr Tigard, OR 2/21/2018 TerraFirma Foundation Systems https:i/terrafirma.teambizwiz.com/prodJobpacket_Printable.aspx11D=78J=43698&P=27338&DocumentTypeld=1&Title=Helicol%20Pier%20Installation... 1/1 2/1201/3 Print JobPacketl BizWiz-KBH Business Management Services TerraFirma (ERRaiRm) Helical Pier Installation L og Helical Pier Installation Log Jacque Coan & Chris Customer: Foreman: 04-Tyler Smith Todd 11821 SW Morning Job Install Date(s):2/16/2018-2/21/2018 Hill Dr Address: Tigard, OR 43698 / 27338 Project# Pier#: Pier Installation Date: 7 11/6/1 Installation Torque Drive Head: 7K_ Coefficient (ft-1): Ultimate Gauge Gauge Load Pier Depth Pressure Pressure Differential : Torque Capacity Time Depth(ft) (ft) IN (psi) OUT (psi) Pressure 4(ft. -lb.) (lbs.) Comments IOC) e) Jiat _ Differential pressure Minimum depth required to meet capacity: /194,0 req u i red: .4"At Jacque Coan & Chris Todd 11821 SW Morning 2/16/2018- Hill Dr Tigard, OR 2/21/2018 TerraFirma Foundation Systems httes.11terrafirma teambizwiz.comtprod jobpacket_printable.aspx?1D=78.J=436988,P=2733884DocumentTypeld=1&Title4ielical%20Pier%20installation... 1/1