Loading...
Report (138) ms-r- g-0060.ss Bead Office (541)330-9155 11 gorl-c_51,4.1 6,111-6ttirV: Geotechnical Office (503)601-8250 (541)345-0289 Carlson Testing, Inc. Eugene Office Salem Office (503)589-1252 Tigard Office (503)684-3460 Daily Report of Proprietary Anchors Project: (.. ") , Address: tes . CTI Job#: • -; _•• - ' CTI representative - v •• ' t ( was on site this date •; ; to perforrn (Inspector Name&Cert.No.) Special Inspection for 1;3 permit El DFS#(s) 2 jurisdiction In some cases more than one box may be checked for a given item. SCOPE OF INSPECTION Location of proprietary anchors ins to include grid Peere" lines,elevations(floors)and drawing de : 1.Checked in with superintendent or client representative. Name: Company: , t 2.Inspection was"IBC" Ej Continuous Periodic PROPRIETARY ANCHORS Yes No N/A 1.Reviewed previous inspection reports? 2.Reviewed evaluation report? REPORTAIMMARY Verified following items meet manufacturer's published installation instructions. I.Work inspected was: [-j Completed [3mi progress 3.Verified minimum embedment depth of the 2.Completed work inspected 9 was was not anchors. 4.Verified installation of the anchors. in compliance with Approved plans and specifications El Shop drawings 5.Verified anchor diameter. RFI Design change Submittal El N/A 6.Verified steel grade. 7.Verified hole diameter. Document#(s) r, Dated: i 27 - 8.Verified type of drill bit used. -/ 3.Noncompliance item(s)were noted this date,details on 9.Verified hole cleaning method. following page(s). El Yes ID No D N/A 10.Verified adhesive application. 11.Verified edge distance. 4.Noncompliance item(s)were reinspected this date,details 12.Verified spacing. on following page(s). Yes No ID N/A 13.Verified installation torque. El Conform D Remain in progress Evaluation report number&date: Report(s)findings were discussed and left with of Name of product being installed Batch Number Expiration Date ' Based on the Code,approval is required from the Building Official before the SPECIAL INSPECTED items noted above can be covered.Carlson Testing has no authority to direct work of • subcontractors. ' — Inspector Signature: See additional report page(s). El Distribute attachments. Page ) of ) PropAnchors Ver.1 2/12/2009 Terms: Client recognizes that construction observation and:or testing services provided by CTI are techniques which may reduce the risk of construction defects, deficiencies. or omissions arising during or after con- struction. Services performed by CTI do not constitute a \v arranty or guarantee of any type. Even with diligent construction monitoring and/`or testing by C'1 I, construction defects, deficiencies, or omissions in the Contractor's work may dist, In all cases. Client and/or the Contractor shall assign the Contractor the responsibility for the quality and completeness of the work and for adhering to plans and specifica- tions. CTI's work or failure to perform same shall no in any way excuse any contractor_ subcontractor, or supplier from performance of its work in accordance with the contract documents. CII yvitl provide its professional services to Client with that degree of care and skill ordinarily exercised under similar circumstances by members of its profession. This representation is in lieu of other warran- tv or representation, either expressed or implied. It is also understood and agreed that statements made in CII reports are observations based on technical judgements, and should not be construed to be con- clusive representations or fact. If conditions different from \.\hat are indicated in the reports come to Client's attention after receipt of the reports, it is recommended that Client contact CTT immediately to authorize further appropriate evaluation. CTI's work shall not include determining. supervising or implementing the means. methods, techniques, sequences. or procedures of construction. CII shall not be responsible for evaluating or reporting job con- ditions related to health. saint! or wcllarc.