Loading...
Report (126) 7409 SW Tech Center Dr.Ste. 145 sssw Tigard,OR.97223 Ph:503-443-3799 Fax:503-620-2748 avr�rr DAILY FIELD REPORT FOR PROPRIETARY ANCHORS TESTING, INC 03.44;•;799 Date: Mar 1,2018 Permit#: BUP2018-00028 TOTAL HANDLING SOLUTIONS, INC WESTERN MATERIAL 16420 SE MCGILLIVRAY STE Continuous ii 7301 SW KABLE LANE 103-363 PORTLAND, OR 97224 VANCOUVER,WA 98683 Periodic 1 Inspector/Certification# Jason Brown Cert#OBOA 101818-7810 ACS Job# Anchor Embedded in: Concrete Is this a re-inspection?: o Yes Q No Compressive Strength: 3000PSI Approved plans available?: Q Yes 0 No HOLE DETAIL/CONDITION Work acceptable per approved plans?: Q Yes El No Anchor Embed 1/2" Hole 0: 1/2" 3-3/4" Installation complies with Size: Depth: manufacturer's evaluation report?: 0Yes 0 No Holes cleaned properly?: 0 Yes ❑ No LOCATION OF ANCHORS Embedment per plans?: Yes [J No GRIDLINES (4)single 9 racks in warehouse at Lines E.3-G.5/7.1-9.1 INSTALLATION ESR REPORT# GRIDLINES ESR-3772 ITW REDHEAD CARBON STEEL TRUBOLT GRIDLINES ANCHOR TYPE: WEDGE ANCHOR EPDXY TYPE N/A IS THERE AN RFI? Q Yes 0 No EXP. DATE: N/A RFI ATTACHED? ❑ Yes 0 No INSPECTION DETAILS: , Image Description: - ` Completed ACS representative arrived on site to inspect the 1/2"ITW Redhead Trubolt wedge anchors with 3.75"embedment using(2)anchors for ' OPP= anchor each baseplateracking approvedby 1 g '',.c-,• of the pallet Talar Ban'a'ian with installation for Seizmic Inc. pallet racking. Material Handling Engineers via phone and will follow up with the letter of approval for the change of wedge anchors from HILTI KB-TZ to '; ' �', Redhead Trubolt. . f, w • A torque test was performed at 45 ft/lbs per ESR-3772 and the work performed appears to be in conformance with the manufacturers Foreman notified of installation procedures. No known revisions. nonconformance items? 0 Yes El No 0 N/A Foremans Name: Luis with Total Handling Solutions Reviewed11.--a.eb fait Date: cc: dMil-- 03-02-2018 Bob Brown, President ACS-1157 BB/JB 47 AR 0 2 1010 ACCREDITED .S SEIZMIC " - IL Engineering ••c x; Ml. . SPECIAL PRODUCTS CONVEYORS STORAGE RACKS TANK SUPPORTS TALL SUPPORTS OTHER SERVICES St/ELTAL SPECIALS PRODUCTS MACHINERY HEADER STEEL SEI-ECTIVE SEISMIC ANALYSIS RACK BLDGS DRIVE-IN PERMIT ACQUISITION MEMOOD SHUTTLES SORT PLATFORM PUSH BACK VLM SHEDS PICK MODULES A EESS APPROVALS MOVABLE CAROUSELS MEZZANINES ROOF VERIFICATION FLOW RACK STATE FOOTINGS CANTILEVER PRODUCT TESTING GONDOLAS ARC LOCKERS MODULAR OFFICES Licensed in All 50 States CATIVALKS FENCES STRUCTURAL ADDENDUM FOR Western Materials 7301 SM Kable Lane#100, Portland, OR 361009 Job# 18-0414 MAR 6, 2018 In regard to the above project, it is acceptable to use a 1/2"0 ITW Red Head Wedge anchors (ICC ESR#3772)and 3 3/4"min embedment as an approved equal to the anchorage specified on the plans. The number of anchors should match the approved plans and the loading will remain same. Should there be any questions regarding the above responses,please contact me at(909)869-0989. Sincerely, f ��.1 D PROF 4,4.5> 71;t-/ `�� IN Talarlra `1r 16243 „p SEIZItiiK' Inc. ' OREGON ti 4Z F F AZ-* EXPIRES isol, DEC 3 1 2019 1130 E Cypress St.,Covina CA 91724 Tel:909-869-0989/Toll-Free:877-SEIZMIC E-mail:Enginecring!ceSeizmictnc.com