Report (126) 7409 SW Tech Center Dr.Ste. 145
sssw Tigard,OR.97223
Ph:503-443-3799 Fax:503-620-2748
avr�rr
DAILY FIELD REPORT FOR PROPRIETARY ANCHORS
TESTING, INC
03.44;•;799 Date: Mar 1,2018 Permit#: BUP2018-00028
TOTAL HANDLING SOLUTIONS, INC WESTERN MATERIAL
16420 SE MCGILLIVRAY STE Continuous ii 7301 SW KABLE LANE
103-363 PORTLAND, OR 97224
VANCOUVER,WA 98683 Periodic 1
Inspector/Certification# Jason Brown Cert#OBOA 101818-7810
ACS Job#
Anchor Embedded in: Concrete
Is this a re-inspection?: o Yes Q No
Compressive Strength: 3000PSI Approved plans available?:
Q Yes 0 No
HOLE DETAIL/CONDITION Work acceptable per approved
plans?: Q Yes El No
Anchor Embed
1/2" Hole 0: 1/2" 3-3/4" Installation complies with
Size:
Depth:
manufacturer's evaluation report?: 0Yes 0 No
Holes cleaned properly?: 0 Yes ❑ No
LOCATION OF ANCHORS
Embedment per plans?:
Yes [J No
GRIDLINES (4)single 9 racks in warehouse at Lines E.3-G.5/7.1-9.1
INSTALLATION
ESR REPORT# GRIDLINES
ESR-3772 ITW REDHEAD CARBON STEEL TRUBOLT GRIDLINES
ANCHOR TYPE: WEDGE ANCHOR
EPDXY TYPE N/A IS THERE AN RFI? Q Yes 0 No
EXP. DATE: N/A RFI ATTACHED? ❑ Yes 0 No
INSPECTION DETAILS:
, Image Description:
- ` Completed ACS representative arrived on site to inspect the 1/2"ITW Redhead
Trubolt wedge anchors with 3.75"embedment using(2)anchors for
' OPP= anchor each baseplateracking approvedby 1 g
'',.c-,• of the pallet Talar Ban'a'ian with installation for Seizmic Inc.
pallet racking.
Material Handling Engineers via phone and will follow up with the letter
of approval for the change of wedge anchors from HILTI KB-TZ to
'; ' �', Redhead Trubolt.
. f, w • A torque test was performed at 45 ft/lbs per ESR-3772 and the work
performed appears to be in conformance with the manufacturers
Foreman notified of installation procedures. No known revisions.
nonconformance items? 0 Yes El No 0 N/A
Foremans Name: Luis with Total Handling Solutions
Reviewed11.--a.eb fait Date: cc:
dMil-- 03-02-2018
Bob Brown, President
ACS-1157
BB/JB
47 AR 0 2 1010
ACCREDITED
.S
SEIZMIC " - IL
Engineering
••c x;
Ml. .
SPECIAL PRODUCTS CONVEYORS STORAGE RACKS
TANK SUPPORTS TALL SUPPORTS OTHER SERVICES St/ELTAL SPECIALS PRODUCTS
MACHINERY HEADER STEEL SEI-ECTIVE SEISMIC ANALYSIS
RACK BLDGS DRIVE-IN PERMIT ACQUISITION MEMOOD SHUTTLES
SORT PLATFORM PUSH BACK VLM
SHEDS PICK MODULES A EESS APPROVALS MOVABLE CAROUSELS
MEZZANINES ROOF VERIFICATION FLOW RACK STATE
FOOTINGS CANTILEVER PRODUCT TESTING GONDOLAS ARC
LOCKERS MODULAR OFFICES
Licensed in All 50 States CATIVALKS FENCES
STRUCTURAL ADDENDUM
FOR
Western Materials
7301 SM Kable Lane#100,
Portland, OR 361009
Job# 18-0414
MAR 6, 2018
In regard to the above project, it is acceptable to use a 1/2"0 ITW Red Head Wedge anchors (ICC
ESR#3772)and 3 3/4"min embedment as an approved equal to the anchorage specified on the plans. The
number of anchors should match the approved plans and the loading will remain same.
Should there be any questions regarding the above responses,please contact me at(909)869-0989.
Sincerely,
f ��.1 D PROF 4,4.5>
71;t-/
`�� IN
Talarlra `1r
16243 „p
SEIZItiiK' Inc. '
OREGON
ti
4Z F F AZ-*
EXPIRES
isol, DEC 3 1 2019
1130 E Cypress St.,Covina CA 91724 Tel:909-869-0989/Toll-Free:877-SEIZMIC
E-mail:Enginecring!ceSeizmictnc.com