Plans (64) ` MS r 4.)t (U u c-! l*2 t14.7 5 kt-/ E-1 U reit/2 44-o:
J "RIVER TERRACE EAST"
LOT 179
HUB AND TACK CERTIFICATION
x NE & SE1/4 SEC. 6. T2S, R1 W, W.M.
CITY OF TIGAARD, WASHINGTON COUNTY. OREGON
SURVEYED FEBRUARY 6, 2018
PREPARED FOR: LOT
POLYGON NORTHWEST COMPANY
703 BROADWAY ST., SUITE 510 c
VANCOUVER, WA. 98660 <
I Lu
D
1 0
25' 1 6' PUBLIC UTILITY c0
EASEMENT 8* PUBLIC UTILITY
LOT EASEMENT U
1 178 <
a c
I
pn
"58'43*W 98.00' IY
v e iis ,2-*-120.00' 22.00 + - ir-A: ILI P . V
03 LOT
0.10
ti
1=21.99` y N89 '43"W 70.00' =21.99'
a .
s. a
SW FRIENDLY LANE
`"
o
o
st REGISTERED
5 PROFESSIONAL
LAND SURVEYOR — -
-.°*°70"1:.--r
JULY 9,
1 OREGON
I TRAVIS C.JANSEN
a' 1111.Li)
8 RENEWS:8/30/2019
S I, TRAVIS C. JANSEN, A REGISTERED PROFESSIONAL LAND SCALE
1SURVEYOR IN THE STATE OF OREGON, HEREBY CERTIFY THAT 20 0 10 20
I HAVE ACCURATELY SURVEYED AND STAKED THE OFFSETS 11116/1111111111.11111
TO THE FOUNDATION ENVELOPE FOR LOT 179 OF THE PLAT 1 INCH =20 FEET
OF "RIVER TERRACE EAST",
DRAWN BY: T2 DATE: 2/28/18 PACIFIC COMMUNITY DESIGN
,4 REVIEWED SY: TCJ DATE~ 2/28/18 PLANNING - ENGINEERING -SURVEYING
2
PROJECT NO.: _ 395-041 (503) 941-9484
G F0 DESIGN.V FIELD REPORT
Page 1 of 2
GDI Project Pol on-129-03 p y
yg Pre ared B Bret Moskal
Project Name:_ River Terrace East Date: 3/13/18
Location; SW Scholls Ferry&Roy Rogers,Bvrtn. Report#: 212
Arrival 0815; 1150 Departure: 0840' 1215
Weather: Rain, 50's Permit#: TBD
Site Visit Requested By: Ken (Polygon) Met With (on site): Ken, CCS crew
Purpose: Observe soft spot repair lots 177-179
Outstanding Issues: Proof roll road and curb base rock and repair as needed before paving
FR-58 (12/06) Decommission temporary storm and sewer lines through Tract E
FR-177 soft fill from slope cut in lots 153, 154 and 155
( -Leks-. ,' : ' .:: ,:. *Resolved 3/13/18*
excavating
During the day, I observed CCS crew in the process of rej9a1xirg soft subgrade, noted in field report 208 and 209 per
our geotechnical recommendations, utilizing an Air Knife system (see field report 208 and 209 for details).
Recommended that east side perimeter footings be additional excavated by approx. 1' to provide 5-feet of
horizontal offset between the edge of the footing and free face of the slope. Based on probe resistance,we
recommended additional excavations of soft subgrade areas ranging from 6"to 12"BGS today(see site plan and
below for details).After additional excavation, I re-evaluated the subgrade and observed the subgrade to generally
be stiff to medium stiff.
Lot 179
Additional excavation observed today;
• 7'x2'x6"
• 15'x2'x10"
Lot 178
Additional excavation observed today;
• 13'x2'x12"
• 10'x2'x6"
• 20'x2'x12"
Lot 177
Additional excavation observed today; which caves into
• 16'x2'xi 2" overexcavated footing
• 10'x2'x8" subgrades
• 20'x2'x6"
I observed that due to wet weather,there was free standing water n the surface of the footing subgrade.
Recommend footings be de-watered and any saturated/loose soil a removed f before pouring
footing. Recommend that time be limited in which footing subgrade is left exposed.
Based on our observations and probing, it is our opinion that subgrade observed today(contingent on following
recommendations noted above),where observed today and indicated on attached site plan, have been prepared in
general accordance with our geotechnical recommendations.
9450 SW Commerce Circle,Suite 300 I Wilsonville,OR 97070 1503.968.8787 I www.geodesigninc.com