Plans (51) /h,57)--c/(5---G,r -->3
C T ENGINEERING ty ` 2-2 � y/jZc4-cct i cg*,
INC 180 Nickerson St.
Suite 302
Seattle,WA 98109
(206)285-4512(V)
(206)285-06I8(F)
asolomon@ctengineering.com
BULLETIN
Date: February 19,2018 Number:CT-44 Project#: 15238
Project Name: River Terrace SF Attached: CT-44.1
Subject: Lots 24-26 (Revised Deck Post Footing Layout)
Drawings Affected:
Description/Action:
This bulletin provides response to RFI, design clarifications and/or variation requests for the 'River
Terrace SF' project located in Tigard, Oregon.
See attached detail for attaching the deck post footings to the house foundation as requested.
PR°
.<<,, NF O',
``'x -,- 60 ' U,
41,
If, 1, iii ?4,fig)
~� oREcoNk
.lh' 22,Nc'\<c<c�
'PIFs T. G0
.� TISIO —N 02/19/2018
RE
CALL WITH ANY QUESTIONS
Issued by: Arnold R. Solomon Date: Feb. 19, 2018
Distribution:
Contact Information:
Tom Dicianno Polygon Northwest Company
David Burnett Milbrandt Architects
R:\15238 River Terrace SF\Bulletins\15238_2018.02.19 CT44_Lots 24-26(Revised Deck Post Footing Layout).doc
Structural Engineers
180 Nickerson St.
CT ENGINEERING Suite 302
RIVER TERRACE SF N C. 9e8109
Project: atWA
Date:
(206)285-4512
Client: Page Number: CT-44.1 PAX
(206)285-0618
g.
CI to
•
4
J . . .. a
UT
•
0
N
N
FCO
0
LL
I
.
- _
3
Structural Engineers
� CT ENGINEERING
v. INC 180 Nickerson St.
Suite 302
Seattle,WA 98109
(206)285-4512(V)
(206)285-0618(F)
asolomon @ctengineering.corn
BULLETIN
Date: February 19,2018 Number:CT-44
Project Name: River Terrace SF Project#: 15238
Attached: CT-44.1
Subject: Lots 24-26 (Revised Deck Post Footing Layout)
Drawings Affected:
Description/Action:
This bulletin provides response to RFI, design clarifications and/or variation requests for the `River
Terrace SF' project located in Tigard, Oregon.
See attached detail for attaching the deck post footings to the house foundation as requested.
F.q° o
IN
,#0
W i
IpEC6NA
02/19/2018
CALL WITH ANY OUESTIONS
Issued by: Arnold R. Solomon
Distribution: Date: Feb. 19, 2018
Contact Information:
Tom Dicianno Polygon Northwest Company
David Burnett Milbrandt Architects
R:115238 River Terrace SF\Bulletins\15238_2018.02.19 CT44_Lots 24-26(Revised Deck Post Footing Layout).doc
Structural Engineers
C T E N G I N E E R I N G 180 Nickerson St.
INC. Suite 302
Project:
Seattle,WA
RIVER TERRACE SF
Date: 98109
Client: (206)285-4512
Page Number: CT-44.1 (206)285-0618
iI \
.\z...
a'
1
..:/III :
It x
V
Az
IQ o a
J f0
0O
N
l'Ar.----------------
N ..
W
H
J
LL
Cf)
7
Ce
d
illLtW
L12
p
z
s
Structural Engineers
FOR OFFICE USE ONLY—SITE ADDRESS:
This form is recognized by most building departments in the Tri-County area for transmitting information.
Please complete this form when submitting information for plan review responses and revisions.
This form and the information it provides helps the review process and response to your project.
City of Tigard 0 COMMUNITY DEVELOPMENT DEPARTMENT
I
Transmittal Letter
i i c ,\R D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
TO: Dianna
DATE RECEIVED:
DEPT: BUILDING DIVISION
RECEIVED
FROM: Tom Dicianno FEB 26 ZOl$
COMPANY: Polygon Northwest `=1`r TIGARD
PLANNING/ENGINEERING
PHONE: 503-577-4160
By: �C "; y J/
RE: 13427 SW Beach Plum Ter..
(Site Address) MST201 "eod b3
(Permit Number)
NW River Terrace Lot 24
(Project name or subdivision name and lot number)
ATTACHED ARE THE FOLLOWING ITEMS
CoPies: y - i
p Descr><Phon.
3 Additional set(s) of plans.
3 Cross section(s)and details. 3 Revisions: plot plan -
0 Wall bracing and/or lateral analysis.
0 Floor/roof framing. 0 Basement and retaining walls.
0 Beam calculations. 0 Engineer's calculations.
0 Other(explain):
REMARKS: Add deck to rear. Please pay fees owed with Trust Account.
-� ician: Date. FOR FF CE use ONLY
Fees Routed to Due. es Perini clinician: Initials:
❑No Fee Description: Amount Due:
( V t �i" � $ 'c
/ P/cc --
-,_ /476 $ /7,6f-
Special 7,6f-
Special l �'7= ) $ v .
,,
Instructions: �� �
Reprint Permit(per PE): El Yes
ice-." -7 . . /�
Applicant Notified: C 'J-> Date: o Done
is // Initials:
I:\Budding\Forms\TransmittalLetter-Revisions.doc 05/25/2012