Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Permit (123)
CITY OF TIGARD BUILDING PERMIT N--- .I COMMUNITY DEVELOPMENT Permit#: BUP2017-00180 TIARDD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 03/21/2018 Parcel: 2S 113BA02300 Jurisdiction: Tigard Site address: 7560 SW DURHAM RD Project: Durham Square Subdivision: 2017-013 PARTITION PLAT Lot: 2 Project Description: Building 2:New commercial building shell. Contractor: JOSEPH HUGHES CONSTRUCTION INC Owner: MISSION HOMES NORTHWEST LLC 11125 SW BARBUR BLVD PO BOX 1689 PORTLAND, OR 97219 LAKE OSWEGO, OR 97035 PHONE: 503-624-7100 PHONE: FAX: Specifics: FEES Description Date Amount Tof Use: COM C ss of Work: NEW Type of Const: VA 12%State Surcharge-Building 03/21/2018 $397,78 C'ccupancy Grp: F-2 Occupancy Load: 100 Plan Review 06/29/2017 $2,070.21 Dwelling Units: 0 DC Provision Review,COM New-Bldg 03/21/2018 $180.50 Stories: 1 Height: 0 ft DC Provision Review,COM New-Ping 03/21/2018 $180.50 Bedrooms: 0 Bathrooms: 0 Plan Review-Fire Life Safety 03/21/2018 $1,325.94 Value: $657,500 Info Process/Archiving-Lg$2.00(over 03/21/2018 $42.00 11x17) Info Process/Archiving-Sm$0.50(up to 03/21/2018 $7.50 11x17) Floor Areas: Metro Const. Excise Tax 03/21/2018 $789.00 Total Area: 10000 Additional Plan Review 03/21/2018 $200.00 Accessory Strutt: 0 Tig-Tual School CET-Non Residential 03/21/2018 $6,100.00 Basement: 0 Wash Co Trans Dev Tax 03/21/2018 $60,000.00 Carport: 0 Parks SDC Improvement 03/21/2018 $6,020.00 Covered Porch: 0 Parks SDC Reimbursement 03/21/2018 $1,087.00 Deck: 0 Plan Review 03/21/2018 $63.96 Permit Fee-COM-New Construction 03/21/2018 $3,314.84 Garage: 0 Mezzanine: 0 Total $81,779.23 Required: Required Items and Reports(Conditions) Fire Sprinkler: Yes Parapet: Fire Alarm: Yes Protected Corridors: No Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may.. -in a copy of the ru direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: .r#L_ �''` �.► . ••e Signature: --_ � Ca .639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application . -' , Commercial IUKofIKI: I :,1:0\I .1 City of Tigard Aeceived 711 DateB . „»� Permit No.: i s ' ., i' - R 13125 SW Hall Blvd.,Tigard,OR 97223 �'� r r✓l iL Phone: 503.718.2439 Fax: 503.598.1960 ] PrAtil*' ®moioverFern it:ri , iz f, Inspection Line: 503.639.4175 Fi EC J V Ready,.: _ Id See Page 2 for Internet: www.tigard-or.gov 2 ry ft Notified/Method: * 02.5 /7 r JUN 9 L U 17 ) Supplemental Information TYPE OF WORK } ®FTIt71AR. REQUIRED DATA:I-AND 2-FAMILY DWELLING New construction ❑D,.,, MING DIVISION P ., it fees*are based on the value of the work performed. ❑Addition/alteration/replacement 0 Other: Indic the value(rounded to the nearest dollar)of all equipm-,t,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indi v. ' on this application. ❑ I-and 2-family dwelling Xommercial/industrial Valuation: $ ❑Accessory building 0 Multi-family Number of bedre: , ❑Master builder 0 Other: Number of bathrooms. JOB SITE INFORMATION AND LOCATION Total number of floo • Job site address: • 5Si,. 1 1 I ! . + 1' New dwelling area: square feet City/State/ZIP: �t-+ `�`J y� J i iiy j-�.� tD 1 i 7 2.2+ Garage/carport area: s... a feet Sui ld . pt.no.: • I Project name: �1,00s Covered porch area: square - t Cross street/directions to job site: Deck area: square feet ... `... V ��► - !► ,E: ih ig►. Other structure area: square feet eAAAI L• REQUIRED DATA:COMMERCIAL-USE CHECKLIST ' L no.: 2. Permit fees*are based on the value of the work performed. Tax map/parcel no.: 2 L l' •43,144C.54:::::, ' I bd Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the KewGDESCRIPTION OF WORK ,, i work indicated on this application. K w d1MM. -Kc.I L {��,,,.t7c.::,: G 11'G i.4-. Valuations-05,v,.-1 $ 1 m'� r! ,.::.•,...... �, Existing building area: . ,� square feet C) ' s( ' New building area: 101 pp(' square feet PROPERTY OWNER (40— Number of stories: Name: t G ..A� I vimw A,.�. !`t I-,.,c. �r rType of construction: l l`� r'` Address: '1O 16O JG—_ Occupancy groups: City/State/ZIP: 1q (� _ � Phone:605. iJ$i . �.-75..8-, ,gax:( ) • 1• Existing: New: 1Z APPLICANT ONTACT PERSON . BUILDING PERMIT FEES* Business name: Net(I Se^,, .><CONTACT t Liz- �. Plea ereferr deesched t) Contact name: yt� 1�4 .-a..r--+ty tl 1►�Fi' Structural plan review fee(or deposit): Address: t � `J w A �i 1,.— � .4#to FLS plan review fee(if applicable): City/State/ZIP: "p'o •T t•, y e,p..• 97 , Total fees due upon application ) l Phone:6) .3•,'t. .444j.-•I Fax::( ) • Amount received: E-mail: "a�, 1:)11 �it7tr A,r. +t_• Co d PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* CONTRACTOR Commercial and residential prescriptive installation of roof-top mounted Photo Voltaic Solar Panel System. Business name: '00 01...-.--... :rt � J'=Gs Submit two(2)sets of roof plan with connection details ..a -. ' G+� Address: ` 7.CJ'' S ,moi and fire department access,along with the 2010 Oregon t ^ *s(� �JL-Y1). Solar Installation Specialty Code checklist. City/State/ZIP: e> i 1 f b +, • 91 19 Permit fee(includes plan review Phone:60 ./1 and administrative fees): $180.00 State surcharge(12%of permit fee): $21.60 CCB lic.: _� Total fee due upon application: $201.60 Authorized si 2. OF / df, ` This permit application expires if a permit is not obtained g within 1S0 days after it has been accepted as complete. 'ntname: aI -" V t't r 1 S •may Date: . St• t * Fee methodology set by Tri-County Building Industry+ � Service Board. 'g\Permits\BUP-COM PermitApp.doc 02/2412011 440-4613T(11/02/COM/WEB) Albert Shields From: Albert Shields Sent: Thursday,July 06, 2017 3:45 PM To: DavidB@DBAArch.com Cc: Jonny Gish Subject: Durham Square, BUP2017-00180 & -00181. David, these two permit applications have been submitted prematurely. Actually,they should not have even been taken in for review until after the first redlines for PFI2017-00110. Accordingly, I will code these two applications as "Approved but Not Released." Plan Review will proceed but otherwise the applications will be on hold until the first redlines. Please let me know if you have any questions. Albert Shields 503-718-2426 1 August 30, 2017 RE: NEW BUILDING Project Information Building Permit: BUP2017-00180 Construction Type: 5A Address: 7560 SW Durham Occupancy Type: F2 Area: 10000 Sq Ft. Stories: 1 Name: Durham Square Sprinklers: Yes The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 2014 edition; 2014 Oregon Fire Code. Please respond to conditions below. 1) Provide complete and accurate code summary. 2) Provide Corn Check document for insulation. When responding, provide an itemized letter stating in what way each numbered issue has been addressed in the revision. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respectfully, Dan Nelson Senior Plans Examiner (503) 718-2436 dann@tigard-or.gov Dan Nelson From: Albert Shields Sent: Monday, October 23, 2017 2:51 PM To: Dan Nelson; Dianna Howse;#Building Permit Technicians Cc: Monica Bilodeau Subject: Durham Square, SIT2017-00016 & -00017, BUP2017-00180 & -00181 FYI, all the requisite Conditions of Approval have been met for Durham Square so I have signed off on the 2 SITs and 2 BUPs. Dan,the SIT folders are at your desk. You have the BUPs already? Albert Shields Permit Coordinator City of Tigard Albert(atigard-or.gov 503-718-2426 DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained by the City of Tigard in compliance with the Oregon Administrative Rules "City General Records Retention Schedule." 1 14 TDT Estimate Durham Square Building 2 9/27/2017 7560 SW Durham Rd. AMS TDT RATES EFFECTIVE 7/1/17 _ TSDC CITYWIDE&TSDT RT OVERLAY RATES EFFECTIVE 7/1/17 INSIDE RIVER TERRACE TSDC CITYWIDE EFFECTIVE 7/1/17 0 Yes Project is in River Terrace ? 0 No Former Use Rate Type Use# ITE Code #Units Rate TDT Amount Description TDT 1 $0 Vacant Land TSDC-Imp 1 $0 TSDC-Reim 1 $0 TSDC-RT 1 $0 Total TDT and TSDCs Former Uses $0 Proposed Use Use# ITE Code #Units Rate TDT Amount Description TDT 1 110 10 $6,000 $60,000 10,000sf light industrial TSDC-Imp 1 $0 TSDC-Reim 1 $0 TSDC-RT 1 $0 TDT 2 $0 TSDC-Imp 2 $0 TSDC-Reim 2 $0 TSDC-RT 2 $0 Total All TDTs&TSDCs Proposed Uses $60,000 Less: Total All TDTs&TSDCs Former Uses $0 Total All TDTs&TSDCs Net Increase $60,000 Total Net County TDT $60,000 Total Net TSDC-Imp $0 Total Net TSDC-Reim $0 Total Net TSDC RT Overlay $0 $60,000 TDT TSDC Imp+ Reim Target Recovery Rate 28.0% 30% Estimated Total Impact $214,286 $0 Estimated Unmitigated Impact $154,286 $0 All TDT&TDSC TSDC RT Overlay Target Recovery Rate 28% 30% Estimated Total Impact - $214,286 $0 Estimated Unmitigated Impact $154,286 $0 TDT=County Transportation Development Tax TSDC Citywide=City of Tigard Transportation System Development Tax(TSDC-Imp&TSDC-Reim) TSDC RT=River Terrace Transportation System Development Tax Overlay Parks Estimate Durham Square Building 2 9/27/2017 7560 SW Durham Rd. AMS ALL PARKS RATES EFFECTIVE 7/1/17 I Q Yes Project is in River Terrace ? ® No i Note:All Neigh-Imp# Units entries=0 if project is in River Terrace; All Neigh-RT# Units entries=0 if project is elsewhere in the city. Former Use Rate Type Use# ITE Code #Units Rate Parks Amount Description Parks-Imp 1 $421 $0 Vacant Land Parks-Reim 1 $76 $0 0 Neigh-Imp 1 $0 $0 0 Neigh-RT 1 $0 0 2 $0 Total Parks Former Uses $0 Proposed Use Use# ITE Code #Units Rate Parks Amount Description Parks-Imp 1 110 14.3 $421 $6,020 10,000sf light industrial Parks-Reim 1 110 14.3 $76 $1,087 0 Neigh-Imp 1 110 14.3 $0 $0 0 Neigh-RT 1 $0 0 Parks-Imp 2 $0 0 Parks-Reim 2 $0 0 Neigh-Imp 2 $0 0 Neigh-RT 2 $0 0 Total Parks Outside RT Proposed Uses $7,107 Less: Total Parks Outside RT Former Uses $0 Total All Parks Outside RT Net Increase $7,107 Total Parks RT Proposed Uses $0 Less: Total Parks RT Former Uses $0 Total All Parks RT Net Increase $0 Total Parks-Imp $6,020 Total Parks-Reim $1,087 Total Neigh-Imp $0 $7,107 Total Neigh-RT $0 For Non-Residential Calculations: Prior Use: =###sf/EE; #####/###=EEs. Proposed Use: Light Industrial=700sf/EE; 10,000/700=14.3EEs. Parks-Imp=Parks Improvement,Citywide including River Terrace Parks-Reim=Parks Reimbursement,Citywide including River Terrace Neigh-Imp=Neighborhood Parks Improvement Outside River Terrace Neigh-RT=Neighborhood Parks Improvement Inside River Terrace City of Tigard a COMMUNITY DEVELOPMENT DEPARTMENT IIIC T I G A R D Building Permit Review — Commercial - With Land Use Building Permit #: 81.4r /7- l tTO Site Address: IS O Q S 1 1 1v c h c'i ✓n Suite/Bldg#: 2— Project Name: O v f V 1 cI M S ci re._ (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review P Proposal: N�/W ioU it 03 ,z Verify site address/suite# exists and active in permit system. River Terrace Neighborhood: ❑ Yes No Land Use Case#: `S 2.0 ( 6 � i IPlans Match Approved Land Use: Site Plan Landscape Plan ❑ Other: Urban Forestry Plan 7 .Elevation Plan adding Height: Maximum Height 1 S al Height 30 I/Conditions Met: ❑ Prior to Submittal ❑ "rior to Permit Issuance Businos T:eet Exists: ❑ Yes ❑ No,applicant notified to obtain business license /Public Facilities Improvement (PFI) Permit: pp , 2.011 dC)I I 0 Required: COes,applicant was notified ❑ No Applied For: / Yes ❑ No, stop intake Notes: CO 111 +1 kj 11 3 ( e)rY)C4 t') 1n Approved by Planning: /1-i 9 12,7 c Date: 6) 2_9/ 7 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: (/ /i 7 Site Plans: # 3 Building Plans: # 3 Building Permit#: 111. ��te--r building permit#above. Workflow Routing: a•--li arming Ineering Coordinatorui ing Workflow Sign-off: +L�A'S �'-off for Planning(include notes from planning review) Route Application Documents: le-Building: original permit application, site plans,building plans, engineer and beam calculations and trust details,if applicable, etc. Notes: By Permit Technician: , Date: 7 /;—://.2 I:\Building\Forms\BldgPennitRvw_COM_WithLandUse 070915.docx Engineering Review ❑ Slope at building pad: /1/61" Show I„ ❑ PFI Permit#: fi/?Q/-7-00 UO ❑ Conditions "Met"prior to issuance of building permit ❑ Easements (encroachments) per engineering conditions of approval and plat (not typical on SDR/CUP) ❑ Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes ❑ No Assess Water Quantity Fee in-lieu: ❑ Yes ❑ No LIDA Facility on lot: ❑ Yes ■ ` • X. NOT Approved by Engineering: .�� Date VG/7 Notes: //GFS/ o f .oa.5 7;rS7 red�iji+C /��-s i► - �V 6Ki�it� ���i+�.' rssaanl`� J �/ Approved by Engineering: Date: Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ) Ckpproved,NOT Released: 04.e, C �jl[ rl ate: lY Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: 04111C Fees Entered: Wash Co Trans Dev Tax: (es ❑ N/A Tigard Trans SDC: ❑ Yes /A Parks SDC: .Yes ❑ N/A K to Issue Permit Approved by Permit Coordinator: itiate: / a J-' I:\Building\Fonns\B1dgPennitRvw_COM_W ithLandUse_070915.docx FOR OFFICE USE ONLY-SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. UPICity of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT _ ■ • Transmittal Letter I ( n R l) 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: . DATE _ ..; DEPT: BUILDING DIVISION SEP 2 7 2017 So FROM: . Ik ) '/► zo 4i�i�aPAI i✓A"ll OP i(t i LI COMPANY: illb A BUILDING i . I l /J� /1 PHONE: _,.5.:) . - -5L+- 0244 4 By: 97 RE: 7iCcrAd ass) 1 �� '5'� 1)(T'7-'.i ,umier -L.\) e © ',10•BU rojectaik-hvn "666(e) ‘ name or subs d4�sion ha�►e Rifflot number) � j�� ATTACHED ARE THE FOLLOWING ITEMS: Copies: Description: Copies: Description: Additional set(s)of plans. Revisions: Cross section(s) and details. Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. -� Beam calculations. Engin- -r's alculations. Other(explain): `►t1�- 1 A Iga- ,'A 4., 'Ti i zf , __IK REMARKS: FOR C.F.FICE USE ONLY Routed to Permit Technician: ate: I l'Zl (7 Initial . Fees Due: ❑ Yes o Fee Description: Amount e: $ $ $ Special Instructions: Reprint Permit(per PE): [] Yes ❑ No 0 Done Applicant Notified: Date: Initials: I:\Building\Forms\TransmittalLetter-Revisions 061316.doc City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 Location: Inspection Date: 7560 SW DURHAM RD, TIGARD, OR, 97224 Record Type: Record ID: Commercial - Building BUP2017-00180 Inspection Type: Inspector: 299 Final inspection Jeff Grove Result: PASS - CofO Comments: Violation Summary: Inspector Contractor