Loading...
Report 11\5\-cgt)!(e ObLibS C T ENGINEERING 180 Nickerson St. INC Suite 302 Seattle,WA 98109 (206)285-4512(V) (206)285-0618(F) asolomon@ctengineering.com • BULLETIN Date: February 13,2018 Number:CT-43 Project#: 15238 Project Name: River Terrace SF Attached: None Subject: Rebar at Top of Concrete Stem Walls (All SF Plan Types) Drawings Affected: Description/Action: This bulletin provides response to RFI, design clarifications and/or variation requests for the `River Terrace SF' project located in Tigard, Oregon. For all single-family plan types, (1)#4 horizontal bar is required at the top of the concrete stem walls for where the floor joists are perpendicular or parallel to the stem wall. O'p PRp; , (.3..(04% ?;11\16040.- Lu •REG6N4A . 22, F� -(FS T. 02/13/2018 CALL WITH ANY QUESTIONS Issued by: Arnold R. Solomon Date: Feb. 13, 2018 Distribution: Contact Information: Tom Dicianno Polygon Northwest Company David Burnett Milbrandt Architects R:\15238 River Terrace SF\Bulletins\15238_2018.02.13_CT43_Rebar at Top of Concrete Stem Walls(All SF Plan Types).doc Structural Engineers