Date: February 13,2018 Number:CT-43 Project#: 15238
Project Name: River Terrace SF Attached: None
Subject: Rebar at Top of Concrete Stem Walls(All SF Plan Types)
Drawings Affected:
Description/Action:
This bulletin provides response to RFI, design clarifications and/or variation requests for the `River
Terrace SF' project located in Tigard, Oregon.
For all single-family plan types, (1)#4 horizontal bar is required at the top of the concrete stem walls
for where the floor joists are perpendicular or parallel to the stem wall.
PR°
4c,�G NF �t,
41;1:—it
RECONA
22
ze02/13/2018
CALL WITH ANY OUESTIONS
Issued by: Arnold R. Solomon Date: Feb. 13, 2018
Distribution:
Contact Information:
Tom Dicianno Polygon Northwest Company
David Burnett Milbrandt Architects
R:\15238 River Terrace SF\Bulletins\15238_2018.02.13_CT43_Rebar at Top of Concrete Stem Walls(All SF Plan Types).doc
Structural Engineers
EODESIGNY. FIELD REPORT
Page l of-i
GDI Project: Polygon-129-03 Prepared By: Kaden Kinser
Project Name: River Terrace East Date: 10/31/17
Location: SW Scholls Ferry&SW Roy Rogers, Report#: 176
Beaverton
Arrival: 1415 Departure: 1445
Weather: Clear, 60's Permit#: TBD
Site Visit Requested By: Tom (Polygon) Met With (on site): Tom
Purpose: Observe Footing Subgrade Lots 201-207
Outstanding Issues: Proof roil road and curb base rock and repair as needed before paving
FR-58 (12/06) Decommission temporary storm and sewer lines through Tract E
FR-163 Deflection in roadway
Suborade
Upon my arrival I was directed to observe building subgrade for lots 201-207. I observed the subgrade for lots 205,
206 and 207 consist of brown silt while I observed the subgrade of lots 201, 202, 203 and 204 consist of brown
subgrade with a 1-2"top layer of%"-0 crushed rock. I used a%z"foundation probe to test the relative density of the
subgrade. Upon probing the subgrade appeared to be stiff(1-3"of penetration).
Based on observations and probing it is our opinion that the subgrade observed today has been prepared in general
accordance with our geotechnical recommendations.
Distribution:
Attachments:Site Plan (1)
Reviewed by:
This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and
specifications throughout the duration of the project irrespective of the presence of our representative.Our work does not include supervision or direction of the contractor,the contractor's employees
or agents.Our firm is n*tretportsible for site safety.This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations,The report can only be
considered final upon reiriewofthe;GeoDesign project manager,as indicated by Initials in the'Reviewed at section.
Signature:
15575 SW Sequoia Parkway,Suite 100 I Portland,OR 97224 I Off 503.968.8787 I Fax 503.968.3068