Permit (73) CITY OF TIGARD BUILDING PERMIT
COMMUNITY DEVELOPMENT Permit#: BUP2018 00032
T[ ARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 03/12/2018
Parcel: 1 S 136CD01000
Jurisdiction: Tigard
Site address: 11745 SW PACIFIC HWY 100
Project: 4 Wheel Parts Subdivision: None Lot: None
Project Description: Interior demo for TI.
Contractor: DRIVE 923 LLC Owner: MONAGHAN FARMS, INC
475 NW 400 RD 1950 E PRETICE AVE, STE 101
WARRENSBURG, MO 64093 GREENWOOD VILLAGE, CO 80111
PHONE: 816-600-4416 PHONE:
FAX:
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: DEM Type of Const: VB Permit Fee-Additions,Alterations, 03/12/2018 $377.90
Demolition
Occupancy Grp: B Occupancy Load: 49
12%State Surcharge-Building 03/12/2018 $45.35
Dwelling Units: 0 Plan Review
Stories: 0 Height: 0 ft 02/27/2018 $245.64
Info Process/Archiving-Lg$2.00(over 03/12/2018 $2.00
Bedrooms: 0 Bathrooms: 0 11x17)
Value: $20,000
Floor Areas:
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $670.89
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a coo.v of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
)
Issued By: '1
"►
fi
.e--
Permittee Signature:
_ rr
1 503.639.4175 by 7:00 a.m.for the next available inspection date.- ...`
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
Building Permit Application
Commercial . : -/ ,-. .-,- _4
City of Tigard � �'� �'
Received
13125 SW Hall Blvd.,Tigard,OR 97223 `4
Date/By: Permit No.:
Phone: 503-718-2439 Fax: 503-598-1 TAG �:. Plan Review ��
T 1 C,A R D Inspection Line: 503-639 4175 Date/By: 3-� 8-1 Related Permit:
Internet: Line:www.tigard-or.gov ° ate Ready/By: _
A
- kY gpi Notified Method: F Jam` ® See Page 2 for
`t � /�i/ Supplemental Information
TYPE OF WORI{
0 New construction REQUIRE i DATA:1-AND 2-FAMILY DWELLING
0 Demolition Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
❑Addition/alteration/replacement 0 Other:
equipment,materials,labor,overhead,and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
❑ 1-and 2-family dwellingValuation: f $ ,.R4(500❑Commercial/industrial
❑Accessory building 0 Multi-family Number of bedrooms:
❑Master builder 0 Other: Number of bathrooms:
JOB SITE FORMATION AND LOCATION
Total number of floors:
Job site address: / 7 ' s L 6r) r 1
IC New dwelling area: square feet
City/State/ZIP: t- '
IR
it ` Garage/carport area:
Suite/bldg./apt.#: 4,4, Project name: Y AIIF/IIIIIIIsquare feet
Cross street/directions to job site: v Covered porch area: square feet
Deck area: square feet
Other structure area: square feet
Subdivision: REQUIRED DATA:COMMERCIAL-USE CHECKLIST
Lot#: Permit fees*are based on the value of the work performed.
Tax map/parcel#: Indicate the value(rounded to the nearest dollar)of all
DESCRIPTION OF equipment,materials,labor,overhead,and the profit for the
/' work 1
work indicated on this application.
fl ) Valuation:
Existing building area: square feet
El New building area: square feet
PROPERTY OWNER 1 0 TENANT
Number of stories:
Name:
Address:
Type of construction:
City/State/ZIP: Occupancy groups:
Phone:( ) Existing:
Fax:( )
❑ APPLICANT New:
❑ CONTACT PERSON BUILDING PERMIT FEES*
Business name: ` t'tl1� yL ��jl{
j�,�^ l /is . (Please refer to fee schedule
Contact name: J 14 V\ , )y,' Structural plan review fee(or deposit):
Address: V ?QQR FLS plan review fee(if applicable):
City/State/ZIP: 1 4,/ 1 uobtAr.Y °r lO i} Total fees due upon application:
Phone: � t
ik
Amount received:
`
� ��') �� 007 Fax: ( )
E-mail. S'iVIJ]t, �r C) no PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
C�ONTRACTOR Commercial and residential prescriptive installation of
Business name: 2,,y_. y3 roof-top mounted Photovoltaic Solar Panel System.
Submit two(2)sets of roof plan with connection details
Address: it �� and fire department access,along with the 2010 Oregon
l_ /�r.l
City/State/ZIP: Solar Installation Specialty Code checklist.
Z.,rrs' f 1 1 6:41)? Permit fee(includes plan review
Phone:(, )6 ) �, �;�� Fax:( ) and administrative fees): $180.00
CCB Lic.: s ��� State surcharge(12%of permit fee): $21.60
ill Total fee due upon application:
Authorized signature: "— $201.60
O.
This permit application expires if a permit is not obtained
within 180 days after it has been accepted as complete.
r) Date: :' ' 1 1/ * Fee methodology set by Tri-County Building Industry
kW Service Board.
I:\Building\Permits\BUP COM_PermitApp.doc Rev.04/21/2014
440-4613T(11/02/COM/WEB)
City of Tigard • COMMUNITY DEVELOPMENTDEPARTMENT
t Plan
Accessibility: Barrier Removal Improvement
_ Multi-Family - Additions or Alterations
Commercial & Huard-or.�ov
TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 . .x,�x,w
REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241.
(1) Every project for renovation,alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains are readily accessible to individuals with disabilities unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five percent(25%).
VALUATION: Total of all renovation,alteration or modification being done, [1] $
excluding painting and wallpapering:
MULTIPLIER(25%barrier removal requirement):
x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $
ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order:
(a) Parking
(b) An accessible entrance:
(c) An accessible route to the altered area: $
(d) At least one accessible restroom for each sex or a single unisex
restroom:
(e) Accessible telephones:
(f) Accessible drinking fountains:and, $
(g) When possible,additional accessible elements such as storage and
alarms:
TOTAL(shall equal line [2] of Valuation Computation): $
I:\Building\Permits\BUP_COM_PermitApp.doc Rev.12/18/2014
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
Plan Submittal Requirements
T i c n R v Commercial & Multi-Family - New, Additions or Alterations
13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
1. SITE PLAN (3) copies - fully dimensional, drawn to scale and labeled with:
A. 0 map&tax lot# 0 project name 0 site address
0 suite number
0 zoning ❑ applicant name 0 phone number
B. North arrow.
C. Scale (architectural or engineering only).
D. Street names.
E. Setbacks.
F. Parking,including disabled access.
G. Finished floor elevations.
2. EROSION CONTROL PLANS AND DETAILS.
3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of
plans required based on submittal type (no redlines or tape-ons accepted).
All details listed below shall be incorporated into the plans:
A. Scale (architectural or engineering only).
B. Foundation plan.
C. Floor plan(s).
D. Cross sections.
E. Reflective ceiling plan.
F. Seismic bracing detail for suspended ceiling.
G. Roof plan.
H. Exterior elevations.
I. Structural calculations,plans, details and specifications.
J. Accessibility barrier removal worksheet.
K. Deposit- based on valuation of project.
4. ADDITIONAL INFORMATION AS FOLLOWS:
A. Fire Department Building Survey with (1) additional full set of architecture
drawings.
I:\Building\Permits\BUP_COM_PennitApp.doc Rev.12/18/2014
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
p Plan Submittal Requirements Matrix
'
Commercial & Multi-Family - New, Additions or Alterations
T1 GA RD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
Type of Submittal # of Plans
(Includes new,additions and alterations) Required at
Submittal
Demolition Permit 2
(site plan is required showing location and square footage
of all buildings to be demolished,erosion control plan and
tree protection,if applicable)
Site Work 3
(must include location of all accessible parking)
Plumbing (site utilities) 2
Building 3
Fire Protection System 3
Mechanical 2
Plumbing (building fixtures) 2
Electrical 2
Solar Photovoltaic 2
(Requires check list for prescriptive installation. If not
prescriptive installation,engineering is required.)
Plan review is dependent upon submittal of a completed application and plans.
After plan review approval,the Plans Examiner will contact the applicant to request
additional sets of plans for distribution purposes (for contractor, City of Tigard,Washington
County, and Tualatin Valley Fire&Rescue),if applicable.
I:\Building\Pemuts\BUP_COM_PemutApp.doc Rev.12/18/2014
City of Tigard
13125 SW Hall Blvd.
Tigard, OR 97223 Tel: 503.718.2439
Location: Inspection Date:
11745 SW PACIFIC HWY 100, TIGARD,
OR, 97223
Record Type: Record ID:
Commercial - Building BUP2018-00032
Inspection Type: Inspector:
299 Final inspection Jeff Grove
Result:
PASS - NoCofO
Comments:
Violation Summary:
Inspector Contractor