Report (26) til 5 T. />-- GEODESIGNz FIELD REPORT Page 1 of 2 GDI Project: Polygon-i 29-03 Prepared By: Kyle Hanson Project Name: River Terrace East Date: 2/15/18 Location: SW Scholls Ferry&Roy Rogers, Bvrtn. Report#: 202 Arrival; 1000 Departure: 1200 Weather: Overcast, 40s Permit#: TBD Site Visit Requested By: Spencer(NEI); Ken (Polygon) Met With (on site): Keywest crew, NEI Crew, ISpencer(phone), Ken (phone) Purpose: Observe wall backfill/ ubgrade and Lot 65 Outstanding Issues: Proof roll road and curb base rock and repair as needed before paving FR-58 (12/06) Decommission temporary storm and sewer lines through Tract E FR-177 soft fill from slope cut in lots 153, 154 and 155 Wail backfill and subgrade observation Upon arrival, I observed Keywest crew placing Lock+Load blocks and backfilling where indicated on the attached site plans. I was informed that backfill material was %" minus crushed rock sourced for Baker(Farmington). Compaction efforts were completed utilizing a large walk behind plate compactor. Using a Troxler 3430 nuclear density gauge, I tested the density of the granular backfill and compared the results against a lab produced proctor(ASTM D1557) value of 127.2pcf at 13.6 percent optimum moisture content. Areas tested met or exceeded our compaction recommendations of 95%compaction of maximum dry density value. I also observed additional subgrade for the same wail which had been prepared by NEI crew(see site plan). NEI crew informed me that 6"to 1' of crushed rock base would be placed over the subgrade,which appeared to consist of brown sandy silt. I used a1/2"diameter steel foundation probe to evaluate the consistency of the subgrade material and observed probe penetrations indicated generally medium-stiff to stiff subgrade conditions today. Lot 65 I observed base/subgrade for lot 65 (see site plan); crew informed me that approximately 6"to 1' of%"-0 crushed rock from Baker had been placed over subgrade, and the stepped areas at the lot's N end had approx. 2' of backfill (see site plans). Probe penetrations with a%2"diameter steel foundation probe indicated generally stiff subgrade conditions today through the granular base. Pin resistances of the 1 foot thick backfill were observed. The number of one-handed blows required to drive a 3/"diameter steel foundation probe 1 foot into the crushed rock indicated dense base conditions today. Using a Troxler 3430 nuclear density gauge, I tested the density of the granular backfill at stepped areas and compared the results against a lab produced proctor(ASTM D1557)value of 127.2pcf at 13.6 percent optimum moisture content. Areas tested met or exceeded our compaction recommendations of 95% compaction of maximum dry density value. Conclusion Based on observations, density testing, probing, and pin resistance, it is our opinion that Lot 65 base/subgrade and wall backfill/subgrade observed today, where indicated on the attached site plans, have been/are being prepared in general accordance with our geotechnical recommendations. 9450 SW Commerce Circle,Suite 300 I Wilsonville,OR 97070 1503.968.8787 I www. eo design�i g nc.com GEODES1GNN FIELD REPORT Page 2 of 2 Distribution: Attachments: Site Plan (2); NDGD(1) Reviewed by: This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services. We rely on the contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of our representative. Our work does not indude supervision or direction of the contractor,the contractor's employees or agents, Our firm is not responsible for site safety This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations.The report can only be considered final upon review of the GeoDesign project manager,as indicated by initials in the"Reviewed By"section, Signature: 9450 SW Commerce Circle,Suite 300 I Wilsonville,OR 97070 I 503.968.8787 I www.geodesigninc.com 1' "RIVER TERRACE EAST' LOT 65 i6_,/ Z y HUB AND TACK CERTIFICATION A 17- ear ,,\-.t el NEFcSE1/4SEC. 6. T2S, R1 W, W.M, CITY OF TIGARD, WASHINGTON COUNTY, OREGON 7 SURVEYED JANUARY 29, 2018 PREPARED FOR: SW LARKSPRING ST POLYGON NORTHWEST COMPANY 703 BROADWAY ST., SUITE 510 — VANCOUVER, WA. 9860In — — 6/ 150.00' �, ... ._.� _ 7 -4----4 - - ' / 77--- '0 l 6 PUBLIC UTILITY EASEMENT . `,_.__, ._ 1 b «; v a I "' 4.79' -r-5.21' LOT h LOT LC?T 64 65 66 7. ® 0 z 0 0 Q REGISTERED 8 PROFESSIONAL ; ui 'LP LAND SURVEYOR `'� cv 4t. zi \ . F. .4°P*'11/17\--tef r) S89'58'43"E 50.00' < OREGON JULY 9,2002 TRAVIS C.JANSEN o 57751 (rii; 0 RENEWS:6/3012019 co I, TRAVIS C. JANSEN, A REGISTERED PROFESSIONAL LAND SCALE SURVEYOR IN THE STATE OF OREGON, HEREBY CERTIFY THAT 2° 0 10 20 g I HAVE ACCURATELY SURVEYED AND STAKED THE OFFSETS TO T_HE FOUNDATION ENVELOPE FOR LOT 65 OF THE PLAT 1 INCH 20 FEET OF 'RIVER TERRACE EAST", e DRAWN BY: 12, DATE: 2/ 118 PACIFIC commuNinf DESIGN . REVIEWED BY: TI J DATE: 2/1/18 PROJECT NO.: k 395-041 PLANNING - ENGINEERING•- SURVEYING (503) 941-9484