Report (34) I,1 o/7eatio -c2z-7
(Stv /q,
1'- COMcheck Software Version 4.0.5.5
Envelope Compliance Certificate
Section 1: Project Information
l.,f; ;I 7017
Energy Code:2014 Oregon Energy Efficiency Specialty Code
Project Title:
Project Type: New Construction i
Envelope Compliance Method: Simplified Trade-Off
Construction Site: Owner/Agent: Designer/Contractor:
Building Location(for weather data): Durham,Oregon
Climate Zone: 4c
Vertical Glazing/Wall Area Pct.: 18%
Skylight Glazing/Roof Area Pct.: 0%
Building Use:Area Type Floor Area
1-This area does not include the"Covered Play",which is 16600
unconditioned open space.(School/University):Nonresidential
Section 2: Envelope Assemblies and Requirements Checklist
Envelope PASSES:Design 4%better than his. ;.
Envelope Assemblies:
Component Name/Description Gross Cavity Cont. Proposed Budget
Area or R-Value R-Value U-Factor U-Factor(a)
Perimeter
Exterior Wall-SouthFacing-Siding+Wood Stud:Wood-Framed, 2708 21.0 8.0 0.039 0.064
16"o.c.,[Bldg.Use 1 -This area does not include the"Covered
Play",which is unconditioned open space.]
Window-SouthFacing:Vinyl/Fiberglass Frame,Pert.Specs.: 673 --- --- 0.290 0.350
Product ID TBD,SHGC 0.27,[Bldg.Use 1 -This area does not
include the"Covered Play",which is unconditioned open space.]
(b)
Exterior Wall-NorthFacing-Siding+Wood Stud:Wood-Framed, 3578 21.0 8.0 0.039 0.064
16"o.c.,[Bldg.Use 1 -This area does not include the"Covered
Play",which is unconditioned open space.]
Window 2:Vinyl/Fiberglass Frame,Pert.Specs.: Product ID TBD, 862 --- --- 0.290 0.350
SHGC 0.27,[Bldg.Use 1 -This area does not include the
"Covered Play",which is unconditioned open space.](b)
Exterior Wall-EastFacing-Siding+Wood Stud:Wood-Framed,16" 3778 21.0 8.0 0.039 0.064
o.c.,[Bldg.Use 1 -This area does not include the"Covered
Play",which is unconditioned open space.]
Window 3:Vinyl/Fiberglass Frame,Pert.Specs.:Product ID TBD, 474 --- --- 0.290 0.350
SHGC 0.27,[Bldg.Use 1 -This area does not include the
"Covered Play",which is unconditioned open space.](b)
Exterior Wall-WestFacing-Siding+Wood Stud:Wood-Framed, 16" 3636 21.0 8.0 0.039 0.064
o.c.,[Bldg.Use 1 -This area does not include the"Covered
Play",which is unconditioned open space.]
Window 4:Vinyl/Fiberglass Frame,Perf.Specs.:Product ID TBD, 476 --- --- 0.290 0.350
SHGC 0.27,[Bldg.Use 1 -This area does not include the
"Covered Play",which is unconditioned open space.](b)
Roof-Building:Insulation Entirely Above Deck,[Bldg.Use 1 11475 --- 29.0 0.034 0.048
-This area does not include the"Covered Play",which is
unconditioned open space.]
Skylights:Metal Frame:Glass,With Curb,Perf.Specs.:Product ID 39 --- --- 0.490 0.600
TBD,SHGC 0.49,[Bldg.Use 1 -This area does not include the
"Covered Play",which is unconditioned open space.](b)
Project Title: Report date: 08/21/17
Data filename:\\Sacdatal\volume2\Users\LG\Projects\Tigard-Tualatin Durham Center\Report\COMcheck\DurhamCenter.cck Page 1 of 3
Floor-Building-Slab on Grade:Slab-On-Grade:Unheated,[Bldg. 11300
Use 1 -This area does not include the"Covered Play",which is
unconditioned open space.]
(a)Budget U-factors are used for software baseline calculations ONLY,and are not code requirements.
(b)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation.
In the following requirements,blank checkboxes identify requirements that the applicant has not acknowledged as being met.Checkmarks
identify requirements that the applicant acknowledges are met or excepted from compliance. 'Plans reference page/section'identifies where in
the plans/specs the requirement can be verified as being satisfied.
Fenestration Product Rating:
. 1. U-factors of fenestration products(windows,doors and skylights)are determined in accordance with NFRC 100 by an accredited,
independent laboratory,and labeled and certified by the manufacturer or are determined using the commercial size category values
listed in Chapter 15 of the 2009 ASHRAE Handbook of Fundamentals,Table No.4 and shall include the effects of the window frame.
The temporary label afixed to the fenestration products must not be removed prior to inspection.
Exception(s):
Site-built fenestration products shall have a single certificate specifying glazing type,special coatings,spacers,gas fills,
center-of-glass and overall U-factor,and center-of-glass SHGC for every type of site built glass used.These certificates shall be
maintained on the jobsite and made available to the inspector.
Plans reference page/section:
al 2. Solar heat gain coefficient(SHGC)of glazed fenestration products(windows,glazed doors and skylights)shall be determined in
accordance with NFRC 200 by an accredited,independent laboratory,and labeled and certified by the manufacturer or be determined
using the Solar Heat Gain Coefficients(SHGC)in Chapter 15 of the 2009 ASHRAE Handbook of Fundamentals,Table No.10.The
overall values must consider type of frame material and operator for the SHGC at normal incidence.
Exception(s):
Site-built fenestration products shall have a single certificate specifying glazing type,special coatings,spacers,gas fills,
center-of-glass and overall U-factor,and center-of-glass SHGC for every type of site built glass used.These certificates shall be
maintained on the jobsite and made available to the inspector.
Plans reference page/section:
Air Leakage, Insulation, and Component Certification:
ai 3. Sealing of the building envelope.Openings and penetrations in the building envelope are sealed with caulking materials or closed with
gasketing systems compatible with the construction materials and location.Joints and seams are sealed in the same manner or taped
or covered with a moisture vapor-permeable wrapping material.Sealing materials spanning joints between construction materials allow
for expansion and contraction of the construction materials.
Plans reference page/section:
4. Window and door assemblies.The air leakage of window and sliding or swinging door assemblies that are part of the building envelope
are determined in accordance with AAMA/WDMA/CSA 101/I.S.2/A440,or NFRC 400 by an accredited,independent laboratory,and
labeled and certified by the manufacturer.
Exception(s):
Site-constructed windows and doors that are weatherstripped or sealed in accordance with Section 502.4.3.
Plans reference page/section:
5. Curtain wall,storefront glazing and commercial entrance doors.Curtain wall,storefront glazing and commercial-glazed swinging
entrance doors and revolving doors are tested for air leakage in accordance with ASTM E 283.For curtain walls and storefront glazing,
the maximum air leakage rate is 0.3 cubic foot per minute per square foot of fenestration area.For commercial glazed swinging
entrance doors and revolving doors,the maximum air leakage rate is 1.00 cfm/ft2 of door area.
Exception(s):
Requirement is not applicable.
Plans reference page/section:
vj 6. Building thermal envelope insulation.An R-value identification mark is applied(by manufacturer)to each piece of insulation 12
inches or greater in width.Alternately,the insulation installers have provided a signed,dated and posted certification listing the type,
manufacturer and R-value of insulation installed.Refer to code section for blown or sprayed insulation installation/settling depths and
marker requirements.
7. Insulation mark installation.Insulating materials are installed such that the manufacturer's R-value mark is readily observable upon
inspection.
E(8. Insulation product rating.The thermal resistance(R-value)of insulation has been determined in accordance with the U.S.FTC R-value
rule.
af 9. Installation.All material,systems and equipment are installed in accordance with the manufacturer's installation instructions and the
International Building Code.
Project Title: Report date: 08/21/17
Data filename:\\Sacdatal\volume2\Users\LG\Projects\Tigard-Tualatin Durham Center\Report\COMcheck\DurhamCenter.cck Page 2 of 3
u/10.Outdoor air intakes and exhaust openings.Stair and elevator shaft vents and other outdoor air intakes and exhaust openings integral
to the building envelope shall be equipped with not less than a Class I motorized,leakage-rated damper with a maximum leakage rate
of 4 cfm per square foot at 1.0 inch water gauge when tested in accordance with AMCA 500D.Stair and shaft vent dampers shall be
capable of being automatically closed during normal building operation and interlocked to open as required by fire and smoke detection
systems.
Exception(s):
❑ Requirement is not applicable.
Plans reference page/section:
❑ 11.Loading dock weatherseals.Cargo doors and loading dock doors are equipped with weather seals to restrict infiltration when vehicles
are parked in the doorway.
Exception(s):
Requirement is not applicable.
Plans reference page/section:
0/12.Recessed lighting.Recessed luminaires installed in the building thermal envelope are sealed to limit air leakage between conditioned
and unconditioned spaces.All recessed luminaires are IC-rated and labeled as meeting ASTM E 283.All recessed luminaires are
sealed with a gasket or caulk between the housing and interior wall or ceiling covering.
Exception(s):
❑ Requirement is not applicable.
Plans reference page/section:
13.Vestibules.Doors that separate conditioned space from the exterior are protected with an enclosed vestibule,with all doors of the
vestibule equipped with self-closing devices.Vestibules are designed so interior and exterior doors to not operate simultaneously.
Exception(s):
❑ Doors not intended to be used as a building entrance door,such as doors to mechanical or electrical equipment rooms.
❑ Doors opening directly from a sleeping unit or dwelling unit.
❑ Doors that open directly from a space less than 3000 sq.ft.in area.
❑ Revolving doors.
❑ Doors used primarily to facilitate vehicular movement or material handling and adjacent personnel doors.
❑ Requirement is not applicable.
Plans reference page/section:
❑ 14.'Other'components have supporting documentation for proposed U-Factors.
Exception(s):
12( Requirement is not applicable.
Plans reference page/section:
Section 3: Compliance Statement
Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,specifications and
other calculations submitted with this permit application.The proposed envelope system has been designed to meet the 2014 Oregon Energy
Efficiency Specialty Code requirements in COMcheck Version 4.0.5.5 and to comely with the mandatory requirements in the Requirements
Checklist.
Ladan Ghobad- Energy Analyst
08/21/2017
Name-Title Signature Date
Project Title:
Data filename:\\Sacdata1\volume2\Users\LG\Projects\Tigard-Tualatin Durham Center\Report\COMcheck\DurhamCente c kort datPage/31of 3
l3 tiIgr7z7
its Sw a/Aum
co
WYATT ,. t: 1 ,
FIRE PROTECTION, INC.
ir
9095 SW. Burnham .) ;—‘,
t,:\
Tigard,OR 97223 ,,'
Fire Hydrant Fire Flow { ,t; t -az; 5fk.-
PROJECT Durham Elementary School
ADDRESS
7980 SW Durham Tigard, OR.
CROSS STREET
Flow
HYDRANT North of outside play area
LOCATION
STATIC 102
PITOT RESIDUAL 78
GPM 1475
GPM AT 20 PSI 6680 calculated per IVFPA 291
DATED 05.18.17 12:45 PM
MONITOR
HYDRANT 200' to the west
LOCATION
STATIC 102
RESIDUAL 97
DATED 05.18.17 12:45 PM
WITNESS
WITNESSED BY Kyle
TITLE
ORGANIZATION City of Tigard Public Works
SIGNATURE
PERFORMED BY Jack Gardner
< L � x 12102 i2CO2 7 ( 784
E8 62 1 813.• { f i 10y 811 , , l7'7 I '}} 7
.0I9M 25}26312 m ; yy � ; 7, " x, 7'g*
I l
r..
C1.
DURHAM RD U
13B00731313 6071 1817 :
t 1E ()Oft' . 1, Ei007 t 13E3.0079 13000T/13130078
. .o --
380072 12'. Dip' ,,,,:
.__ _._ .. . 1380075 _
21st C`r� ' i I,
t crt .
....43112= .i4 " Acat ur av
"*"°6-: :i
1
a . I
14''''M ' 10+N.- ' - .
Flow Hydrant l
• Durham 138005'1 ,
Monitor Hydrant 1ementary I
r {
-13111B)005a._. 13E340.a5 3Bt1#61 I
13811 13 B 4 . 6 L
.
1 10641360 3E1 3
.mm
,' , - • 4 � :1389062
t - . :pia, -14',..0:4 000°A. 4,10.0: - i 1
Feet 1 0
8►
.
,f ce,r7tuly
i
Aurrarra
�, 8 Elementary
1310. 4 Flow Hydrant
Ia
Monitor Hydrant
IA 4E4-*.. * 'is"4 "„ I :'
138t1113B0052
i3B0061 ,,IL,3BOtl5 X13 Btot� B C1J
13130068
13 80053
1:380069
I
.,CL
Feet £ x
0 1.-�. � 1380 !6