Permit (59) . bf
ipii CITY OF TIGARD BUILDING PERMIT
COMMUNITY DEVELOPMENT Permit#: BUP2018-00020
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 02/08/2018
TtcaR.L 9
Parcel: 2S110DB01300
Jurisdiction: Tigard
Site address: 15290 SW ROYALTY PKWY
Project: Card Subdivision: 1996-010 PARTITION PLAT Lot: 2
Project Description: TI for new tenant to Tigard:New demising wall and moving partition walls for office space.
Contractor: EMMETT PHAIR CONSTRUCTION Owner: TIGARD INVESTMENT PROPERTIES LLC
16650 FIR LANE 11086 SE OAK ST
LAKE OSWEGO, OR 97034 MILWAUKIE, OR 97222
PHONE: 503-572-8606 PHONE:
FAX:
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: VB DC Provision Review,COM TI-Ping 02/08/2018 $226.00
Occupancy Grp: B Occupancy Load: 27 Permit Fee-Additions,Alterations, 02/08/2018 $1,008.06
Dwelling Units: 0 Demolition
12%State Surcharge-Building 02/08/2018 $120.97
Stories: 2641 Height: 24 ft Plan Review 02/08/2018 $655.24
Bedrooms: 0 Bathrooms: 0 Plan Review-Fire Life Safety 02/08/2018 $403.22
Value: $87,000 Info Process/Archiving-Lg$2.00(over 02/08/2018 $20.00
11x17)
Address Fee 02/08/2018 $100.00
Floor Areas:
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $2,533.49
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Yes Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
Issued By: ��
���_ ._ Permittee Signature: _
-- lilt.
C. 60 .4176 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
Building Permit Application �q T to �y
Commercial MOISLAIQ 9t 1 FOR OFFICE USE ONLY
City of Tigard O 1/3 1' O U Date/By: Er ,r .-- Permit No.:lea. l 0000/0
- a 13125 SW Hall Blvd.,Tigard,OR 97223 n tJ
Phone: 503.718.2439 Fax: 503.598.1960 S 0 Z 8 E3 a- D "� Other Permit:
DateByPlan :Review
T I G A R D Inspection Line: 503.639.4175 Date Ready/By: 7uris: El See Page 2 for
Internet: www.tigard-or.gov ...tified/Method: �lf /° '" Supplemental Information
jai
7?
� :. ® rte,: a� s �,
TYPED OR I2�D D 1A 12-F MI :'
❑New construction ❑Demolition Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the
lir ' o. _ v
:: CATEgR oFCOISTRCZ �? = workindicated on this application.
❑ 1-and 2-family .a � < , :;
:f. Valuation: $
dwelling ''Commercial/industrial
0 Accessory building 0 Multi-family Number of bedrooms:
❑Master builder 0 Other: Number of bathrooms:
,
,
JOE SITE NF'QI2MkTtOg 116. t)CATI4 Total number of floors:
Job site address: 15 z ld s wa VIA)1 1 New dwelling area: square feet
City/State/ZIP: I'�( - ..l) i 6 g-7 z,44,, + Garage/carport area: square feet
40Suite/bldg./apt.no.: Project name: C/* R b Covered porch area: square feet
Cross street/directions to job site: Deck area: square feet
Other structure area: square feet
�QUII2EDDIYT'A:GO ER(IA.-T)SECICI(LJST' ;:
..,... .�,:�� � ��� �.. _.ate :.. :
Subdivision: Lot no.: Permit fees*are based on the value of the work performed.
Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all
equipment,materials,labor,overhead,and the profit for the
... � DESCRIPTI9,.�,9F.WO , work indicated on this application.
Valuation: $
'(realty-' IwI,Prou t- - -6- vte_4 o-Kite. Sr X7,000
N to L _-- coy P Ou-'FZ'h o- vi A-L i S, 'D lv
A Mc-VI-vs-1 Existing building area: square feet
A.,ge1/401 A v' e S(le,-• New building area: square feet
"0 PROPERTY OWNER TES " _ Number of stories: 1..
Name: GAR,D Type of construction: 17
Address: Ls tele s ) a L411 P Iiv l Occupancy groups:
City/State/ZIP:11,(AA174 Vt i- z.,2-4.— Existing: 5
Phone:(31 Cb)346 23 ex�k Fax/:( )
New:
�_❑ A P T ai Q .T'A;. N y "` DVIL 1N ` * -,"•
.: . .� .-11--,, D RIYIIT
FEES
CO ..::.' .leascreferlofeeschedrik)
Business name: �1 'i �,G41 r I.-1,. l 11,1st-vu4. i`O yI Structural plan review fee(or deposit):
Contact name: T'0,4,--01 c ch/C_LI
FLS plan review fee(if applicable):
Address: to 3Os $LJ 1tASet O Oc „s,-.1..., S L4...:+'{- e
Total fees due upon application:
City/State/ZIP: (-, L Oa 1,,j.p 661 a Q r_, C1:1") c'
Phone:( ) 6-2.4 ..7(¢( J "J Fax::( ) Amount received:
E-mail: 1_n V YY1 ,�1aOT 1 OLTAI S(L Alt.P. I $TEM'FE
�/1 .emel M� r / 1.x- _- E
Commercial and residential prescriptive installation of
: `.2.:. A.. ...®. .. . GTO Art..... .,...,`�: . .' _: . _ ,.• roof-top mounted PhotoVoltaic Solar Panel System.
Business name: JC 6...4,Y1.L0ue_ Submit two(2)sets of roof plan with connection details
and fire department access,along with the 2010 Oregon
Address: Solar Installation Specialty Code checklist.
City/State/ZIP: Permit fee(includes plan review
and administrative fees): $180.00
Phone:( ) Fax:( ) State surcharge(12%of permit fee): $21.60
CCB lie.: s?+e...„? Total fee due upon application: $201.60
Authorized signature: C.0.1.....k.1„..L.L.& This permit application expires if a permit is not obtained
,,..::let.Actwithin 180 days after it has been accepted as complete.
Print name: 17.1..“t C y-�- I Date: 2,....t, .J� * Fee methodology set by Tri-County Building Industry
Service Board.
I:\Building\Permits\BUP-COM PermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB)
4
_ Building Division
Accessibility: Barrier Removal Improvement Plan
TIGARD
REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241.
(1) Every project for renovation,alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains are readily accessible to individuals with disabilities unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five per-cent(25%).
VALUATION: Total of all renovation,alteration or modification being done,
excluding painting and wallpapering: [1] $ $7/�v
MULTIPLIER(25%barrier removal requirement): x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ Z f,-750
ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order:
(a) Parking
(b) An accessible entrance: $ WA.
(c) An accessible route to the altered area: $ N/A-
(d) At least one accessible restroom for each sex or a single unisex
restroom: $ gi06^^0
(e) Accessible telephones: $
(f) Accessible drinking fountains:and, $ f 1/A
(g) When possible,additional accessible elements such as storage and
alarms: $ N/A
TOTAL(shall equal line [2] of Valuation Computation): $
I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011
is City of Tigard • BUILDING DIVISION
■ Over-The-Counter (OTC) Building & Fire Protection System Permit
r 1 C,A R D Appointment Checklist
Permit Record#: ab
' Contact Name: Phone #: - 5--
Business
-Business Name: E - -(f 6Jf•a,. ( '3 Appt. Date/Time: aZfirMral
Site Address: l541 Ch/ ' , ' ,"""4 Bldg/Suite #:
` Project Name: CayA4 /
Cayce ({ g. p New Tenant? Yes D No
Project Description: 4,tom G{ajv�rs , Z„J4 .,.v„l Anoviil fr✓fi71 c.W AA 17 ivy �k 4
`` .
3 c Gy(. Gr,.vred I/GLtdr. A/1ice- 2 '/fir'9- .
Existing Use: New Use: g
MMD Required: 0 Yes No Related Record#:
APPLICATION SPECIFIC INFOR: `!1N
GENERAL INFORMATION
Z Class of Work: IA -r Occupancy Group: Type of Construction: V" j
Type of Use: Occupancy Load: ant;" Oregon Specialty Code: ')$-
I SPECIFICS
Number of Stories: )$ T ) Building Height: y_ Mixed Use:
Number of Dw Units: of Bathrooms: Number of Bedrooms:
BUILDING SQ FT-SCHOOL CET OTHER SQUARE FOOTAGES
Story Square Footage: Accessory Structure: Covered Porch:
Basement: Garage: Deck:
11 Total Square Footage: Carport: Mezzanine:
SETBACKS
AO
Sideyard Setback—Left Sideyard Setback—Front
Sideyard Setback—Right Sideyard Setback—Back
CONSTRUCTION
Exterior Walls: Openings Protected: Firewall Separation:
N: S: N: S: Occupancy Separation:
E: W: E: W: Access.Parking Spaces:
REQUIRED ITEMS
Fire Sprinklers: f CS Fire Alarms: Smoke Detectors:
Sprinkler Type: Alarm Type: Protected Corridors:
Standpipe Required: Pull Stations Required: Parapet:
Hazard Group: Battery Calcs Provided:
Density: Cut Sheets Provided:
Design Area:
K Factor:
Total Project Valuation: $ g7, 000 '.. S DUE
$ DC Prov Rvw,COM TI —Ping
$ Permit Fee—Add,Alt,Demo
DC Provision Review Fee for COM TI(effective 7/1/2017) $ J aQ. 97 12%State Surcharge
Project Valuation $ , Plan Review,Structural
Up to$4,999 $0.00 $ 0 _ _ Plan Review,Fire Life Safety
$5,000-$74,999 $91.00 $ __ $ Info Proc/Arch,Lg(over 11x17$2.00)
$75,000-$149,999 $226.00 $ Info Proc/Arch,Sm(up to 11x17$0.50)
$150,000 and over $361.00 $ Metro Construction Excise Tax
$ School Construction Excise Tax
$ Hourly Rate Fee
$ Hourly Rate State Surcharge
$ —o VIisc.Admin Fee 610.44"09)
$ . Other:
Building Staff: $ Other:
Date/Time: $a9 3,49 TOTAL FEES DUE
-f icA) -0D
I:\Building\Forms\OTC_BUP_FPS_070117.docx
4 2533,il
Renee Snyder
From: Oscar Contreras <OscarC@tigard-or.gov>
Sent: Thursday, January 25, 2018 11:26 AM
To: Tara Cantrell
Cc: Renee Snyder
Subject: RE: New address
Attachments: Oscar Contreras.vcf; 15292_15294_Plan.pdf
HI Tara, Renee,
I have completed your suite application and your two new suite numbers are listed below,the previous suite#15296 will
be retired.There is a $100 addressing fee which will need to be paid to our front desk staff, unfortunately we do not
have an online payment option for addressing fees at this time. Please keep in mind the Permit Center is only open Mon
—Fri.
15292 SW ROYALTY PKWY TIGARD OR 97224
15294 SW ROYALTY PKWY TIGARD OR 97224
I have also attached a copy of your plan document with the new suite numbers.
Let me know if there's anything else I can assist you with,
From:Tara Cantrell [mailto:tara@emmettphair.com]
Sent:Wednesday,January 24, 2018 3:50 PM
To:Oscar Contreras<OscarC@tigard-or.gov>
Cc: Renee Snyder<renee@emmettphair.com>
Subject: New address
Oscar,
We are going to be submitting for permit on a tenant improvement where we are demising a suite.We will need to
make new suite numbers. I've attached the application and site plan.There are currently (2) addresses for this building,
15296 and 15298 SW Royalty Parkway.We are demising 15296 into two suites.
Tara Cantrell, LEED AP ID + C, EDAC
541-521-7661
Tara(a)emmettphair.com
http://www.emmettpha i r.co m/
1
City of Tigard
II ■
w COMMUNITY DEVELOPMENT DEPARTMENT
T T G A R D Building Permit Review — Commercial - No Land U s e
Building Permit #: /1/4ge2Oi '-0)i
Site Address: 5 2610- S y./ R o of eW' 19 Suite/Bldg#:
Project Name: C A (21)
(Name of commercial business occupying the space. If vacant,enter Spec Space.)
Planning Review
Proposal: yr c40 r (WA] QWitt SeOC.. r If 'rlbr fc1rh(- Qrl
W(Akk.
Existing Business Activity: 0 GG4(,@,
Proposed Business Activity: 0 k(i C_L
Verify site address/suite# exists and active in permit system.
yrRiver Terrace Neighborhood: ❑ Yes gr.No
Zoning: C P
Permitted Use: 7 Yes ❑ No ❑ Spec Space
Confirm no land use required.
7 Business License:
Exists: ❑ Yes /1 No,applicant notified to obtain business license
Notes:
Approved by Planning: An` _ Date: 21 6 / ( �J
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Building Permit Submittal
Original Submittal Date: 0z/'/1 r
Site Plans: # 4//,,�,
Building Plans: #�
Building Permit#: nter building permit#above.
Workflow Routing: arming ❑ Permit Coordinator N—fittlrg
Workflow Sign off: [� �Si 'off for Planning(include notes from planning review)
Route Application Documents: E uilding: original permit application, site plans,building plans,engineer and
beam calculations and trust details,if applicable, etc.
Notes: '/
By Permit Technician: �_ " Date:
I:\Building\Forms\BldgPennitRvw_COM NoLandUse 060116.docx
Permit Coordinator Review
❑ Conditions "Met"prior to issuance of building permit
❑ Approved,NOT Released: Date:
Notes:
Revisions (after Building Submittal only)
Revision Notice 1: Date Sent to Applicant:
Revision Notice 2: Date Sent to Applicant:
Revision Notice 3: Date Sent to Applicant:
❑ SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes ❑ N/A
Tigard Trans SDC: ❑ Yes ❑ N/A
Parks SDC: ❑ Yes ❑ N/A
❑ OK to Issue Permit
Approved by Permit Coordinator: Date:
I:\BuildingForms\BldgPermitRvwCOM NoLandUse 070915.docx
City of Tigard
13125 SW Hall Blvd.
Tigard, OR 97223 Tel: 503.718.2439
Location: Inspection Date:
15290 SW ROYALTY PKWY, TIGARD, OR, 97224
Record Type: Record ID:
Commercial - Building BUP2018-00020
Inspection Type: Inspector:
299 Final inspection Jeff Grove
Result:
PASS - CofO
Comments:
Violation Summary:
Inspector Contractor